The Toolbox by Minto Spatial Solutions

The Toolbox by Minto Spatial Solutions. Version: Core Spatial Technology 4.2.0 (SWAF). Copyright Information. Copyright 2004-2011 Minto Spatial Solutions Ltd. All rights reserved. Trademarks and Registered Trademarks. Smallworld is a registered trademark of General Electric Company.

Post-Construction Project Worksheet

Post-Construction Project Worksheet. Post-Construction Worksheet. Project Summary Sheet. Project Owner Information. Project Information. Project Summary SheetRequired for All ProjectsPage A-1. Post-Construction Worksheet for the. Small Project Submittal Sheet. Project Information.

Invisacoustics Build a Spec

Invisacoustics Build a Spec

SECTION 09 50 00 Acoustical Ceilings. 1.1 RELATED DOCUMENTS. Drawings and general conditions of Contract, including General and Supplementary Conditions and Divisions-1 Specification sections apply to work of this section. A. Section Includes. 1. Acoustical ceiling panels. B. Related Sections.

Edition: August 2008Specification: Part S17 Continuous Flight Auger Piles

Edition: August 2008Specification: Part S17 Continuous Flight Auger Piles

Edition: August 2008Specification: Part S17 Continuous Flight Auger Piles. CONTINUOUS FLIGHT AUGER PILES. Quality Requirements. Pile Construction. Testing of Piles. This Part specifies the requirements for the installation of continuous flight auger (.

25064 Perform Basic Residential Carpentry Maintenance Under Supervision

25064 Perform Basic Residential Carpentry Maintenance Under Supervision

Perform basic residential carpentry maintenance under supervision. PurposePeople credited with this unit standard are able to: prepare to perform basic carpentry maintenance for a residential dwelling; perform basic carpentry maintenance for a residential.

Foundations Worksheet Answers

Foundations Worksheet Answers

Foundations Worksheet Answers. Foundation 1: Holding on to the dowel end, place the block of wood directly on top of the soil. Then, pile books on it to create bearing pressure on the soil, as if this foundation was holding the load from part of a heavy.

Hydraulically Driven Steel Underpinning Piles Specifications

Hydraulically Driven Steel Underpinning Piles Specifications

31 66 00 HELICAL PILE/ANCHOR DEEP FOUNDATIONS. THIS SECTION INCLUDES STEEL H-PILES. The work shall consist of the Helical Pile Contractor furnishing all labor, tools, equipment, materials and supervision to install Helical Piles according to the specifications.

Early Warning of Condensation Danger

Early Warning of Condensation Danger

Early Warning of Condensation Danger. The EE046 condensation monitor indicates condensation danger before condensation actually occurs. It is ideal for monitoring chilled beams and other surfaces operated close to the dew point.

Model SMOKE FIRE-TITE IMB

Model SMOKE FIRE-TITE IMB

SPECIFICATIONS SECTION 08330. Model SMOKE FIRE-TITE IMB. Insulated Slats. Fire-Tite Rolling Doors. NOTE: For specifications, architects must choose from a variety of options. The standard choice will be shown first in plain text followed by the options.

Sherburne Soil and Water

Sherburne Soil and Water

Sherburne Soil and Water. Conservation District. Adopted by the Sherburne SWCD Board on January 12, 2015. Adopted by the Sherburne SWCD Board on January 12, 2015.

Limited Scope Sign Structure Checklist

Limited Scope Sign Structure Checklist

Concept Development Checklist. Sign Structure Replacement Project. All item checked Y or N shall be briefly discussed in the Comments section below the checklist items. NFI: Needs Further I nvestigation in Final Design (explain below). Concept Development Checklist. Structural Scope Of Work.

Energy-Efficient Heating, Ventilating and Air Conditioning

Energy-Efficient Heating, Ventilating and Air Conditioning

Energy-Efficient Heating, Ventilating and Air Conditioning. FOR ALL RELEVANT PROBLEMS USE TMY3 DATA NOT TMY2 DATA. TMY3 DATA IS EASIER TO DOWNLOAD BECAUSE IT DOES NOT NEED TO BE UNZIPPED. JUST READ IT DIRECTLY INTO WEATRAN.

Vrpm-Questionnaire for Cement Mill

Vrpm-Questionnaire for Cement Mill

VRPM-QUESTIONNAIRE FOR CEMENT MILL. BASIC QUESTIONNAIRE FOR FEASIBILITY OF PRE-GRINDING OF CEMENT MILL. HNGIL GROUP COMPANIES. AMCL MACHINERY LTD., PLOT NO. A-1/1, MIDC INDUSTRIAL AREA. BUTIBORI, DIST-NAGPUR- 441122. PROJECT NAME : CEMENT MILL No. a) Altitude of Plant size.

York Ref SA Letter Head

York Ref SA Letter Head

GUIDELINES FOR CENTRIFUGAL CHILLERS. NON OPERATIONAL USAGE. Colin Hewetson. In particular project circumstances, Centrifugal chillers may be delivered & or installed on site prior to the completion of associated civil, mechanical & electrical works. In.

Electrical Construction & Appliances

Electrical Construction & Appliances

P-4/1, Oil Installation Road. Paharpur, Kolkata-700088. TENDER NO:1110LE0033 DATE: 15.03.2016. Sub: AMC OF ELECTRICAL JOB AT INDUSTRIAL PACKAGING KOLKATA. Sealed offers are invited super scribing the tender no on the top of the envelope for the AMC of electrical job as per details mentioned below.

Principal Inspection Report

Principal Inspection Report

Principal Inspection Report. Ashted Tunnel Functional Location: WZ-001-019. Birmingham & Fazeley Canal (Digbeth Branch). Inspection date: 18th October 2006. Executive Summary. Ashted Tunnel is a 102m long, brick lined, one way working tunnel with one.