University of the Witwatersrand

Library Computer Services

Minutes of the meeting held on the 06 March 2012

Chair: Charl Roberts (CR)

Present: Vernon Naidoo (VN)

Khulisa Sithole (KS)

Lewatle Phaladi (LP)

Phathu Bongwe (PB)

Benedict Mofosi (BM)

Simon Mofokeng (SM)

Senzo Nkosi (SN)

Suzanne Saunders (SS)

Apologies:

Minutes by PB

Agenda points / Discussions / Decisions / Attention / Deadline
Welcome and introductions / ·  Chairperson welcomed everyone
Meetings Report back
SMT Report back / ·  No Feedback from SMT / CR / Next Meeting
CMG / ·  No Feedback / CR / Next Meeting
CAB Report back
CAB Attendance:
LP - Jan, Sept
PB - Feb, Oct
VN – Mar, Nov
KS – April, Dec
BM - June, Aug
SN - May, July / ·  No feedback for the Library / PB, SN, SS / Next Meeting
Client Services / No Feedback on issues – all resolved
Projects
LAN Switch upgrades / ·  Completed
24 hour reading room / ·  Completed, we will put a Message on wits clips and library website / SM / Next meeting
KC1 Expansion / ·  Furniture has arrived - not up to spec, cant install. Security issue
o  Company to install verticals bars to secure the desk SM / SM / Awaiting Admin
Primo / ·  Next meeting March 26 – ExLibris / RLC Tele conference / CR / 26 Mar
OER / ·  Meeting with ELSI 15 Feb re OAE install. OAE is the latest version of SAKAI / CR / Ongoing
Disable Student Unit / ·  Post grad reading room (EDUC) as the location and the units should be installed. Points, software , license to be done
·  Data point installed (EDUC)
·  SM to follow up with Sello about the signage for WWL to point to the Disability Units
·  CR attends Disability interest group / SM / ASAP
LIBGUIDES / ·  Subject list not working – VN to log call and report back – VN and KS not able to generate subject list – VN to reopen call / VN / Next Meeting
Lib Cal / ·  Quotation received - CR to take it to SMT
o  700 USD PA 10admin/10venue/10calendars / VN / Next meeting
P4P / ·  No issues / PB / Next Meeting
Minolta P4P / ·  SM to discuss with KM and Minolta on the release of the printer back to Minolta
·  SM to get Minolta’s number from KM / SM / Next meeting
i-FOLDER / ·  Rollout on request and with Win 7 roll out / PB,BM,SN / Ongoing
Historical Papers / ·  Ryan computer to be moved to Dig Centre / BM / Ongoing
Wireless / ·  SM to discuss with Marius when the APA in LCS will functioning on Wits Mobile
o  APA issue to go to CMG CR – done see CMG report at the top / SM / Next meeting
WIREDSPACE / ·  Projects are addressed in the Web team meeting
·  Stats Report LP for WIREDSPACE – LP to work on Web analyzer
·  1.8 DSPACE Upgrade will be done on the 6th March – staff in TS to be give advance warning
·  Postgres needs upgrade – LP to arrange with Sherona / LP / Next meeting
OCS/OJS / ·  LP and CR to meet to discuss the problem of review process and published items not showing / CR LP / Next meeting
Self-check / ·  CSX coming Monday 12th for setups / SM / 12 March
Digital Signage / ·  SN needs training on the system
o  SS to discuss with PM re possible test content
·  All staff should check Libraries when they do calls there and report if systems are switched off
·  PB to talk to Devind at WHSL re a contact at Health Sciences Faculty to see if their content can be added to the WHSL DS. Glenda requires the system to be linked / SN, PB / Next meeting
Wits Digitization Center / ·  Book eye to be moved – SM New date to be negotiated
o  Testing still outstanding – move almost complete
o  CR suggested another vendor be sought for support / SM
PB / Next meeting
Windows 7 rollout / ·  Cibex, dameware not running when windows 7 is installed
o  SM logged call with CNS awaiting feedback
·  Checklist should be introduced and followed
·  Rollout to be completed Mid-2012 / SM,PB, BM / Next meeting
Mid-2012
Help Desk and Register / No issues
LAN Sweeper / ·  Feedback after March - waiting for Shareen at CNS procurement
·  Shareen spoke to Rene about the project. Rene is not keen on this project any longer – probably will not be bought by CNS / SM / ongoing
HW and SW Registry / ·  OCS Inventory installed and tested.
·  SM to send the online registry link to LCS for testing
o  SM investigating options / PB,BM,SN / ongoing
Exam Site / ·  LP to discuss with Sherona at CNS and get the spec of the server as well as the current space up take – ask for 100gig, Ubuntu environment.
o  Email Parish
o  Pending information a request for cloud hosting will be made / LP / 21 Feb
World Cat Local / ·  KS working on records
o  Still being updated
·  Discovery tool must search across all our digital systems
·  SS awaiting info on HTML and CCS updates
·  VN doing logo creation for SS
·  CR waiting for details re harvesting of digital collections / SS/KS / Sep 2012
Science Library / ·  SM and CR to attend Library Meeting
·  Library team meeting Thursday 8th March
·  CR request LCS team to send suggestions / CR,SM / 8 March
RC Laptop Rollout / ·  12 Laptops replaced
ECR01 Expansion / ·  Net top to be done, different net top version
·  All PC’S to have Millennium installed
·  Deep Freeze on Teacher’s machine required
·  Smart Board installation
·  Windows 7 rollout / SM / 19-23 March
ECR03 / ·  Quotes for Maryna, SM to send quote to CR on the Dell upgrade
·  HP quote is more expensive than Dell
·  R300000 budget available from School / SM / Next week
Workgroups LCS participates in
Network Architecture
ZA-WWW2011
Mobility workgroup
FOER workgroup / ·  See OER project feedback above / CR / Ongoing
ET@Wits Team
ICADLA – 2 / CR / LP / SM / ongoing
Digitization / ·  Next meeting 8th March / CR / Ongoing
CLE Workgroup / ·  CR meeting on the 1st march – library integration, library and Rims
o  Awaiting ELSI feedback / CR / Ongoing
MILL – no feedback
Printing Templates / ·  Spine Labels -> waiting for feedback from Millennium
·  Label machine issue, innovative to demo
·  Print Templates -> still not working – on hold
·  Feedback on line break – working or not / SS / Ongoing
Reclamation Projects / On going / SS / Feedback next week
Sierra / ·  No Budget / SS / KS / CR / Ongoing
Patron Upgrade / ·  It’s a project that is being attended to by CNS, Library and Wits Plus
·  SS setup meeting with Mena at CNS for feedback / SS/KS / ASAP
General / ·  SSL not working
·  KS to update III call and Zendesk call
·  CR suggested we get feedback from III and then involve CNS and vendor / KS / SS
LP / Next meeting
Branches
Branches / WCL
·  Ryan to be moved to Dig Center / PB
SM / Next meeting
LAW
·  Speakers for Surendra / BM, PB, SN / Next meeting
ARCH
·  No issues
MGMT
·  No issues
EDUC
·  No issues
BIOPHY
·  No issues
WHSL
·  Cibex SM follow up on Glenda PC – call logged with CNS / PB SM / Next meeting
GEOMATHS
·  No issues
ENGIN
·  Changing Power cables to Red plugs for PC, One pc outstanding / SN / Next meeting
COMM
·  No issues
WWL
·  Janet needs a docking station – order done
·  Suzanne should consider using a Laptop- SM should order a docking station (2012) – order done
·  Bartender software purchase – order created / SM
PB / Next meeting
General
General Issues / ·  LCS leave
o  See Calendar for SS dates
o  2nd April to 17th April LP (2nd march)
o  CR 5th may – 28th may
o  VN 16th March(HD),30th April
o  KS 2nd and 30 April
o  LP 2nd – 17 April
o  SS 30th March(HD)
·  CR is going ahead with buying the cable tester 2012 – SM to get quote
·  Team building – Gold Reef- 9TH March
·  Course to attend – Please discuss with CR and fill request on Oracle
·  Next B Day – Senzo end of March
·  SS to buy a Kettle
·  BM to be responsible for LCS Storeroom for next 3 month / ALL / Next meeting
Staff Report backs
CR:
·  9 calls
PB
·  15 calls
VN
·  14 calls
SS:
·  1 calls
LP: 2 calls
KS:
·  19 calls
SM:
·  4 calls
BM
·  12 calls
SN
·  10 calls
Next Meeting
LCS minutes scribers: / 21 February 2012
KS – Jan, Sept
VN – Feb, Oct
PB – Mar, Nov
LP – Apr, Dec
BM - May, July
SN - June, , Aug