Tech Guide - Section IV
October 12, 2011

Index - Page 1

PRACTICE NAME AND UNIT / RESP
DISCIP / DATE / CODE / LIFESPAN
Access Control (Ac) / For / 12/08 / 472 / 10
Access Road (Ft) / Eng / 1/04 / 560 / 10
Agrichemical Handling Facility (Ea) / Eng / 2/10 / 309 / 15
Amendments for Treatment of Agricultural Waste (AU) / Eng / 7/05 / 591 / 1
Anaerobic Digester – Ambient Temperature (Ea) / Eng / 5/05 / 365 / 25
Anaerobic Digester – Controlled Temperature (Ea) / Eng / 5/05 / 366 / 25
Animal Mortality Facility (Ea) / Eng / 1/05 / 316 / 15
Animal Trails and Walkways (Ft) / Eng / 4/03 / 575 / 10
Anionic Polyacrylamide (PAM) Erosion Control (Ac) / Eng / 10/01 / 450 / 1
Aquaculture Ponds (Ac) / Eng / 8/10 / 397 / 10
Bedding (Ac) / Eng / 5/03 / 310 / 3
Brush Management (Ac) / ECS / 8/10 / 314 / 10
Channel Stabilization (Ft) / Eng / 10/03 / 584 / 10
Clearing and Snagging (Ft) / Eng / 10/03 / 326 / 5
Closure of Waste Impoundments (No) / Eng / 11/05 / 360 / 15
Composting Facility (Ea) / Eng / 7/05 / 317 / 15
Conservation Cover (Ac) / Agron / 7/06 / 327 / 5
Conservation Crop Rotation (Ac) / Agron / 2/01 / 328 / 1
Constructed Wetland (Ac) / Eng / 6/02 / 656 / 15
Contour Buffer Strips (Ac) / Agron / 2/01 / 332 / 5
Contour Farming (Ac) / Agron / 2/01 / 330 / 5
Contour Orchard & Other Fruit Area (Ac) / Agron / 9/04 / 331 / 10
Cover Crop (Ac) / Agron / 9/04 / 340 / 1
Critical Area Planting (Ac) / Agron / 8/11 / 342 / 10
Dam (No) / Eng / 6/04 / 402 / 15
Dam, Diversion (No) / Eng / 1/03 / 348 / 15
Deep Tillage (Ac) / Agron / 9/04 / 324 / 1
Dike (Ft) / Eng / 7/05 / 356 / 20
Diversion (Ft) / Eng / 1/03 / 362 / 10
Drainage Water Management (Ac) / Eng / 6/04 / 554 / 1
Dry Hydrant (Ea) / Eng / 8/99 / 432 / 15
Early Successional Habitat Development/Management (Ac) / Bio / 11/08 / 647 / 1
Fence (Ft) / ECS-Graz Land Sp. / 12/08 / 382 / 20
Field Border (Ac.) / Agron / 2/09 / 386 / 10
Filter Strip (Ac.) / Agron / 7/06 / 393 / 10
Firebreak (Ft.) / For / 8/11 / 394 / 5
Fish Raceways or Tank [Ft.(M.)] / Eng / 6/02 / 398 / 10
Fishpond Management (No.) / Bio / 7/06 / 399 / 1
Forage Harvest Management (Ac.) / Agron / 9/04 / 511 / 1
Forest Stand Improvement (Ac.) / For / 8/11 / 666 / 10
Forest Trails and Landings (Ac.) / For / 1/10 / 655 / 5
Fuel Break (Ac.) / For / 2/06 / 383 / 10
Grade Stabilization Structure (No.) / Eng / 9/89 / 410 / 15
Grassed Waterway (Ac.) / Agron/Eng / 2/05 / 412 / 10
Heavy Use Area Protection (Ac.) / Eng / 3/09 / 561 / 10
Hedgerow Planting (Ft.) / Bio / 11/08 / 422 / 5
Herbaceous Weed Control (Ac.) / ECS / 8/10 / 315 / 5
Integrated Pest Management (Ac.) / Agron / 8/11 / 595 / 1
Irrigation Canal or Lateral (Ft.) / Eng / 5/03 / 320 / 15
Irrigation Ditch Lining (Ft.) / Eng / 01/11 / 428 / 20
Irrigation Field Ditch (Ft.) / Eng / 5/03 / 388 / 15
Irrigation Land Leveling (Ac.) / Eng / 1/03 / 464 / 15
Irrigation Pipeline (Ft) / Eng / 9/10 / 430 / 20
Irrigation Reservoir (No. & Ac. Ft.) / Eng / 01/11 / 436 / 15
Irrigation System - Microirrigation (No.&Ac.) / Eng / 10/07 / 441 / 15
Irrigation System - Sprinkler (No.&Ac.) / Eng / 6/04 / 442 / 15
Irrigation System - Surface & Subsurface (No.&Ac.) / Eng / 5/03 / 443 / 15
Irrigation System, Tailwater Recovery (No.) / Eng / 12/07 / 447 / 15
Irrigation Water Management (Ac.) / Eng / 6/06 / 449 / 1
Land Clearing (Ac.) / Eng / 1/04 / 460 / 10
Land Reclamation, Landslide Treatment (No., Ac., Ha) / Eng / 5/05 / 453 / 15
Land Reclamation, Toxic Discharge Control (No.) / Eng / 5/06 / 455 / 15
Land Reconstruction, Abandoned Mined Land (Ac.) / Agron / 9/04 / 543 / 15
Land Reconstruction, Currently Minded Land (Ac.) / Agron / 9/04 / 544 / 15
Land Smoothing (Ac.) / Eng / 1/04 / 466 / 10
Lined Waterway or Outlet (Ft.) / Eng / 6/06 / 468 / 15
Livestock Shade Structure (No.) (INTERIM) / Eng / 1/08 / 717 / 10
Mine Shaft and Adit Closing (No.) / Eng / 5/05 / 457 / 15
Monitoring Well (No.) / Eng / 1/04 / 353 / 15
Mulching (Ac.) / Agron / 9/04 / 484 / 1
Nutrient Management (Ac.) / Agron / 11/02 / 590 / 1
Obstruction Removal (Ac.) / Eng / 1/03 / 500 / 10
Open Channel (Ft.) / Eng / 10/89 / 582 / 15
Pasture and Hay Planting (Ac.) / Agron / 9/04 / 512 / 5
Pipeline (Ft.) / Eng / 10/01 / 516 / 20
Pond (No.) / Eng / 10/11 / 378 / 20
Pond Sealing or Lining - Bentonite Sealant (No.) / Eng / 7/02 / 521C / 15
Pond Sealing or Lining - Compacted Clay Treatment / Eng / 5/05 / 521D / 15
Pond Sealing or Lining - Flexible Membrane (No.) / Eng / 12/06 / 521A / 20
Pond Sealing or Lining - Soil Dispersant (No.) / Eng / 7/02 / 521B / 20
Precision Land Forming (Ac.) / Eng / 4/03 / 462 / 10
Prescribed Burning (Ac.) / For / 12/08 / 338 / 1
Prescribed Grazing (Ac.) / Agron / 12/08 / 528 / 1
Pumping Plant (No.) / Eng / 01/11 / 533 / 15
Recreation Area Improvement (Ac.) / For / 6/02 / 562 / 15
Recreation Land Grading & Shaping (Ac.) / Eng / 10/03 / 566 / 15
Recreation Trail and Walkway (Ft.) / Eng / 1/04 / 568 / 15
Residue Management, Mulch Till (Ac.) / Agron / 2/01 / 345 / 1
Residue Management, No Till/Strip Till (Ac.) / Agron / 2/01 / 329 / 1
Residue Management, Ridge Till (Ac.) / Agron / 9/04 / 346 / 1
Residue Management, Seasonal (Ac.) / Agron / 9/04 / 344 / 1
Restoration & Management of Rare & Declining Habitats (Ac.) / Bio / 7/06 / 643 / 1
Riparian Forest Buffer (Ac.) / For / 11/08 / 391 / 15
Roof Runoff Structure (No.) / Eng / 10/03 / 558 / 15
Row Arrangement (Ac.) / Eng / 4/03 / 557 / 5
Runoff Management System (No. & Ac.) / Eng / 5/79 / 570 / 15
Seasonal High Tunnel System for Crops (INTERIM) / ESC / 11/10 / 798 / 4
Sediment Basin (No.) / Eng / 8/10 / 350 / 20
Shallow Water Development and Management (Ac.) / Bio / 7/06 / 646 / 1
Silvopasture Establishment (Ac.) / For / 12/08 / 381 / 15
Solid/Liquid Waste Separation Facility / Eng / 10/06 / 632 / 15
Spoil Spreading (Ft.) / Eng / 1/04 / 572 / 1
Spring Development (No.) / Eng / 4/10 / 574 / 20
Stream Crossing (No) / Eng / 6/04 / 578 / 10
Stream Habitat Improvement and Management (Ac.) / ESC / 6/02 / 395 / 1
Streambank and Shoreline Protection (Ft.) / Eng / 5/05 / 580 / 20
Stripcropping (Ac.) / Agron / 9/04 / 585 / 5
Structure for Water Control (No.) / Eng / 7/04 / 587 / 20
Subsurface Drain (Ft.) / Eng / 1/04 / 606 / 20
Surface Drainage, Field Ditch (Ft.) / Eng / 6/06 / 607 / 15
Surface Drainage, Main or Lateral (Ft.) / Eng / 6/04 / 608 / 15
Terrace (Ft.) / Eng / 2/04 / 600 / 10
Tree/Shrub Establishment (Ac.) / For / 12/08 / 612 / 15
Tree/Shrub Pruning (Ac.) / For / 11/08 / 660 / 10
Tree/Shrub Site Preparation (Ac.) / For / 12/08 / 490 / 1
Underground Outlet (No.) / Eng / 9/06 / 620 / 20
Upland Wildlife Habitat Management (Ac.) / Bio / 4/09 / 645 / 1
Waste Facility Cover (No.) / Eng / 5/05 / 367 / 10
Waste Field Storage (INTERIM) (Ea.) / Eng / 5/05 / 749 / 10
Waste Storage Facility (No.) / Eng / 4/07 / 313 / 15
Waste Transfer (No.) / Eng / 9/09 / 634 / 15
Waste Treatment (No.) / Eng / 10/06 / 629 / 10
Waste Treatment Lagoon (No.) / Eng / 7/04 / 359 / 15
Waste Utilization (Ac.) / Eng/Agron / 11/05 / 633 / 1
Wastewater Treatment Strip / Eng / 10/06 / 635 / 10
Water and Sediment Control Basin (No.) / Eng / 10/03 / 638 / 10
Water Well (No.) / Eng / 3/09 / 642 / 20
Watering Facility (No.) / Eng / 12/06 / 614 / 20
Well Decommissioning (No.) / Eng / 9/06 / 351 / 20
Well Water Testing (No.) / Eng / 10/06 / 355 / 1
Wetland Creation (Ac.) / Bio / 1/05 / 658 / 15
Wetland Enhancement (Ac.) / Bio / 1/05 / 659 / 15
Wetland Restoration (Ac.) / Bio / 12/08 / 657 / 15
Wetland Wildlife Habitat Management (Ac.) / Bio / 4/09 / 644 / 1
Woody Residue Treatment (Ac.) / For / 8/11 / 384 / 10