Hufcor GF1 Low Profile Framed Acoustical Omni-Directional Glasswall M3005 D17/10.Section 102229 GF1 Low Profile Framed Acoustical Omni-Directional Glasswall.1. Furnish and install operable glass partitions and suspension system. Provide all labor, materials
ARCHITECTURAL GUIDE SPECIFICATION.M asterFormat Section 096700 Fluid-Applied Flooring.KEY LUSTER METALLIC.HIGH-BUILD DECORATIVE EPOXY/URETHANE COATING SYSTEM.Furnish all necessary materials, labor and equipment required to prepare substrate and install Key Luster Metallic Coating System
Glass Fiber Reinforced Concrete GFRC Column Cover.Installation Instructions.1. Remove all material from crate(s) and stage marked column sets at locations to be installed. Verify all material has been received in good condition, and notify freight company
Construction Management as Agent Services.Request for Proposal.Proposal Title: Construction Management as Agent.Mailing Address: 1515 11th Street.International Falls, MN 56649.Contact Information: Tom Holt.RFP Due Date: 12-21-17 no later than 3:00 pm.Interviews: If needed 1-3-18
Additional Issues for consideration
STATE LICENSING BOARD FOR CONTRACTORS.RESIDENTIAL BUILDING COMMITTEE MEETING MINUTES.The regular monthly meeting of the Residential Building Committee was called to order at 9:32 a.m. in the Conference Room of the Board s office, Baton Rouge, Louisiana.Members of the Committee present
American Embassy Manama Maintenance Contract for.SBA30016Q0009 HVAC System.AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012).PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212.TABLE OF CONTENTS.Section 1 - The Schedule
U.S. PICP Guide Specification.PERMEABLE INTERLOCKING CONCRETE PAVEMENT.Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete pavers on a permeable, open-graded crushed stone bedding layer (typically
Packaged, Outdoor, Central-Station Air-Handling Units.LANL MASTER SPECIFICATION.When editing to suit project, author shall add job-specific requirements and delete only those portions that in no way apply to the activity (e.g., a component that does not
ANNUAL ACCESSIBILITY AUDIT FOR UNITED METHODIST CHURCHES ( 2533.6)
Shandong Power Sector Flue Gas Desulphurization (FGD) Project.SHANDONG POWER SECTOR.FLUE GAS DESULPHURIZATION (FGD) PROJECT.Environmental Management Plan.Shandong Huangtai Power Plant.Table of Content.1. Project Introduction 2.2. Project Description 3.3. Environmental Management (Mitigation) Plan 6
Electric House Project
1.1 GENERAL REQUIREMENTS.1 Conform to requirements of General Conditions and Division 1.1 Provide all labour, materials and necessary equipment to supply and install the Durex ICF Coating System where shown on the Architectural drawings and as specified.1.3 RELATED WORK SPECIFIED ELSEWHERE
TENDER INVITING NOTICE.The Manufacturers/ their Authorized dealers Date : 28.03.2013.Sub : Supply of Electrical Light fittings with Lamps for our Proposed Badlapur Branch of Allahabad Bank; At- Ground floor, House No-309, Gurukrupa Sadan,Belavali
SMARTCODE ARTICLE 1. general to all plans.ARTICLE 1. general to all plans 1.1 authority.1.5 WARRANTS AND VARIANCES.ARTICLE 2. Reserved 2.1 instructions.ARTICLE 3. NEW COMMUNITY SCALE PLANS 3.1 instructions.3.2 SEQUENCE OF COMMUNITY DESIGN.3.3 Community Unit TYPES.3.4 TRANSECT ZONES
Department of State Growth.SECTION671 CONCRETE AND COMBINED CONCRETE AND STEEL BRIDGE BARRIERS.This section cross-references Sections 175, 610, 611, 630, 631 and 675.If any of the above sections are relevant, they should be included in the specification