Punjab Edusat Society
(SITE INSPECTION PERFORMA for New ROTs)
DISTRICT : ______
DATE OF VISIT : ______
SCHOOL NAME : ______
Name of School Head ______
Contact No : ______
Hardware
Sr no. / Items / Make & Model(To be Provided Compulsorily / Remarks(Yes/ No)
1 / 0.9m Ku-band antenna with Penetrating Mount and feed (powder coated for outside weather) / Meltek (Comsat 0.9m)
2 / Ku-band LNBF / Meltek (Gardiner)
3 / Digital Set Top Box with remote control for DVB-S / Meltek (Zenaga)
4 / 40” or above LCD Large Format Display /Professional Display with remote control with wall mounted accessories / Samsung 400 MX3
5 / Wall mounted wooden cabinet for Indoor equipment of ROT like (1) STB, (2) 40” or above LCD Large Format Display /Professional Display, etc. / Pushpak
6 / 1KVA Line Interactive UPS with Batteries / Tritronics Tiny Triton LI-1K
7 / IFL Cable ( RG-6, 30m) / Hughes (Commscope)
PRESENT STATUS: WORKING /NON WORKING
Video / Working / Not working / Needs ImprovementAudio
Date of Installation:______
Date of Delivery:______
Status/ Remarks of Site:
______
Signature/ Stamp of School HeadSign. Of Distt Edusat Coordinator
District : JALANDHAR
COUNTERSIGNED BY
District Education Officer (SE)
INSPECTION PERFORMA OF EDUSAT Libraries
HARDWARE
SNO / Particulars / Total Quantity as per PO / Qty Avble in the school / Working Y/ N / Any Remarks of PES1 / CPU / 04
2 / TFTs / 24
3 / Keyboard / 24
4 / Mouse / 24
5 / N-Computing Terminals / 20
6 / Headphones / 20
7. / Networking Switch / 01
8. / LAN Patch Cords / 20
9. / UPS 3 KVA / 01
10 / Batteries / 08
11 / Stabilizer 5 KVA / 01
12 / Tables with CPU Stand / 01
13 / Tables without CPU Stand / 12
14 / Chairs / 25
15 / Earthing
SOFTWARE
SNO / Particulars / Working Y/ N / Any Remarks of PES1 / Hyperlinks
2 / Logo of Punjab Edusat Society
3. / CAL content
4. / Edusat Content
5. / VLC Media Player
Date of Installation:______
Date of Delivery:______
Signature/ Stamp of School HeadSign. of Distt Edusat Coordinator
District ______
COUNTERSIGNED BY
District Education Officer(SE)
SUMMERIZED PERFORMA
ROTs
Total No. of New ROTsNo. of institutions where ROTs are completely functional
No. of Institutions where ROTs are non-functional due to faulty equipment/ theft cases
No. of institutions where conducting of IFL cable from ODU to IDU is required.
E-Libraries (1st Phase)
Total No. of E-Libraries established in the 1st Phase in districtNo. of institutions where Hardware and furniture provided and E-Lib completely functional.
No. of Institutions where E-Libs are non-functional due to theft cases, pending installation or faulty equipment
No. of institutions where E-Libs are partially working due to non working of some hardware equipments
E-Libraries (2nd Phase)
Total No. of E-Libraries established in 2nd Phase in districtNo. of institutions where E-Libs are completely functional
No. of Institutions where E-Libs are partial functional
No. of institutions where only furniture has been delivered.
No. of institutions where E-Libs not exists due to non availability of room
Signature/ Stamp of School HeadSign. of Distt Edusat Coordinator
District ______
COUNTERSIGNED BY
District Education Officer(SE)