Warren Township Zoning Board of Adjustment s1

WARREN TOWNSHIP ZONING BOARD OF ADJUSTMENT.REGULAR MEETING JUNE 6, 2011.The regular meeting of the Board of Adjustment was called to order at 7:00 p.m. by Chairman Cooper in the new Municipal Court, 44 Mountain Blvd., Warren.THOSE PRESENT AT ROLL CALL: John Villani, Vincent Oliva, George Dealaman

Extreme Performance 1024 Rolling Door

ROLLING SERVICE DOORS.EXTREME PERFORMANCE 1024 ROLLING DOOR.GENERAL NOTES TO SPECIFIER.This specification section has been prepared to assist design professionals in the preparation of project or office master specifications. It follows guidelines established

Toughrock Architectural Specifications

ToughRock Architectural Specifications.1.0 Description of Work.A. Types of Work: The types of work herein specified include the following.1. Gypsum drywall applied to steel stud framing system.2. Gypsum drywall applied to wood framing.3. Gypsum drywall backing board as substrate for other finishes

The Ryland Group s2

PHASE SPECIFIC SCOPE OF WORK.CalAtlantic Homes Baltimore Division.66240 Door Hardware.Job: All Projects.I. Detailed Scope.1. The Subcontractor will supply and install privacy locks on all bedroom, bathroom, utility room, and powder room doors; passage

Are You Suprised ? s62

TENDER DOCUMENT.1) Construction of Compound Wall (front side.(2) Construction of Met Platform and.3) Construction of Musto Type Bench Mark (MBM.at site Govindapur (NH-5), CWC, Dist-Balasore, Orissa.ESTIMATED COST.Rs. 1,53,000/- (One lakh fifty three thousand) only.EARNEST MONEY

STATE of MINNESOTA Class Code: 000958

STATE OF MINNESOTA Class Code: 000958.CLASS SPECIFICATION Barg. Unit(s): 214.Professional work in hydrology, hydraulics, hydrogeology, water resource management, and ground water quality protection

BBC CDM Planning Sheet (Blank with Guidance)

BBC CDM Planning Sheet (Blank with Guidance).A General Details.B- Key Personnel.C- Description of proposed construction work required including key dates if known.D -Relevant Health & Safety Considerations; (e.g. Asbestos, Electricity, Stabilisation Method

CATS Plus F-B PRICE PROPOSAL FUNCTIONAL AREA 13

PRICE PROPOSAL FORM F-B.FUNCTIONAL AREA 13.Example of Task Order # 1.Tower Self Supporting 180-ft AGL.12 X 38 X 10-FT Equipment Shelter.SCOPE OF SERVICES AND SPECIFICATIONS.The Task Order Contractor (TO Contractor) shall purchase and provide all coordination

DNR Construction Permit Application

OPEN FEEDLOT 1 OR COMBINED 2 OPERATION.Construction Permit Application Form.Prior to construction, complete Section 1 to determine if a construction permit is required. If a construction permit is required, complete the rest of the form. Then, sign it

CIMS Issue #195 Cert III Construction Waterproofing - Elective Units

CIMS Issue #195 Cert III Construction Waterproofing - elective units.Ben Heaton, Sunshine Coast TAFE.Stakeholders consulted.MBA NSW Waterproofing Committee.Dean Holmes MBA State Compliance & Qualification Co-ordinator.Bill Straw, April Showers Waterproofing

Contractor Application Requirements

Contractor Application Requirements.A. Purpose- Contractor applications are for the provision of services on a Direct Purchase of Service (DPS) basis to qualified participants eligible to receive services under Title III of the Older Americans Act of

Trevor Achieved Chartered Civil Engineer Status in 1975

Trevor has worked in the pipeline business for over 58 years originally in the design, application and installation side of the business and later in manufacturing of pipeline mechanical couplings and valves for many differing applications

Manufacturers & Traders

TSIRCON CO LTD.MANUFACTURERS & TRADERS.OF BUILDING MATERIALS.TSIRCO-EXPAGROUT.Function: Tsirco-Expagrout is designed as a plasticising expansive aid for use is cement grouts and concrete to prevent shrinkage and bleeding

Langdon Planning Board s1

Langdon Planning Board s1

Langdon Planning Board.Unofficial Minutes.Langdon Municipal Building.Vice-Chairperson Pat Breslend called the meeting to order at 700pm. Chairperson Chops Polcari (Bob) had unavoidable commitments elsewhere.Pat is aware of this and has the keys.Pat passes out the new RSA books to all of the members

Lamoine State Park Boat Facility Upgrade

Notice to Contractors.Lamoine State Park Boat Facility Upgrade.Removal of existing concrete plank boat ramp, construction of new concrete abutment, installation of new concrete plank boat ramp, timber guide piles, rip rap, asphalt paving, concrete wheel

Section 03410 / ARCIS Panel (Rainscreen)

Sample Specifications.Section 03410 / ARCIS panel (rainscreen).1.1 Section includes.1.1.1 Shop cast prestressed precast cladding.1.1.2 Supports, anchors and attachments.1.2 Related Sections.1.2.1 051200 Steel Framing.1.2.2 054000 Cold-Formed Metal Framing 1.2.3 055000 Metal Fabrications