Punjab Edusat Society

(SITE INSPECTION PERFORMA for New ROTs)

DISTRICT : ______

DATE OF VISIT : ______

SCHOOL NAME : ______

Name of School Head ______

Contact No : ______

Hardware

Sr no. / Items / Make & Model(To be Provided Compulsorily / Remarks
(Yes/ No)
1 / 0.9m Ku-band antenna with Penetrating Mount and feed (powder coated for outside weather) / Meltek (Comsat 0.9m)
2 / Ku-band LNBF / Meltek (Gardiner)
3 / Digital Set Top Box with remote control for DVB-S / Meltek (Zenaga)
4 / 40” or above LCD Large Format Display /Professional Display with remote control with wall mounted accessories / Samsung 400 MX3
5 / Wall mounted wooden cabinet for Indoor equipment of ROT like (1) STB, (2) 40” or above LCD Large Format Display /Professional Display, etc. / Pushpak
6 / 1KVA Line Interactive UPS with Batteries / Tritronics Tiny Triton LI-1K
7 / IFL Cable ( RG-6, 30m) / Hughes (Commscope)

PRESENT STATUS: WORKING /NON WORKING

Video / Working / Not working / Needs Improvement
Audio

Date of Installation:______

Date of Delivery:______

Status/ Remarks of Site:

______

Signature/ Stamp of School HeadSign. Of Distt Edusat Coordinator

District : JALANDHAR

COUNTERSIGNED BY

District Education Officer (SE)

INSPECTION PERFORMA OF EDUSAT Libraries

HARDWARE

SNO / Particulars / Total Quantity as per PO / Qty Avble in the school / Working Y/ N / Any Remarks of PES
1 / CPU / 04
2 / TFTs / 24
3 / Keyboard / 24
4 / Mouse / 24
5 / N-Computing Terminals / 20
6 / Headphones / 20
7. / Networking Switch / 01
8. / LAN Patch Cords / 20
9. / UPS 3 KVA / 01
10 / Batteries / 08
11 / Stabilizer 5 KVA / 01
12 / Tables with CPU Stand / 01
13 / Tables without CPU Stand / 12
14 / Chairs / 25
15 / Earthing

SOFTWARE

SNO / Particulars / Working Y/ N / Any Remarks of PES
1 / Hyperlinks
2 / Logo of Punjab Edusat Society
3. / CAL content
4. / Edusat Content
5. / VLC Media Player

Date of Installation:______

Date of Delivery:______

Signature/ Stamp of School HeadSign. of Distt Edusat Coordinator

District ______

COUNTERSIGNED BY

District Education Officer(SE)

SUMMERIZED PERFORMA

ROTs

Total No. of New ROTs
No. of institutions where ROTs are completely functional
No. of Institutions where ROTs are non-functional due to faulty equipment/ theft cases
No. of institutions where conducting of IFL cable from ODU to IDU is required.

E-Libraries (1st Phase)

Total No. of E-Libraries established in the 1st Phase in district
No. of institutions where Hardware and furniture provided and E-Lib completely functional.
No. of Institutions where E-Libs are non-functional due to theft cases, pending installation or faulty equipment
No. of institutions where E-Libs are partially working due to non working of some hardware equipments

E-Libraries (2nd Phase)

Total No. of E-Libraries established in 2nd Phase in district
No. of institutions where E-Libs are completely functional
No. of Institutions where E-Libs are partial functional
No. of institutions where only furniture has been delivered.
No. of institutions where E-Libs not exists due to non availability of room

Signature/ Stamp of School HeadSign. of Distt Edusat Coordinator

District ______

COUNTERSIGNED BY

District Education Officer(SE)