Temporary Shoring

Temporary Shoring

TEMPORARY SHORING. Temporary shoring includes cantilever, braced and anchored shoring and temporary mechanically stabilized earth (MSE) walls. Temporary shoring does not include trench boxes. At the Contractor s option, use any type of temporary shoring.

Master Schedule New Home Construction 4-28-03

Master Schedule New Home Construction 4-28-03

Alliance Drywall Services. I developed this list after building several new homes. I never planned to be a professional builder because that competes with my customers. Therefore, I m not a builder. But I do believe that if you have made the decision.

Agreement for Use of the Loading Dock And/Or Lift

Agreement for Use of the Loading Dock And/Or Lift

Agreement for Use of the Loading dock and/or lift.

907 County Office Building, Cairo NY 12413

907 County Office Building, Cairo NY 12413

Greene County Soil & Water Conservation District. 907 County Office Building, Cairo NY 12413. To:Contractor/Bidder. From:Jeff Flack. Re:FEMA Buyout Program Addenda 1. Pre-Bid Meeting Minutes, Questions, and Additional Information. Pre-Bid Meeting Minutes.

Inner-Tite Electric Meter Box Locks and Related Parts

Inner-Tite Electric Meter Box Locks and Related Parts

VENDOR CONTRACT #0000001014 Change Order #3. Change Order #3 Term: 10/01/2006 through 2/29/2008. INNER-TITE ELECTRIC METER BOX LOCKS AND RELATED PARTS. Metal Sealing Ferrule. Round Body for short barrel lock.

2009 Bridge Inspections

2009 Bridge Inspections

2009 Bridge Inspections. Dear Consultant. The Iowa Department of Transportation is contacting firms prequalified in Category 325 (Bridge Inspection and Analysis) to determine their interest in providing bridge inspection services.

Serra Mesa Planning Group

Serra Mesa Planning Group

Serra Mesa Planning Group. Post Office Box 23315, San Diego, CA 92193. Minutes of Serra Mesa Planning Group Regular Meeting. Serra Mesa/Kearney Mesa Library Community Room, 9005 Aero Drive. Call to Order: The meeting was called to order by Cindy Moore (Chair) at 7:05 pm.

26598 Design, Erect, and Dismantle Advanced Cantilevers

26598 Design, Erect, and Dismantle Advanced Cantilevers

Explanatory notes. 1This unit standard has been developed for learning and assessment on-job or off-job in a simulated environment. 2All tasks must be carried out in accordance with the Best Practice Guide (BPG) based on. aquality management systems

Design-Builder

Design-Builder

Design-Builder. PREQUALIFICATION QUESTIONNAIRE. VOIGT PARKING STRUCTURE. DESIGN-BUILD DELIVERY. Page 1 of 56 Addendum No. 1: 9-16-10. (Where a time period is given, such as the last ten 10 years, the period is to be measured backwards from the date this.

This Technical Prequalification Is Valid Only for Above-Mentioned Project and Will Not

This Technical Prequalification Is Valid Only for Above-Mentioned Project and Will Not

SUBCONTRACTOR PREQUALIFICATION QUESTIONNAIRE. insert project name, project no. and campus name here. This subcontractor prequalification is valid only for above-mentioned project and will not be considered as a basis for prequalification on other projects.

Section 00510 - Structure Excavation and Backfill

Section 00510 - Structure Excavation and Backfill

SECTION 00510 - STRUCTURE EXCAVATION AND BACKFILL. (Follow all instructions. If there are no instructions above a subsection, paragraph, sentence, or bullet, then include them in the project. The specifications may be modified to include project specific.

For Immediate Release Contact: Greg West

For Immediate Release Contact: Greg West

For Immediate Release Contact: Greg West. ICC-ES Verifies the Recycled Content of. European Copper s Chimney Pots. The ICC Evaluation Service (ICC-ES ) Sustainable Attributes Verification and Evaluation (SAVE ) program has issued European Copper a Verification.

Energy Simulation in Building Design

Energy Simulation in Building Design

Energy Simulation in Building Design. Project Assignment 1 DUE: November 2, 2017. The purpose of this project is to learn to use an eQUEST software tool and conduct parametric analysis. You should analyze energy consumption in a duplex house (2 floor.

Car Increase in Cao

Car Increase in Cao

Council Agenda Report. Increase In Construction Change Order Authority For The Punta Gorda Street Bridge Replacement Project. CITY OF SANTA BARBARA. COUNCIL AGENDA REPORT. Council Agenda Report. Increase In Construction Change Order Authority For The Punta Gorda Street Bridge Replacement Project.

Conservation Casework Log Notes October-December 2014

Conservation Casework Log Notes October-December 2014

CONSERVATION CASEWORK LOG NOTES OCTOBER-DECEMBER 2014. The GHS conservation team received 417 new cases in England and 11 new cases in Wales between October and December (inclusive), in addition to ongoing work on previously logged cases. Written responses.

08 80 00 4000 Sunroom Series

08 80 00 4000 Sunroom Series

08 80 00 4000 Sunroom Series. 1.01 SECTION INCLUDES. A. This section covers all work necessary for the execution and completion of skylight(s) as shown on drawings and specified herein.