SCOUTSAUSTRALIANSWBRANCHRISKMANAGEMENTPROCEDURES
TermDescription
DEFINITIONS
HazardSomethingthathasthePOTENTIALtocauseharme.g.electricity,height,water,sharpimplement.
RiskTheharmthatwilloccurfromexposuretothehazarde.g.electrocution,falling,immersion,stabbing/cuts
FiveStep Process1. Lookforthehazards
2.Decidewhomightbeharmedandhow
3.Decideoncontrolmeasures
4.Putcontrolsinplace
5.Reviewthecontrols
ControlMeasures(HierarchyofControl)
1.Removetheharme.g.Don’tgonearthecliffedge(obviouslythisisnotalwayspractical)
2.Replacetheharme.g.Relocatetosmallerabseilarea(notalwayspossible).
3.Redesigntheareae.g.Provideclear‘go–nogo’areaswithappropriatesupervision.
4.Provideadministrationprocedurese.g.FollowAdventurousActivityPolicyandRules,follow communitybestpractice.
5.Usepersonalprotectiveequipmente.g.helmets,safetylines,selfrescueequipmentetc.
LIKELIHOOD
Likelihood / DescriptionLikely(A) / Theeventisexpectedtooccurduringtheactivity
Possible(B) / Theeventisnotexpectedtooccurduringtheactivity
Unlikely(C) / Theeventisconceivablebuthighlyunlikelytooccurduringtheactivity
CONSEQUENCE
Consequence / DescriptionMinor (1) / Low-‐levelimpactthatmayrequirefirstaidtreatment,whichshouldnotaffecttheactivitybeingconducted.
Moderate(2) / Mediumlevelimpactthatmayrequiremedicaltreatment,whichmayrequireadjustmentoftheactivity.
Major(3) / High-‐levelimpactwithextensiveinjuries,whichmayrequirecancellationoftheactivity.
IMPACTRATING(LikelihoodxConsequence)
ConsequenceLikelihood / MINOR(1) / MODERATE(2) / MAJOR(3)Likely(A) / Medium / High / High
Possible(B) / Low / Medium / High
Unlikely(C) / Low / Low / Medium
RISKPRIORITY
RiskPriority / ActionHigh(Red) / Ahighriskisonethatmustbedealtwithimmediatelyandwillrequireadetailedactionplan.TheState/RegionalCommissioner(orequivalent)normallymonitorshighrisks.
Medium(Black) / Amediumriskisonethatshouldbedealtwithafterattendingtohighlevelrisksandwillrequireanaction
plan.TheGroupLeader/DistrictCommissioner(orequivalent)normallymonitorsmediumrisks.
Low(Green) / AlowriskisonethatcanbetreatedbyapplyingroutineproceduresattheSection(frontline)level.
RISKREGISTER
Activity:Hazards:
I.D. / Risk / Existing Controls / LikelihoodA-B-C / Consequence1-2-3 / Risk levelH-M-L / AcceptY/N / Priority1.
2.
3.
4.
5.
RISKTREATMENTACTIONPLAN
IDNumber:Risk:
Treatmentoptionsconsidered:1.
2.
3.
ActionPlan:
1.Proposedtreatment(whatdoyouintendtodotoreducetherisk?):
2.Resourcerequirements(whatdoyouneedtoreducetherisk?):
3.Responsibilityforimplementation(whoisgoingtodothis?):
4.Timings(howlongwillthistaketodo?):
5.Reportingandmonitoringrequired(howareyougoingtocheckthishasbeendone?):
I.D. / Risk (in priority order from the Risk Register) / Analysis of risk AFTER treatmentTreatment
action taken / Likelihood
A--B--C / Consequence
1--2--3 / Risk Level
H—M—L / Accept Y/N / Priority
1.
2.
3.
4.
5.
Prepared by:
Date: / Approved by:
Date: