Dorma BEYOND Pinch Free Pivot Door

ALL-GLASS ENTRANCES.Dorma BEYOND Pinch free Pivot Door.A. This Section includes all-glass entrance doors and supplementary items required for installation of the following types of doors.1. Interior doors.2. Vestibule doors.B. Related Sections include the following

Scope of Work - Furnish All Necessary Materials, Labor and Equipment for the Complete

Scope of Work - Furnish all necessary materials, labor and equipment for the complete installation of aluminum hinged glass doors for this project as shown on the drawings and herein specified. Doors shall be the Series 1420 as manufactured by Thermal

Water Vapor Emission Control System

WATER VAPOR EMISSION CONTROL SYSTEM.FOR CONCRETE SLABS.NOTE TO SPECIFIER Koster American Corporation; Waterproofing, vapor-proofing, oil contamination remediation, and resurfacing concrete substrates. . This section is based on the products of Koster

Community Input

Community Input.Comprehensive Plan Update.Concrete is in the process of amending the Comprehensive Plan to cover the 20 years from 2016 to 2026. As part of the update the Town Planner and Planning Commission are looking for input from the community on

Office Building Manager Ii

FINAL EDITED TASK LISTING.OFFICE BUILDING MANAGER II.NOTE: Each position within this classification may perform some or all of these tasks.Inspects and/or directs changes, modifications and/or alterations in mechanical, electrical, and other building

4-Wing Manual Revolving Door

4-Wing Manual Revolving Door

4-Wing Manual Revolving Door.Division 8 - Doors and Windows Section 08740 - Manual Revolving Doors.1.01 SECTION INCLUDES.A. Provide complete manual revolving door assemblies which have been fabricated, assembled and tested for proper operation at the

Means of Recording Enquiries

An achievable standard.The ArbAC scheme sets a standard that is achievable by all good tree work contractors.The Standards are broken down into four modules as follows.Module 1: Worksite Safety Inspection.Module 2: Work Quality Inspections and Arboricultural Knowledge

C12 Timber Structures

C12 Timber structures.1. week Introduction to advanced timber structures.History of building construction (timber framed houses, roof and wall structures, bridges), wood as a structural material (technical and non-technical characteristics), potential of timber in building sector

Guide Specification for 3405: Hot-Applied, Single Component, Polymeric Joint Sealing Compound

GUIDE SPECIFICATION FOR 3405: HOT-APPLIED, SINGLE COMPONENT, POLYMERIC JOINT SEALING COMPOUND.SECTION 02760 - PAVING SPECIALTIES: HORIZONTAL JOINT SEALANT.SECTION 32 13 73.16 (MasterFormat 2004) FIELD MOLDED CONCRETE PAVING JOINT SEALANTS.1.01 SECTION INCLUDES

Metro Nashville Planning Commission

Metro Nashville Planning Commission.700 2nd Avenue South.Matthew Strader, Lindsey Langley.Community Organizers.Subject: 20015CP-012-001 & 2015SP-012-001 (Community Plan Amendment & NRM Batch Plant)

HEAT TRACING for PLUMBING PIPE (SR Cable)

HEAT TRACING FOR PLUMBING PIPE (SR Cable).1.1 SECTION INCLUDES.A. Field terminated Self Regulating (SR) heating cable.C. Pipe heat tracing accessories and installation material for a complete operating system.1.2 RELATED SECTIONS

Section 221116 - Domestic Water Piping s1

Copyright 2010 AIA MasterSpec Short Form 03/10.PRODUCT MASTERSPEC LICENSED BY ARCOM TO TYCO INTERNATIONAL, GRINNELL MECHANICAL PRODUCTS.Copyright 2010 by The American Institute of Architects (AIA).Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

The Following Section Shall Be Made a Part of the Standard Specifications

SECTION SP 44 CEMENT RUBBLE MASONRY.Make the following amendments to said Section.(I) Amend 44.1 DESCRIPTION to read as follows.This item of work covers the CRM walls to lines and grades shown on the plans. The connection to existing walls shall be matches

Dubuque County Board of Adjustment s2

Zoning Commission Meeting Minutes October 20, 2015.Dubuque County Zoning Commission.Chairperson Mary Klostermann called the meeting to order at 6 p.m.1. ROLL CALL: Members present: Mary Klostermann, John Goodmann, Kevin Soppe, and Leo Gansen. Staff Present: Anna O Shea & Tammy Henry

Section 04 23 00 Glass Unit Masonry

DIVISION 4 MASONRY.SECTION 04 23 00 GLASS UNIT MASONRY.1.01 RELATED DOCUMENTS.1. Drawing and general provisions of Contract, including General and Supplementary Conditions and Division-1 specification section, apply to work of this section.1.02 DESCRIPTION OF WORK

HIGHWAY TRAFFIC ACT - O. Reg. 231/12

ontario regulation 231/12.made under the.Highway Traffic Act.Made: August 15, 2012 Filed: August 16, 2012 Published on e-Laws: August 17, 2012 Printed in The Ontario Gazette: September 1, 2012.Amending Reg. 619 of R.R.O. 1990