Krakow Township Presque Isle County Zoning Ordinance

KRAKOW TOWNSHIP PRESQUE ISLE COUNTY ZONING ORDINANCE.KRAKOW TOWNSHIP PRESQUE ISLE COUNTY ZONING ORDINANCE.SHORT TITLE AND PURPOSE 1.GENERAL PROVISIONS 17.Section 4.1 The Effect of Zoning 17.Section 4.2 Conflicting Laws, Regulations, and Restrictions: 21

U.S. Department of Housing and Urban Development s11

Revised VORYS DRAFT 10/30/2008.U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.SECTION 232 LEAN PROGRAM.EARLY COMMENCEMENT OF CONSTRUCTION CHECKLIST.Project Location.FHA Project Number:

Long Document to Renewable Energy Assurance Limited

Metering and Monitoring Service Package (MMSP) Model Agreement.NOTES FOR CONSUMERS.Participants in the Domestic Renewable Heat Incentive scheme (as well as applicants to the scheme) may also apply under the scheme to register for the Metering and Monitoring

Mexico: Urban Transport Transformation Project

MEXICO: urban transport TRANSFORMATION PROJECT.EXECUTIVE SUMMARY OF THE DRAFT ENVIRONMENTAL AND SOCIAL.This report summarizes the Environmental and Social Management Framework ( Marco de salvaguarda ambiental y social para el programa nacional de

Neoprene and Silicone Joint Systems

Neoprene and silicone Joint Systems.SECTION 717.10 PREFORMED COMPRESSION SEAL.717.10.1 Description. This work shall consist of furnishing and installing a preformed compression seal for joints as shown on the plans or as directed by the engineer. Structural

To Specify Our Product

TO SPECIFY OUR PRODUCT.IN YOUR PROJECT.ARCHITECTURAL SPECIFICATIONS.FOR NGS HEAVY DUTY AUTOMATIC SWING DOOR OPERATOR.THE AUTOMATIC DISABLE TOILETS ARE TO BE AS FOLLOWS.The Automatic Door Operator is to be a fully electric operator, housed in an extruded

User's Guide to Contracting s2

Purchasing Policy No. 3.Exhibit 1, Page 2 of 2.Purchasing Department.CONTRACT OPPORTUNITY ANNOUNCEMENT.Contract Opportunity Description.Suppliers interested in pre-qualifying for this work should contact the PG&E Representative listed below by 02/28/2012

Cementitious Decks and Underlayment

CEMENTITIOUS DECKS AND UNDERLAYMENT.A. Section Includes.1. Gypsum Cement Floor Underlayment.B. Related Documents.1. Drawings and General Provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to work of this Section

Maintenance and Repair of Heating Systems At

EXHIBIT A Statement of Work.MAINTENANCE AND REPAIR OF HVAC and BOILER HEATING SYSTEMS AT ADAMS COUNTY PENNDOT, 1185 FAIRFIELD RD, GETTYSBURG, PA AND STOCKPILES THROUGHOUT ADAMS COUNTY.CONTACT PERSON.Greg Lawrence

RFP Title: EIFS Exterior Wall Replacement

RFP Title: EIFS Exterior Wall Replacement.RFP Number: REFM-2016-27-BD.COST PROPOSAL FORM Revision 1.PROJECT: Edmund D. Edelman Children s Court EIFS Exterior Wall Replacement.RFP Number: REFM-2016-27-BD.To: Judicial Council of California.Proper Name of Firm

Steel Joist Framing

STEEL JOIST FRAMING.This template must be edited for each project. In doing so, specifier must add job-specific requirements. Brackets are used in the text to indicate designer choices or locations where text must be supplied by the designer. Once the

A Case Study of Servitization in Construction

A Case Study of Servitization in Construction.Finding New Ways of Appropriating Value.William Robinson, Paul Chan, and Thomas Lau.William Robinson is a PhD student in the School of Mechanical, Aerospace and Civil Engineering at the University of Manchester

Application: Roofing

APPLICATION: ROOFING.ASSEMBLY: FABRIC REINFORCED.MONOLITHIC MEMBRANE 6125-FR.LONG FORM SPECIFICATION.PART I GENERAL.A. This specification serves as a guideline and shall be adapted to suit the needs of each individual project by the architect. It is prepared

List of Documents for Initial Load Testing of Pile Including Construction of Test Pipes

List of Documents for Initial Load Testing of Pile including Construction of Test Piles for Proposed ESIC & ESIMB Building at GB Block, Sector -III, salt Lake City, Kolkata.NIT No. ERO/MMD/ESI/0808.INITIAL LOAD TESTING OF PILE INCLUDING CONSTRUCTION

Rolling Service Doors

ROLLING SERVICE DOORS.GENERAL NOTES TO SPECIFIER.THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST DESIGN PROFESSIONALS IN THE PREPARATION OF PROJECT OR OFFICE MASTER SPECIFICATIONS. IT FOLLOWS GUIDELINES ESTABLISHED BY THE CONSTRUCTION SPECIFICATIONS

Guide Specification s2

GUIDE SPECIFICATION.DECK REHABILITATION SYSTEM.SECTION 7 - MOISTURE CONTROL.Provide LM-85 self leveling, two component pourable asphalt modified urethane base coat and 650 sheet membrane waterproofing as indicated and as specified, complete; including principal items