Mortar-Placed Stone Assemblies

MORTAR-PLACED STONE ASSEMBLIES.1.1 SECTION INCLUDES.A. Section includes solid masonry construction of base supported natural full stone veneer, set in cement mortar, with a structural back-up of masonry or metal lath on a structural backing

Section 02829 - Electric Gate Operators s1

ELECTRIC GATE OPERATORS.Display hidden notes to specifier by using Tools / Options / Display / Hidden Text.NOTE TO SPECIFIER LiftMaster; Electric Gate Operators.This section is based on the products of The LiftMaster Group, Inc., which is located at.300 Windsor Drive.Web: LiftMaster.com

Primary Manufacturing Processes

INTERIOR FINISHING.A. Interior finishing work consists of placing final coverings on the ceilings.walls, and floors, as well as installing the cabinetry and millwork.B. In addition, the utility systems roughed in during earlier phases are.completed during this phase of construction

9934 Construct Interior Wooden Support Structures for Boats

Construct interior wooden support structures for boats.Purpose People credited with this unit standard are able to: establish job requirements for the construction of interior wooden support structures; prepare for joinery construction; and construct joinery to specifications

1.1 the Intelligent Precision Air-Conditioning System Shall Be a Climateworx Series 7 Model

1.1 The intelligent precision air-conditioning system shall be a ClimateWorx Series 7 model _____.1.2 The unit shall be designed specifically for telecommunication, computer and critical equipment room environmental control with automatic monitoring and

Adventure Works Fourth Quarter Earnings Announced Page 2 s1

Adventure Works Fourth Quarter Earnings Announced Page 2.Oklahoma Department of lABOR.media Release.Commissioner Costello Kicks Off Educational Awareness Campaign.Oklahoma Department of Labor Helps Fight Growing Number of Unlicensed Locksmiths

Aluminum Component Pipe Railings

ALUMINUM COMPONENT PIPE RAILINGS.1.01 SECTION INCLUDES.A. Aluminum component pipe handrails and railings.1.02 RELATED REQUIREMENTS.A. Section 02 9000: Landscaping: Installation Location and Coordination.B. Section 03 3000: Cast-in-Place Concrete.C. Section 03 4000: Precast Concrete

Section 06447 - Balustrade Systems

BALUSTRADE SYSTEMS SPECIFICATION 06447.Display hidden notes to specifier by using Tools / Options / View / Hidden Text.NOTE TO SPECIFIER Spectis Moulders Inc., polyurethane moldings, balustrade systems.This section is based on the products of Spectis Moulders Inc., which is located at

State of California Department of Transportation s1

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION.ARCHITECTURAL & ENGINEERING (A&E) CONSULTANT EVALUATION FORM FINAL EVALUATION - PRESENTATION AND INTERVIEW.Qualifications-Based Selection.Comments (continue on reverse if necessary)

4332Kf Mobile Desk

4332KF MOBILE DESK.ASSEMBLY INSTRUCTIONS.*Model views may not represent exact model purchased.TABLE OF CONTENTS.REVISIONS TABLE . . . 3.ASSEMBLY COMPONENTS . . . 3.CASTER ASSEMBLY . . . . 4.PULL ASSEMBLY . . . . . 5.ASSEMBLY COMPONENTS.REV DESCRIPTION DATE INITIAL.Assembly Instructions for

Information Technology Summary

Long-Range Building Program.Purpose - The Long-Range Building Program was initiated in 1965 to provide funding for construction and maintenance of state buildings. The LRBP was developed in order to present a single, comprehensive and prioritized plan

Model Paper for EASEC-9

Eleventh East Asia-Pacific Conference on Structural Engineering & Construction (EASEC-11), Taipei, TAIWAN.PERFORMANCE OF PARTIAL CAPACITY DESIGN ON FULLY DUCTILE MOMENT RESISTING FRAME in highly seismic area in Indonesia.I. MULJATI 1 , B. LUMANTARNA 2

A. Standard Type Lockers (Traditional Collection)

SECTION 10 5113 - METAL LOCKERS.1.01 SECTION INCLUDES.A. Standard type lockers (Traditional Collection).B. Heavy duty type lockers (Traditional Plus Collection).C. Athletic type lockers (Competitor Collection).D. Stadium type lockers (Pro Collection).E. Angle Iron Lockers (Fully Welded)

Building Description

BUILDING DESCRIPTION.Building Description 209.A n important part of every appraisal is the description of the building or buildings on the site. An appraiser describes each building's design, layout, and construction details, which include structural

Manual Chamber Vent

Manual Chamber Vent.Use this procedure to manually vent the chamber. To automatically vent the chamber.refer to Automatic Chamber Vent Procedure.Reference Documentation: Chamber Pump/Purge-Automatic Procedure.Equipment Required: None.1. Perform the Chamber Pump/Purge-Automatic Procedure

Planning and Zoning Commission s2

Planning and Zoning Commission.CITY OF COLLEGE STATION, TEXAS.CITY HALL COUNCIL CHAMBERS.COMMISSIONERS PRESENT: Rick Floyd, Ben White, Carolyn Williams, Wallis McMath, Craig Hall and Scott Shafer.COMMISSIONERS ABSENT: Phil Trapani.COUNCIL MEMBERS PRESENT: John Happ