BBC CDM Planning Sheet (Blank with Guidance)
A – General Details
Date / Date of requestDivision / Programme / If applicable
Location / Location of proposed works
Name of Set / Area of works / Set / Production / Room / Stand
Proposed Start Date / When work is scheduled to start
Estimated Finish Date / Approximate finish date
B- Key Personnel
Requested by / NamePrincipal Designer ( >1 Contractor) / Only required if there is more than 1 Contractor
Designer / Name
Construction Lead (>1 Contractor) / Only required if there is more than 1 Contractor
Construction Manager / Name
Other / Name
C- Description of proposed construction work required including key dates if known.
Examples:· Refurbishment of Persian Studio for WS. To include strip out of existing desks and servers, new electrical connections. Replacement of existing lighting with ‘Soundlight Comfort’. Refurbishment Asbestos survey scheduled w/c 22 Mar
· Creating a set for Hootenanny 13th April. Lighting Grid, Scenery, 6x band and drum risers, Audience rostas, painting of studio floor. Load in starts 16:00 8th April, Set sign off 10th April PM. Band audio load 11th April. Floor paint 12th April am. TX 13th @ 22:00. De Rig starts 23:00, Hand Back 08:00 15th April.
· Construction of 5 x ‘sets’ and dividing wall for The Cheese Files. Construction in hanger at RAF Clifton, asbestos survey available. No requirement for utilities connection. 415v & 240v connections available (RAF FM to provide all necessary details). Dividing wall to height of hanger, not fire resisting. External contractor for wall build, tenders out w/c 10th Feb
D -Relevant Health & Safety Considerations; (e.g. Asbestos, Electricity, Stabilisation Method, Working at Height, Manual Handling, Chemicals, Noise, Dust, Services , requirements for Permits etc) [PCI Aide memoire provides further guidance]
Examples :· Set ‘flats’ weigh > 30 Kg – 2 Person lift
· Flats connect at > 2.5M safe method of access required
· Adjustments may be required on set – Power tools to be battery operated or 110v
· Flat C secured to existing fabric of building – check asbestos register for area)
· Painting required – COSHH sheets required
· Gas fire to be disconnected and blanked – (Gas Safe Engineer)
· Permit required for roof access
· Vehicle movements in congested area – supervised reversing
E – Project Administration
Security: / Contacts if applicableFire: / Emergency Procedures
First Aid: / Arrangements for
Access: / Arrangements if non BBC or out of hours
Parking: / Arrangements for
Welfare: / Toilets and break room situated next to Security Office. Canteen available on first floor
Client – Out of hours / Contacts if applicable
Design Changes / Name
BBC Safety / Contacts if applicable
F – Other Considerations
For example : any associated paperwork such as technical specifications, designers drawings etcUse of the form
Once the form has been completed, what happens next will to some extent depend on the scale and nature of the proposed construction activity;
If your project is classified as a Small construction related task, then you should consider this document as a simple planning document and share it with the contractors and designers and any other team members who are involved in the construction work. For small straightforward tasks, contractors should in turn have risk assessments /method statements / safe systems of work in place to allow the work to be undertaken safely.
If your project fits into the Medium Construction Related Project category, then this document could be considered as either pre construction information or a construction phase plan dependent on the size and nature of the project. Either way again it should be shared with all contractors and designers, and any other team members who are involved in the construction work.
If your project looks like it will fit into the Large Construction Related Project category, then this document should be considered as a planning sheet. Given the scale of the project the requirements for the amount of pre-construction information required and the detail in the construction phase plan will likely necessitate the need for more in depth paperwork.
CDM Planning Sheet Blank with Guidance V5