Measure Rite USA
216 N. Nassau Ave., Margate, NJ 08402
Phone 1-215-674-8516 Fax 1-800-788-1077 / Email:
Website:

Application & Configuration Form (ACF)

  1. General Information

Date: / 3DLevelScanner Model: S M MVMVL2
Company Name:
Street: / City:
Zip: / State:
Contact Name: / Title:
Phone: / Fax:
E-mail: / Company Web Site:
  1. Type & Quantity

Graphic Visual Mapping Required? / Yes No
Quantity to Quote / Potential Quantity Required
  1. Scanner Details

I.D. orName: Scanner Name
(up to 16 characters) / Polling Address: 00
(between 00 to 63) / Measurement units: m, ft / Temperature units:
Fahrenheit, Celsius
  1. Material Characteristics

Material type: / Select Industry: Select from listAggregates & MiningBio-EnergyCementChemicalsFood and BeverageGrainsMetalPaperPlasticsPowerWater TreatmentOther
Material Density:, g/cc, lbs/Cu. ft. / Angle of Repose:
Particle Type:Select from listAggregatePowderFlakePelletGranularGravelOther / Characteristics: Select from listFree FlowingStickyWetBrigesRat HolesOther
Max. Temperature: , Fahrenheit, Celsius / Maximum Pressure: , Bar, PSI
  1. Vessel Details

Vessel Shape: Select from listCylinderRectangleStock PileOpen BinOther / Internal Structure:Select from listNoneAeration TubeAgitatorBag HouseCleanout CageDust MonitorLadderStiffening BarsTemperature Cable, Other:
Internal Movement: YES, NO, If yes, please describe:
Note: it is recommended to put the Empty calibration level above internal structure
  1. Vessel Dimensions (internal)

Center / CYLINDER: Height: Diameter:
CUBE: Height: X: Y:
Top / Bottom
Flat
Cone: Height: Top Diameter:
Dome: Height:
Pyramid: Height: X: Y:
Other: / Flat
Cone: Height: Bottom Diameter:
Dome: Height:
Pyramid: Height: X: Y:
Other:
  1. Filling and Emptying Processes

Filling Method: Gravity Pneumatic Conveyor Other: / Dust during fill: YES, NO
Emptying Method: Gravity Pneumatic Conveyor Other:
Note: When using air pressure inside the vessel near the emptying location, the bulk density might change and effect the measurements
Max Filling Rate:Tons/hr / Total Capacity when vessel is full: Tons
Max Emptying Rate: Tons/hr / Weightbelow Empty Calibration level: Ton
  1. Electrical Power requirements & Signal Outputs

Power Supply Requirement / 2 Wires – for 24VDC (range 20 to 36VDC) Required
Standard Outputs / 2 wires – for 4-20mA and HART Communications
2 wires – for RS485 (Twisted-Pair, 120 Ohm Impedance, Shielded)
  1. Scanner, Filling and EmptyingLocations

Location of sensor

Full Calibration – 20mA (100%)

Empty Calibration – 4mA (0%)

m, ft / XYZ / XYZ
Scanner Location : / , , / , ,
Filling Location: / , , / , ,
Emptying Location: / , , / , ,
Full Calibration / , m, ft
Empty Calibration / , m, ft

Note:Scanner’s Z position is measured from the bottom of the vessel

Note:Full/Empty Calibration Distances measured from scanner’s transducers top

Approved by:

Full Name:Title:

Date:Signature:

Note:

Cells enclosed with the sample on the left must be filled prior to the configuration of the 3DLevelScanner.

Page 1 of 3Ver. 112/01/16