Metal Athletic Lockers Section 10505 s2

Unibody All-Welded.Primary, Primary II and Primary Jr. Cubbieä.General: Cubbies shall Be Hallowell Unibody All-Welded Primary, Primary II and Primary Jr. Cubbie as manufactured Hallowell, Div. List Industries Inc. or approved equal. All cubbies shall

Tea Zakula ()1, Peter Armstrong2, Leslie Norford1

Optimal coordination of heat pump compressor and fan speeds and subcooling over a wide range of loads and conditions.Tea Zakula ()1, Peter Armstrong2, Leslie Norford1.1Massachusetts Institute of Technology, Cambridge, MA.2Masdar Institute of Science and Technology, Abu Dhabi, UAE

Bacnet Protocol Implementation Conformance Statement

BACnet Protocol Implementation Conformance Statement.Vendor Name: Danfoss Power Electronics A/S.Product Name: VLT HVAC Drive FC-102.Product Model Number: FC-102.Applications Software Version: 1.5 Firmware Revision: 1.5 BACnet Protocol Revision: 5.Product Description

AMERICAN SOCIETY of CIVIL ENGINEERS, Seattle Section, Papers. 2.5 L.F

AMERICAN SOCIETY OF CIVIL ENGINEERS, Seattle Section, papers. 2.5 l.f.ABSTRACT: The American Society of Civil Engineers - Seattle Section is a professional organization of engineers in the state of Washington dedicated to the advancement of the science

CS-214 Position Description Form s26

State of Michigan.POSITION DESCRIPTION.TO BE FILLED OUT BY APPOINTING AUTHORITY.TO BE FILLED OUT BY EMPLOYEE.NOTE: Make a copy of this form for your records

Display Hidden Notes to Specifier. (Don't Know How? Click Here) s28

EXPANDED POLYSTYRENE GEOFOAM.Display hidden notes to specifier. (Don't know how? Click Here).Copyright 2016 - 2016 ARCAT, Inc. - All rights reserved.NOTE TO SPECIFIER Shelter Enterprises, Inc.; expanded polystyrene building products. This section is

Mechanical Stabilized Earth Walls

STATE OF OHIO DEPARTMENT OF TRANSPORTATION.SUPPLEMENTAL SPECIFICATION 840.MECHANICALLY STABILIZED EARTH WALL.840.04 Design and Submittal Requirements.840.05 Fabrication and Acceptance of Precast Concrete Facing Panels.840.07 On-Site Assistance.840.08 Method of Measurement.840.09 Basis of Payment

Operations Leveling Bid Request CHECK LIST

Town of enter town name Leveling Bid Request CHECK LIST (Include with RFP).NOTE: If cold planing is not part of the project bid item, delete the table above and this note.Add table for reclaim if that is part of a projects treatment. Same goes for pavement preservation treatments

Architectural and Engineering Specifications for Aigis Mechtronics

Architectural and Engineering Specifications for Aigis Mechtronics

Architectural and Engineering Specifications for Linear Corp. LLC.AT-FSTG(S or D)XX(XX) Pedestrian Control Devices (Turnstiles).TECHNICAL SPECIFICATIONS Security Systems.CSI Division 13740 Pedestrian Control Devices.1.01 SECTION INCLUDES

Middleborough Zoning By-Laws

Middleborough Zoning Bylaws.DRAFT RECODIFICATION.BY: RECODIFICATION TASK FORCE.TABLE OF CONTENTS.SECTION 1.0 PURPOSE AND AUTHORITY 8.1.4.1 Applicability; Nonconformities. 8.1.4.2 Commencement of Construction or Operation. 8.1.7 ADDITIONAL INFORMATION. 9.SECTION 2.0 DISTRICTS 9

Central Air Conditioning Systems

Harmony Airconditioning is fastest growing air-conditioning company with a huge network of office, Modern facilities of over 2000 sq feet and around 40 plus employees. It fulfills the air conditioning needs of a large number of corporate and commercial

Resilient Safety Wall Padding

Specifier leave this line)) SBBC Design & Material Standards, January 01, 2010 Edition.RESILIENT SAFETY WALL PADDING.1.1 SECTION INCLUDES.A. Protection wall padding (walls, floors, doors, frames, and ceilings) in time out rooms as indicated on the drawings and specified here in.1.2 RELATED SECTIONS

Recur.Spec. Prov s1

MECHANICALLY STABILIZED EARTH RETAINING WALLS.The Standard Specifications are revised as follows.SECTION 731, BEGIN LINE 1, INSERT AS FOLLOWS.SECTION 731 MECHANICALLY STABILIZED EARTH RETAINING WALLS

Table 2 Chinook Strategies, Gaps, and Prioritized Funding for Each MPG (1/29/2010)

Table 2 Chinook Strategies, Gaps, and Prioritized Funding For Each MPG (1/29/2010).Table contains edits from Hesse 11/18/09, Schuck SBT 11/20/09, CTWSRO 11/20/09.Table Last Modified On Monday, November 30, 2009 Page 68

Design Specification

Design Specification.General contractor to furnish and install Dynaflair Mini-Shutter in prepared opening.Curtain to be insulated.Tubular bottom bar with cylinder lock.Operation to be (push up) (crank)(motor) mounted on the (right) (left)

Aluminum Sunshade

ALUMINUM SUNSHADE.A. Section Includes: Louvered Sunshade.B. Related Requirements: Division 1 General Requirements.A. The publications listed below form a part of this specification to the extent referenced. Publications are referenced within the text by the basic designation only