EXHIBIT A Statement of Work.MAINTENANCE AND REPAIR OF HVAC and BOILER HEATING SYSTEMS AT ADAMS COUNTY PENNDOT, 1185 FAIRFIELD RD, GETTYSBURG, PA AND STOCKPILES THROUGHOUT ADAMS COUNTY.CONTACT PERSON
TECHNICAL GUIDE PECIFICATIONS.This guide provides technical information and specifications for Perfect Power System s s.Wave Rider 3 central lighting inverter system.The Wave Rider 3 is a high reliability, three-phase, solid-state, double conversion
NATURAL RESOURCES CONSERVATION SERVICE.CONSTRUCTION SPECIFICATIONS.fence - WOVEN WIRE.See Standard Drawing Number FEN-382-WOV..A. Wire Spacing.The base of the woven wire shall be placed near the ground surface. The top wire shall be at least 42 inches
Meeting Minutes.STATE BOARD OF BUILDING REGULATIONS AND STANDARDS.S: BBR BBRS AGENDA 2012 Agenda 02 February BBRS Minutes February 14, 2012.A meeting of the Board of Building Regulations and Standards (BBRS) was held at 1 p.m. on Tuesday, February 14
METRO GOLD LINE FOOTHILL EXTENSION.CONSTRUCTION AUTHORITY.REQUEST FOR STATEMENTS OF QUALIFICATIONS.PHASE 2B ALIGNMENT DESIGN-BUILD PROJECT.RFQ C2002 Issued November 8, 2017 Addendum 1 Issued November 20, 2017 Addendum 2 Issued December 14, 2017.FORMS IN WORD FORMAT December 19, 2017
Duo-Gard Industries Inc.40442 Koppernick Road.Canton, Michigan 48187.1.1 SECTION INCLUDES.A. Bicycle shelters.A. Federal Specifications (Fed. Spec.).1. QQ-A-200/9C(1) Extruded aluminum members 6063-T5, et. al.2. TT-S-001657 Sealants, Type 1.B. American Society for Testing Materials (ASTM)
A. Section Includes.SELECT ITEMS TO BE INCLUDED.1. Manufactured Pre-engineered metal stairs.2. Handrails and railings attached to metal stairs.3. Handrails attached to walls adjacent to metal stairs.4. Railing gates at the level of exit discharge
suspended access support EQUIPMENT and fall restraint equipmentNote: This specification should be modified to suit a specific project. This specification does not include the design and installation of davits, outrigger beams, and horizontal cable or monorail systems.1.1 SUMMARY Section Includes
Park Conservation District.5242 Highway 89 South Livingston, MT 59047.REGULAR BOARD MEETING.USDA Building, Conference Room, 5242 Hwy 89 South.BOARD MEMBERS PRESENT: ; Martin Davis, vice-chair, Ned Zimmerman, Daryl Stutterheim
2017-2018 Façade Grant Program Overview.The façade grant program provides matching funds for exterior improvements to historic non-residential structures. It is designed to provide incentive funds to property owners in the Historic District to increase
R-6/SPECIAL PROJECT SPECIFICATION.Section 603C - Concrete Slurry May 25, 1999.603C.01 Work. Furnish and install a concrete slurry mix for bedding pipe, pipe arches and grouting riprap at the inlets of pipe arches
1. At the meeting of 25 January 2006 the Committee resolved that listed building consent should be granted for alterations to listed buildings forming part of the proposed restoration of the C19th sunken garden (05/02706/LBC). Because of the Borough Council
CSI SECTION 09 24 00 PORTLAND CEMENT PLASTER.Teifs Fiber Reinforced Stucco with Enhanced Water Resistive Barrier and Optional Krak-Shield.1.1 SECTION INCLUDES.A. Supply and Installation of TeifsScratch and Brown WaterMaster HE (High Efficiency) Stucco Assemblies.1.2 RELATED SECTIONS
SUGGESTED MASTER SPECIFICATION.SECTION 03 15 13 WATERSTOPS PART 1 GENERAL.1.01 SECTION INCLUDES.A. Basic Use: PVC waterstops are designed for use in concrete joints subjected to hydrostatic pressure. Embedded in concrete, waterstops span the joint, forming
STEEL JOIST GIRDERS.1.01 PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION.A. Anchorage devices required to be built into masonry/concrete construction shall be installed under the Work of the applicable masonry/concrete section.1.02 RELATED WORK SPECIFIED ELSEWHERE
Section 1 Contact Information.Section 2 Project Overview.All completed forms are to be returned to.Naomi Bickerdike.Sport & Community Liaison Officer