Shandong Power Sector Flue Gas Desulphurization (FGD) Project

SHANDONG POWER SECTOR

FLUE GAS DESULPHURIZATION (FGD) PROJECT

Environmental Management Plan

Shandong Huangtai Power Plant

October 2006


Table of Content

1. Project Introduction 2

2. Project Description 3

3. Environmental Management (Mitigation) Plan 6

4. Environmental Monitoring Plan (Construction Phase) 9

5. Institutional strengthening 11

6. Public Participation 12

1. Project Introduction

Huangtai Thermal Power Plant (hereafter referred to as “HTTPP”) which is located in the joint area of Ji'nan development zone and industrial belt in the east, is established in Sep, 1958, it’s the first high-temperature and high-voltage coal-fired power plant in Shandong Province and now is one of the most important power plants of power grid in Shandong. At present, there’re seven boilers and eight steam turbine generator units with total installation of 1005 MW (3×25MW+1×50MW+2×110MW+2×330MW) and annual power generation can reach to 5~6 billion Kwh. From 1992, HTTPP commenced to retrofit 1#~6# units to expand the heating capacity to 800 t/h (120T/h +3×80T/h +2×220T/h), therefore HTTPP became the biggest heating supplier and responsible for the residential heating in the east of Jinan. The retrofitting program of 7# and 8# units with wet limestone-gypsum flue gas desulphurization (FGD) technology from 2002 has already finished and put into operation, the SO2 removal efficiency can reach to 95%, which contributed to improve the air quality in Jinan.

It is forecasted that the heating demand in the east area will reach to 2,080t/h by 2010. However, the 1#~6# units for residential heating supply are installed in 1960~1980, the equipments are beyond or close to their service life and without any FGD facilities. According to the general plan of Jinan municipal development, Shandong LUNENG Development Group decided to launch Retrofitting Program of Heating Facilities in HTTPP, including replacing the former 1#~6# units with two new 400 TPH/300 MW co-generation units. And the FGD facilities will be installed to reduce the air pollution as well.

2. Project Description

l  Project investment and location

The proposed project will install 2X300MW units to replace the current 1#~6# units, the annual consumption of 1.474 million tons coal for the new units will be supplied by Yanzhou Coal Co., Ltd. and accordingly discharge 12,520 tons SO2 annually (0.85 per cent sulfur combustion). The FGD facilities must be installed according to relative laws and regulations.

The FGD technology selected for the project is wet limestone-gypsum technology. The total population of Jinan City is about 5 million. There are no cultural relics around the projection location, and no more land acquisition is need. The water supply for the project is from in-plant circulating water and industrial water (after municipal class-II wastewater treatment) of total 85t/h. The coal type is Yanzhou soft coal. (Qnet, ar: 21890 kJ/kg, Sar: 0.51%, Vdaf: 39.30). The total investment of this FGD project is 237.465 million RMB, including 17.5 million US Dollar World Bank loan (equivalent to 14.525 million RMB), the project-launching fund is contributed by Shandong LUNENG Development Co., Ltd and Shandong LUNENG HUANGTAI Industry Group.

l  Social and natural conditions

The project location lies on XIAOQINGHE River alluvial plain, 5km away in the southern direction of the location are some hills belonging to Mountain Tai system. The surface water system is of XIAOQINGHE River Basin.

The area is in warm temperature semi-humid climate zone. The average temperature is 13.5 oC during a year, the max value is in July and the minimum is in Jan. The southwester in spring and northeaster in autumn is the dominant wind tendency and always changes seasonably.

Jinan is Shandong provincial capital, the center of politics, economy, education, science and culture. Jinan is also a world famous historical city and honored as “Springs City”. The total area is 8,227 Km2, and the population is 5.56 million. Jinan covers about 1.3 million km2 and the population is about 1.8 million.

l  Project analysis

The project is proposed to be constructed in the current plant, thus land acquisition is unnecessary.

HTTPP has always made efforts on environmental protection and from 2002 to 2004; the international FGD demonstration project with obvious social benefit implemented in HTTPP and some lessons and experience is learned as well.

Compared with all the FGD technologies and considering the actual situation, wet limestone-gypsum technology is finally chosen for this project. This technology is the most mature and widely used desulphurization technology by now; the removal efficiency can reach above 95%. It takes the cheap limestone or lime as absorbent and consists of absorbent processing system, flue gas system, absorbing tower and gypsum dewatering system etc., the final product is gypsum. This technology also has advantages on high removal efficiency, simple operation, cheap sorbent and so on.

Water consumption of this desulphurization system is 85t/h, which comes from circulating water (60t/h) and industrial water (25t/h). The by-product of this technology is CaSO4.2H2O, which can be used for construction materials and cement retarder. HTTPP has signed gypsum supply agreements with clients to reuse this by-product as avoiding secondary pollution.

l  Environmental protection objects

The environmental protection objects around the project location are listed as follows:

(1)  There’s no natural protection area and historical relics near HTTPP.

(2)  Surface water: Xiaoqing River and Dasha River

(3)  Underground water: underground water source near the project location and dust heap around Li-jia-cun Village.

(4)  Noise: residential area around the power plant

l  Environmental Impact Assessment

The EIA was approved by SEPA in July 2005. It included the FGD as part of the project. Consultation for the EIA was conducted in September 2004 and it was sent to Jinan Municipal EPB for disclosure at that time.

3. Environmental Management (Mitigation) Plan

Phase / Item / Issue / Mitigating measures / Cost / Responsibility / Start Date / End Date /
Construction / Air / The impacts on air are from dust emission caused by earth digging, piling up and carrying. / Dedicated area on the plant site for storing materials and wastes. That will be sprayed with water, or shielded to minimize the adverse impact. Wastes will ultimately be taken to an SPEPB approved dump site in Jinan / Minor / Contractor / When construction starts / When construction ends
Water / Domestic water is minor waste source. Workers are all local and commute to the construction site / The domestic water will be led to the existing secondary treatment plant operating at the existing power station instead of discharging directly. The treated water will be used for spraying to avoid dust emission. Thus, the wastewater impact is small. / Minor / Contractor / When construction starts / When construction ends
Construction / Waste solid / Construction waste of demolishing current building in project location (for heating project is 96,250 m3, including 3000 m3 for FGD project) The waste is non-hazardous construction material (bricks, plaster, etc) / The solid waste will be transported to Jijia solid waste use treatment yard in Jinan to be used for filling the bottomland. / Minor / Contractor / When construction starts / When construction ends
Noise / The noises from grab, bulldozer, road-roller, blender and crane etc. the noise level is 75 dB (A). / There’s no sensitive site and village within 500m around, so the noise should not disturb the residents. The construction work will only be performed in the daytime between the hours of 8:00 A.M. to 6:00 P.M. / Minor / Contractor / When construction starts / When construction ends
Operation / Air / Limestone powders when crushing / Limestone powder: less than 50mg/Nm3 after bag dust filter. / 100,000 RMB per year / HTTPP
Production Department / When operation starts / Ongoing
Water / 1. Wastewater from gypsum dewatering process
2. Wastewater of washing FGD equipment when shut-down / 1. The wastewater will be treated in a new 10 TPH chemical treatment plant (pH adjust, limestone addition, settling etc.) and reused for spraying after treatment.
2. The wastewater after washing will be collected in drainage and delivered to absorption tower by pumps. / 110,000 RMB per year / HTTPP
Operation Department / When operation starts / Ongoing
Solid waste / The SO2 and CaCO3 in flue gas will combined to CaSO4·2H2O through chemical changes. The purity of the gypsum (CaSO4·2H2O) >90%, fineness: 30~60um; Water content <10%. The amount is 3.4×104T/a (depends on the coal in the design) / Agreement has been reached with Shandong LUNENG Huangtai Industry Group to sell the gypsum to Shandong TAIHE Dongxin Co., Ltd and Tai’an XINHUA Gypsum Processing Co., Ltd to produce gypsum board of 150 million m2 and 12 million m2. In order to avoid secondary pollution, close packaging is necessary. / Minor / HTTPP
Shandong Huangtai Industry Group / When operation starts / Ongoing
Noise / Noise level standards for workers from the operation of blender, circulating pump and blower etc. level is ≤85 dB (A) and from the ball mill is 90 dB (A). / Choosing the equipments to meet the standards and carrying out preventive measures:
1. Straight flow design of the flue pipe and sound insulated support structure to reduce noise;
2. Planting shrubbery and arbor around the plant for sound absorption.
The measures above could eliminate the noise level by 15~20dB (A). / Minor / HTTPP
Production Department / When operation starts / Ongoing

1

Shandong Huangtai Power Plant

Shandong Power Sector Flue Gas Desulphurization (FGD) Project

4. Environmental Monitoring Plan (Construction Phase)

Phase / Parameter / Site / Method and equipment type / Frequency / Monitoring cost/
Equipment cost / Responsibility / Start Date / End Date /
Construction / Dust / Construction site / Visual / Daily / Minor / HTTPP
Civil Works Department / When construction starts / When construction ends
Wastewater / No monitoring wastewater is discharged to a central treatment plant
Waste solid / Construction disposal site
Jijia Municipal disposal site / Visual (proper collection)
Visual (proper disposal) / Weekly / Minor / HTTPP
Civil Works Department / When construction starts / When construction ends
Noise (equivalent continuous class-A) / Construction site / Noise meter / Quarterly or if there are complaints / Minor / HTTPP
Civil Works Department / When construction starts / When construction ends


Environmental Monitoring Plan (Operation Phase)

Phase / Parameter / Site / Method and equipment type / Frequency / Monitoring cost/
Equipment cost / Responsibility / Start Date / End Date /
Operation / Limestone powder / Limestone crushing area / On-line TV camera / Continuous / 8000RMB/time / HTTPP
Operations Department / When operation starts / Ongoing
Wastewater
(PH, SS, Cl-, heavy metal, fluoride) / Wastewater discharge outlet / PH meter, atomic absorption spectrophotometer, gravimetric / Quarterly, heavy metal annually / Minor / HTTPP
Operations Department / When operation starts / Ongoing
Waste solid / No monitoring is needed material is sold
Noise
(Equivalent continuous class-A) / 1m from fence line / Noise meter / Quarterly or when there are complaints / Minor / HTTPP
Operations Department / When operation starts / Ongoing

1

Shandong Huangtai Power Plant

Shandong Power Sector Flue Gas Desulphurization (FGD) Project

5. Institutional Arrangements

Monitoring

As indicated in the Monitoring Plan, the HTTPP Civil Works Department will be responsible for environmental monitoring during construction and the Operations Department during operations

Analysis

HTTPP Production Department will be responsible for analyzing environmental monitoring data during both construction and operating phases

Reporting and Recommendations

The specialized environmental staff in the HTTPP Production Department will prepare a monthly summary table of environmental results and any recommended actions

Decision Making

The HTTPP Vice General Manager receives these reports and is the authority to implement any recommendations

6. Public Participation

6.1 Method: Media date

In order to propagandize the FGD project, find out the public’s requirements on economic development and environmental protection and make the decisions more scientifically, HTTPP invited some representatives from Jinan government eastern office, plants and schools etc. to sit together to discuss some social issues on Apr.20, 2005.

Director Liu Zhenfang from HTTPP gave a brief introduction of the project at the beginning and then replied some questions; each attendant resident fills a questionnaire.

6.2 The following table shows the detailed information of attended residents.

1

Shandong Huangtai Power Plant

Shandong Power Sector Flue Gas Desulphurization (FGD) Project

Item / Number / Effective rate(%)
Age / Under 18 / 5 / 3
19~35 / 95 / 65
36~55 / 46 / 32
Education / Primary school / 7 / 5
Junior school / 58 / 40
Secondary school / 81 / 55
Occupation / Peasant / 19 / 13
Worker / 81 / 55
Teacher / 9 / 6
Official / 20 / 14
Student / 5 / 4
Others / 12 / 8
Title / None / 62 / 42
Junior / 55 / 38
Medium or above / 29 / 20
Address / In-plant/downtown / 126 / 86
Country / 20 / 14

1

Shandong Huangtai Power Plant

Shandong Power Sector Flue Gas Desulphurization (FGD) Project

6.3  Survey results

The survey analysis shows that the view on each issue is consistent. The public are active to participate and all of them have some knowledge on environmental impacts of this project. The following table shows the details:

View collection

Questions / Option / Number / Percentage (%)
1.Do you know about this project before this survey? / A. Yes / 142 / 97
B. No / 4 / 3
2.How do you think about the ambient air quality in Jinan? / A. Heavy / 2 / 1
B. Slight / 7 / 5
C. Medium / 30 / 21
D. Good / 107 / 73
3.How do you think about the water pollution of the rivers nearby Jinan? / A. Heavy / 10 / 7
B. Slight / 50 / 34
C. Medium / 82 / 56
D. Good / 4 / 3
4.Do you think this project will promote the local economic development? / A. Yes / 141 / 97
B. No / 0 / 0
C. No comments / 5 / 3
5.Do you think the wastewater will have adverse impact on ambient environment? / A. Yes / 4 / 3
B. No / 138 / 95
C. No comments / 4 / 2
6.Do you think the noise in the construction stage and operation stage will cause adverse impact on local residents? / A. Yes / 12 / 8
B. No / 129 / 88
C. No comments / 5 / 4
7.The SO2 discharging will be reduced by 66%, which is only 22% of the target set by environment department. Do you think this project will improve the air quality obviously? / A. Yes / 137 / 94
B. No / 3 / 2
C. No comments / 6 / 4
8.Depends on all the environment effects would be appeared, do you think it is necessary to start this project? / A. Necessary / 141 / 97
B. Unnecessary / 1 / 1
C. No comments / 4 / 2