Ronadeck Resin Bound Surfacing Fit for a Queen

RonaDeck Resin Bound Surfacing an elegant solution.Ronacrete s RonaDeck Resin Bound Surfacing played a key part in the landscaping of a high quality home designed and built by Elegant Homes of Solihull

Los Angeles Southwest College s6

Construction Controls Group.Los Angeles Southwest College Proposition A/AA Bond Fund Projects.Six Pack Meeting Agenda March 1, 2007.1. Campus Project List and Status.2. Design-Build Project DSA Submittal Schedule.3. Campus Projects Project Status & Schedule.4. Campus Projects Financial Updates

JS Air Curtains Windbox s2

JS Air Curtains Invisair.Air Curtain Specification Summary.1. The Air Curtain shall have a self-supporting casing made of galvanized plated steel. The outlet grille will be finished in structural epoxy-polyester RAL 9016 as standard. Other RAL colours shall be available on request

Shown on the Planning Scheme Map As CDZ2

Yarra Planning Scheme.SCHEDULE 2 TO THE COMPREHENSIVE DEVELOPMENT ZONE.Shown on the planning scheme map as CDZ2.CREMORNE, BALMAIN, DOVER STREETS PROJECT, RICHMOND.This clause applies to land bounded by Cremorne, Bent, Dover and Balmain Streets, Richmond

Pro-Spec, Inc s26

5 Innwood Circle, Suite 106.Little Rock, AR 72211.Confidential Document.CURRENT GUARDIAN AND MCGUIRE PRICING VALID.ALL PRICES LIST UNLESS NOTED .CALL FOR DISCOUNTS.QUOTE VALID FOR 6 MONTHS FROM QUOTE DATE (quote # above).ALL PRODUCTS SUBJECT TO ENGINEER APPROVAL

Handout 2 Project Information Form s6

Tahoe Sierra IRWM.Project Template.Please provide information in the tables below.I. Project Proponent Information.II. General Project Information.III. Plan Objectives Addressed.For each of the objectives addressed by the project, provide a one to two

Section 07 21 13 Foam Board Insulation s1

PROJECT ARCHITECT RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment. This guide is to aid in the creation of

Nunthorpe Hall Farm and Blacksmith S Yard Development Guidance: Consultation Update

Nunthorpe Hall Farm and Blacksmith S Yard Development Guidance: Consultation Update

MIDDLESBROUGH COUNCIL.Nunthorpe Hall Farm and Blacksmith s Yard Development Guidance: Consultation update.Executive Member for Regeneration Councillor Charles Rooney.Executive Director of Economic Development and Communities Kevin Parkes.PURPOSE OF THE REPORT

Series 45 Hot Water Boiler Sample Specifications (8.5-813 HP, 30 & 60 Psig)

Firetube Boiler Series 45, Firebox.Series 45 Hot Water Boiler Sample Specifications (8.5-813 HP, 30 & 60 psig).1.0 Boiler Characteristics.1.1 The boiler shall have a maximum output of Btu/hr, or horsepower when fired with oil and/or natural gas. Electrical power available shall be Volt Phase Cycle

Fast-Track Tree Removal Or Pruning Accessible Word Version

Application for planning permit - fast-track tree removal or pruning.Applicable fee: $440.When this form can be used.Address of land where trees located.Formal land description, also insert details for either A or B from copy of title

Operation and Maintenance s1

OPERATION AND MAINTENANCE.Trails and walkways.Inspections and maintenance are required to achieve the intended function, benefits, and life of the practice. The landowner/operator is responsible to establish and implement an inspection and maintenance

Multi-Output MOD-4

CSI SPECIFICATION: HWRQ PLATINUM.SECTION: 230913 Instrumentation and Control devices for HVAC.A. Section Includes.1. Multiple Multi-Stage Boiler Outdoor Reset Modular Hydronic Heating Control.B. Related Sections

The Technique of Planning and Pre-Construction Road Work s1

Highway Engineering C3010 / UNIT3.THE TECHNIQUE OF PLANNING AND PRE-CONSTRUCTION ROAD WORK.General Objective.To understand the earth work operation and its problems occurred.Specific Objectives.At the end of the unit you should be able to.describe the earth work operation

STORED EMERGENCY POWER SUPPLY System

STORED EMERGENCY POWER SUPPLY System.LANL MASTER SPECIFICATION.Available online at.This template must be edited for each project. In doing so, specifier must add job-specific requirements. Brackets are used in the text to indicate designer choices or

For DOT/Federal Projects

For DOT/Federal Projects.Cover Title Page without Plans.Title Page without Plans.TABLE OF CONTENTS.Notice To Bidders.Instructions for Contractor s Licensing.Notice of Requirement for Affirmative Action to Ensure.Equal Employment Opportunity (Executive Order 11246)

Pro-Spec, Inc s24

5 Innwood Circle, Suite 106.Little Rock, AR 72211.Confidential Document.CURRENT MCGUIRE PRICING VALID.ALL PRICES LIST UNLESS NOTED .CALL FOR DISCOUNTS.QUOTE VALID FOR 6 MONTHS FROM QUOTE DATE (quote # above).ALL PRODUCTS SUBJECT TO ENGINEER APPROVAL