Use on Bridges Where Stray Current Provisions Are According to Bridge Design Details 12-10.1

Use on Bridges Where Stray Current Provisions Are According to Bridge Design Details 12-10.1

Use on bridges where stray current provisions are according to Bridge Design Details 12-10.1 thru 12-10.20. 1. Edit to include only the provisions for stray current details shown on the plans. 10 1.__ STRAY CURRENT PROTECTION.

Thin Natural Stone Veneers

Thin Natural Stone Veneers

THIN NATURAL STONE VENEERS. Display hidden notes to specifier. (Don't know how? Click Here). Copyright 2014 - 2018 ARCAT, Inc. - All rights reserved. NOTE TO SPECIFIER County Materials Corporation; thin natural stone veneers, stacked natural stone veneer.

Title Here ( Urban Planning, Collaborative Activity

Title Here ( Urban Planning, Collaborative Activity

Analyzing Collaborative Activity Representing field research for understanding collaboration, CSCW 2002 Workshop Position Paper. Supporting Informed Debate of Urban Planning Alternatives. A.J. Brush, University of Washington, Seattle, USA. Alan Borning, University of Washington, Seattle, USA.

Allen G. Robberson Jr

Allen G. Robberson Jr

Allen G. Robberson Jr. Fort Mohave, AZ 86426. Dear Employer. In response to your advertisement regarding the ______position in your organization I am enclosing a resume for your review. Please consider this letter as my formal application presenting my background, education and experience.

PROJECT:JJL Roof Replacement and Waterproofing Project

PROJECT:JJL Roof Replacement and Waterproofing Project

PROJECT:JJL Roof Replacement and Waterproofing Project. OWNER:The University of Texas Health Science Center at Houston. TO:Prospective Proposers. This Addendum forms part of and modifies Proposal Documents dated, January 30, 2017, with amendments and additions noted below.

All Ultrex Direct Glaze Polygon Window

All Ultrex Direct Glaze Polygon Window

1.1 Section Includes. A. All Ultrex Direct Glaze Polygon window complete with glazing, grilles-between-the-glass, jamb extension, sheet rock return, j-channel, and standard or specified anchors, trim and attachments. 1.2 Related Sections.

Easi-Cast Building

Easi-Cast Building

Easi-Cast Building. 10 x 12 and 12 x 14 , Pre-Assembled. Contractor to furnish a precast concrete transportable building. Building to be delivered and placed on owner s prepared crushed stone foundation in accordance with manufacturer s recommendations.

Section 07 12 00, Built-Up Bituminous Waterproofing

Section 07 12 00, Built-Up Bituminous Waterproofing

SECTION 07 12 00 BUILT-UP BITUMINOUS WATERPROOFING. SPEC WRITER NOTE: Delete any item or paragraph not applicable in the section and renumber the paragraphs. This section specifies impervious built-up membranes of bituminous materials used for waterproofing.

Section 155. SCHEDULES for CONSTRUCTION

Section 155. SCHEDULES for CONSTRUCTION

Section 155. SCHEDULES FOR CONSTRUCTION. CPM Schedule with preliminary work plan. CPM Schedule without preliminary work plan. Delete this Section and substitute the following. 155.01 This work consists of scheduling, monitoring, and reporting all construction.

Section: 13 4713 Ul 752 Level 1 Bullet-Resistant Fiberglass Panels

Section: 13 4713 Ul 752 Level 1 Bullet-Resistant Fiberglass Panels

SECTION: 13 4713 UL 752 LEVEL 1 BULLET-RESISTANT FIBERGLASS PANELS. A.Drawings and general provisions of the Contract, including General and Supplementary Conditions. A.Underwriters Laboratories.

007100S01 - Program Design Criteria

007100S01 - Program Design Criteria

007100S01 - PROGRAM DESIGN CRITERIA. PROGRAM DESIGN. Heating Systems: Utilize the campus central system, where available. Cooling Systems: Utilize the campus central chilled water system, where available. Avoid the use of face and by pass coils in air handling units.

Hexayurt Limited Field Test Results

Hexayurt Limited Field Test Results

HEXAYURT LIMITED FIELD TEST RESULTS. SUMMARY REPORT. Progressive Building Solutions, Inc. Executive Summary. Progressive Building Solutions, Inc. (PBS) performed a short duration field test of a stretch Hexayurt design on a remote dry lake bed in Nevada.

Section 04902 Clay Masonry Restoration

Section 04902 Clay Masonry Restoration

SAMPLE SPECIFICATION. SECTION 04902 CLAY MASONRY RESTORATION. 1.1 SUMMARY OF WORK. A. Extent of masonry restoration work is as shown on the Drawings and as specified herein. 1. The drawings endeavor to show the extent of masonry restoration work required. The.

LTD Zheshartskiy LPK

LTD Zheshartskiy LPK

LTD Zheshartskiy LPK. APPROVED: CONFIRMED. General Director ofGeneral Director of. LTD TD UPG LTD Zheshartskiy LPK. Film faced plywood. Technical requirements. Effective date 2014. APPROVED:DEVELOPED. Lamination line ChiefStandardization engineer. Technical Control Chief. 1. Scope of application.

Building Trades Advisory Meeting Minutes

Building Trades Advisory Meeting Minutes

Building Trades Advisory Meeting Minutes. Business & Industry Members Present. Industry Guests Present. District and School-Based Support Staff. Meeting Notes/Minutes. Welcome and Introductions.

Project Number Wood Paneling

Project Number Wood Paneling

PROJECT NUMBER WOOD PANELING. Wood Paneling. This guide spec is intended to be used with Architectural Woodwork Standards the quality standard published by the Architectural Woodwork Manufacturers Association of Canada, the Woodwork Institute and the Architectural Woodwork Institute.