Undesignation of Network/Native Load Resource

Fax to PSEI at 425-462-3049

Company Submitting
Representing (if applicable)
Person requesting
Address
Phone
e-mail
FAX
Network/Native Load Resource to be Undesignated
Capacity to be Undesignated(MWs)
Start date (mm/dd/yyyy)
Start time (hh:00) (00-23)
Stop date* (mm/dd/yyyy)
Stop time*(hh:00) (00-23)
Related transmission service requests
Attestation for Redesignation attached(yes or no)
Comments
  • If Stop Date and Stop Time are left blank, this request will be deemed a permanent termination of the named Network/Native Load Resource capacity.

For Temporary Terminations:

By submitting this Notice, Transmission Customer for Network/Native Load Service (“Customer”) confirms that the information contained in Customer’s Application as submitted pursuant to Section 29.2 of Puget Sound Energy, Inc.’s Open Access Transmission Tariff prior to this Temporary Termination is and remains accurate for the designated Network Resource listed above (as such information with respect to the amount of power constituting such Network Resource is modified by this Temporary Termination for the date for which this Temporary Termination is made). All such information as so submitted (and as so modified for the date for which this Temporary Termination is made) is incorporated herein by this reference.

By submitting this Notice, Customer states and attests that the Network Resource listed above satisfies the following conditions:

(1)the Customer owns the resource, has committed to purchase generation pursuant to an executed contract, or has committed to purchase generation where execution of a contract is contingent upon the availability of transmission service under Part III of the Tariff; and

(2)the Network Resource listed above does not include any resources, or any portion thereof, that are committed for sale to non-designated third party load or otherwise cannot be called upon to meet the Customer's Network Load or Native Load on a noninterruptible basis.

As used in this paragraph, "Network Resource" means the designated Network Resource listed above (as such Network Resource is modified with respect to the amount of power constituting such Network Resource by this Temporary Termination for the date for which this Temporary Termination is made).

The table above indicates the MW amount of un-designation requested for the Network Resource listed above (for the period of time specified). Such un-designated amounts are reflected by entries greater than zero in the table above. To the extent not already designated, the Network Resource listed above is re-designated in its full capacity as a Network Resource at the stop time of the stop date indicated above.

To use this table, insert the appropriate dates for which un-designation is made in the spaces indicated above. Specify the resource capacity, in megawatts, to be un-designated for the specified period. Questions - call PSE preschedule at 425-462-3400.

This document will be modified from time-to-time as the various issues surrounding Order 890 implementation are addressed. Questions and or comments can be directed to Bob Harshbarger at 425-462-3348 or . 9/22/2018