SADEEQULLAH, PLANNER / SCHEDULER RESUME

SadeeqUllah Muhammad

B.E (Civil), P.E (Pak), MPEC (Pak)

SPECIALTIES

  • Planning / Scheduling
  • Schedule Development / Management & Control
  • Delay Analysis and EOT Claims
  • Project Recovery Scheduling
  • Level 2, 3, 4 Scheduling

SOFTWARE SKILLS

  • MS Office 2010
  • Oracle Primavera Project Management P6 v8.1
  • Primavera Risk Analysis Software v 8.7
  • Primavera Project Planner P3.1
  • AutoCAD 2012

QUALIFICATION

1998 – 2002B.E (Civil Engineering) N.E.D University of Engineering & Technology, Karachi, Pakistan

1996 – 1998 H.S.C (Pre-Engineering) Islamia College, Peshawar, Pakistan

PROFESSIONAL AFFILIATION

Member Pakistan Engineering Council (MPEC)

: Dubai, United Arab Emirates

:+971-56-368 95 00

:

:

CAREER SUMMARY

"Planning and Scheduling Engineer with an overall 10 years ofbuilding and infrastructureconstruction exposure, specialized in Planning & Scheduling, Project Monitoring & Controlling and Extension of Time claims preparation (Delay Analysis, TIA, FSA using AACEI's Forensic Analysis Protocols), fully conversant in Primavera Suite software (P3.1/P6v7/P6v8.2 and MS Office 2010, with a practical knowledge of the construction techniques and procedures which include Residential / Commercial buildings, Infrastructure / Underground Utilities i.e. Water / Drainage / Sewage Networks, Roads & Landscaping. Technical knowledge of the construction procedures of Micro-tunnelling, Directional Drilling, Deep Storm Water Shafts and Storm Water Tunnelling, etc."

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Professional Career

Pre-contract Planning / Scheduling

  • Preparation of Tender Schedule (level 2 or 3) including proposed Methodology, Duration analysis, Resource Analysis, Scope Matrix, Proposed Organization Chart, Manpower Histograms & S-curve, Method Statement

Post-Contract Planning / Scheduling

  • Preparation of Baseline Schedule (Level 3 or 4) in coordination with the project team including timeframes, resources & equipment schedule/histograms, submittal logs, cost loading.
  • Collecting & recording all necessary data (% complete, actual labour, etc.) for schedule update
  • Analyzing updated schedule, reporting of problem areas and suggesting corrective actions
  • Generating weekly/bi-weekly and/or monthly progress reports
  • Recording claims, submittal, provisional sums logs in coordination with QS and Document Controller

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

  • Forensic Schedule Analysis (FSA) by using the Recommended Practices of AACEI (29R-03)
  • Sub-contractors programs review / interlink with baseline program, progress monitoring, reporting
  • Developing Key Performance Indicators (KPIs) as required
Sr. Planning Engineer

Al Jaber Engineering Co. LLC (Doha, Qatar) (Feb 2011 to Nov 2012)

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Job Responsibilities

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

  • Technical Planning and Scheduling, Tenders Analysis, Preparation of Method Statements, Preparation of Project Methodology, Preparation of S-Curve / Manpower Histogram / Equipment & Manpower Deployment Schedule, KPIs generation, etc.

Projects

  1. Education City - South Site Wide Infrastructure & Landscaping (North & South Campus) Works

(Project Included Potable/Fire/Irrigation water, TSE Network, Storm / drainage water network, roads, substations, HV / LV / Telecom network, demolition of buildings, etc.)

  1. NADIA's Consolidated Rental Car Facility (CRCF) and Midfield Access Road Tunnel (MTI) Improvement

(Structural Steel Canopies, Buildings, Parking Areas & Parking sheds, Infrastructure including roads)

  1. Qatar Petroleum's EPIC for New Southern Perimeter Industrial Fence in RasLaffan Industrial City
  2. Lusail City's (CP6B Project) Primary Infrastructure for Al Kharaej Towers & Waterfront Residential

(Potable/Fire/Irrigation water / manholes, TSE Network, Storm / drainage water network and Manholes, roads, substations, HV / LV / Telecom network, District Cooling network, Gas network, etc.)

  1. Musheireb Properties' Doha Downtown Phase 1C Project(Residential & Commercial Buildings)
  2. Lusail Development Package 4(Comprising Roads, Tunnels & Underpasses, Fly-overs, Deep Storm Water Tunnel & Deep Shafts, Underground utilities including Potable / Fire / Irrigation water / manholes, TSE Network, Storm / drainage water network and Manholes, roads, substations, HV / LV / Telecom network, District Cooling network, Gas network, etc.)

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Planning Engineer

Square General Contracting Co.LLC (Abu Dhabi, Dubai)(May 2009 to Oct 2010) (1 year 6 months)

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Job Responsibilities

  • Monitoring and Controlling of Tuscan Residences Project
  • Sub-contractors program review , monitoring progress and reporting problem areas / corrective actions
  • Preparation of EOT Claims
  • Updating the submittal & change order logs
  • Preparation of Weekly and Monthly Reports
  • Prepared Project Recovery schedules for different stages of the project i.e. structure, finishing & MEP works

Projects

  1. Project Control of Tuscan Residences (Arezzo, Siena, and Florence Buildings) at Jumeirah Village South, Dubai

Project Value: AED 215,900,000

Client: M/s Damac Properties

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Planning Engineer

Delta Emirates Contracting Co.LLC (Sharjah, Dubai)(July 2007 to May 2009) (2 years)

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Job Responsibilities

  • Preparation, submission and updating of the Project Baseline Program (using Primavera Project Management P6.0) including; detailed construction schedule, material procurement schedule, shop drawings schedule, labor histograms, Cash Flow
  • Forensic Schedule Analysis i.e. Delay Impact and Extension of Time (EOT) Programs/Documents
  • Recording and reporting the actual progress of the work versus theplanned work
  • Preparation of Periodic Reports i.e. weekly/monthly Progress Reports
  • Follow up of Submittals, Procurement Schedule, etc.
  • Project Recovery Program preparation for the construction team to expedite the work

Projects

  1. Dubai Rehabilitation and Handicapped Center, Al Qusais, Dubai

Project Value: AED 59,000,000
Client: Dubai Health Care City (DHCC)
Consultant: Schuster Pechtold

  1. Twin Buildings (2B+G+7 Stories + Gymnasium/Swimming Pool) in Marina, Dubai
    Project Value: AED 59,000,000 + 58,000,000
    Client: Dubai 2020 Real Estate
    Consultant: Arch Group
  2. 3B+G+14 Stories+ Swimming Pool (Office & Residential) Building at Al Barsha First, Dubai.

Project Value: AED 143,000,000
Client: Dubai Islamic Bank (DIB)
Consultant: Arch Group

Updated as on December 19, 20181 of 3

SADEEQULLAH, PLANNER / SCHEDULER RESUME

Planning Engineer

Awal Contracting L.L.C, Sharjah (UAE)(Jan 2006 to July 2007) (1 year 6 months)

Responsibilities

  • Preparation, submission and updating of the project master program
  • Recording progress of the project by comparing with the target project.
  • Submit weekly and monthly progress reports.

Projects

  1. Two G+6 Buildings (Sharjah)
  2. One Factory Shed (Steel Structure in Umm Al Qwain)
Site Engineer

Steel Crete (Pvt.) Ltd., Karachi (PAKISTAN)(April 2003 to Jan 2006) (2 years 9 months)

Responsibilities

  • Making the construction schedules of the projects (Villas/Residential buildings)
  • Supervising the site work and follow up of the subcontractors
  • Arrangement of the labor force and material procurement plan
  • Calculating quantities of the projects, etc.

Projects

  1. G+01 Villa at Defense Housing Authority (DHA) Phase-6, Karachi
  2. G+01 Villa renovation and decoration at Clifton Phase-8, Karachi
  3. Ground Floor Office and Storage (Medical Drugs) building at S.I.T.E (Sind Industrial and Trading Establishment), Karachi