INSTALLATION GUIDELINES.In Wall Vapor Retarder Instructions.Attention: Read these instructions thoroughly before installation to ensure proper use of the product. DURA-SKRIM 6WW vapor retarder is typically used on the inside of the outer wall of habitable rooms to retard vapor
General spec. notes.References in blue are general indicators to the specifier.References in red relate to fire-rated assemblies and Code Related.if not used can be deleted, but may be needed in the future.DRYWALL/PLASTER SUSPENSION SYSTEM
Acoustic suspended ceiling description.Range Lauder LINEA - Product reference 2.9.10.Patented system.Suspended ceiling lot.The suspended ceiling will be created using 2.9.10 panels product reference from the Lauder LINEA range of the Laudescher brand
NAF Construction Project Development and Approval.Appendix B. Management Control Evaluation Checklist.The function covered by this checklist is NAF construction project development and approval
Standard specification for the application of De Boer Duo HT 4 Slates/F C180 Two-Layer waterproof roofing membrane to concrete surfaces.Standard Specification.This specification is for the application of a De Boer Duo HT 4 Slates/F C180 roll-roofing membrane system, in a two-layer configuration
Appraisal of Transport Policy and Strategic Plans in Canadian Urban Areas: A survey of Planners and Policy-Makers in Government Agencies across Canada.Hatzopoulou, M.1 and Miller, E.J.2
FOR IMMEDIATE RELEASE.RIVERS OF STEEL HERITAGE CORPORATION.Mini-Grant Applications Available.Rivers of Steel Heritage Corporation s Mini Grant program is designed to assist heritage-related sites and organizations, as well as municipalities, within our
PROSOCO R-GUARD CAT 5 Rain Screen Specification for EXTREME Weather Air and Water-Resistive Barrier.Specifier Note: The information provided below is intended to guide the Architect in developing specifications for products distributed and/or manufactured
Course Title: Hazards Risk Management.Session 8: The Mitigation Plan.8.1 Discuss what a Mitigation Plan is and why it is conducted.8.2 Explain what the common components of a Hazard Mitigation Plan are, and why they are included in the plan
ENROLLED ORDINANCE NO. 16-004.AN ORDINANCE AMENDING TITLE 17 ZONING TO REVISE CHAPTER(S) 17.12 ZONING DISTRICTS DESIGNATED , 17.16 GENERAL REQUIREMENTS , 17.28 A RESIDENTIAL DISTRICT , 17.32 B RESIDENTIAL DISTRICT , 17.36 BGA RESIDENTIAL DISTRICT , AND
BOARD OF TRUSTEES MEETING.BOARD MEMBERS PRESENT: Jimmie McCamic, Chairman; Greg Marquart, Secretary/Treasurer; Leslie Nutting, Tony Werner, Robert M. Baker.BOARD MEMBERS ABSENT.ALSO PRESENT: Dottie Thomas, Library Director; Amanda Berisford, Secretary/Bookkeeper
Supplementary Material.Habitat fragmentation reduces occupancy of nest boxes by an open-country raptor.JESSI L. BROWN, MICHAEL W. COLLOPY, and JOHN A. SMALLWOOD.Appendix S1. Details of nest box construction; FRAGSTATS metrics equations; Prior probabilities
CCG2 Project Scope Section 12 Roadway IR Draft2 CCG2 Project Scope Section 12 Roadway IR Draft.The Developer shall design and construct all roadways, parking lots, and associated roadway items including earthwork, pavements, curbs, medians, islands, barriers
50TH STREET SIDEWALK.SPECIAL BULLETIN.Construction to build a new sidewalk on NE 50th Street between the Ronald McDonald House and Sandpoint Way will likely begin the week of November 17, 2003. Construction will take about eight weeks, or longer depending upon weather
ITS Projects Systems Engineering Analysis FORM (SEAFORM) for Municipal Traffic Management Systems.The Checklist needs to be filled out by the Project Manager. Please refer to the guidance document accompanying the checklist for information on the checklist items as well as a completed example
Heating and Cooling in the CH2 Building.Lu Aye and R. J. Fuller.International Technologies Centre (IDTC).Department of Civil & Environmental Engineering.The University of Melbourne.Victoria 3010, Australia