WI Plan Review Web Scheduler Notes for Your Canopy
Must apply for new or addition plan review appointments online go to Plan Review / Web-Schedule Plan Review (Building Plumbing) / Click Buildings & Fire Suppression link below picture on bottom left / Click Plan Review Scheduler link below picture on bottom right
If it’s a revision to a previously approved plan (canopy has a structural change after approval received but prior to construction as long as it is still the same area) do not use online appointment request as the below describes. Email Transaction ID to nd give details of change and original File Type. For area changes, must start over with new plan review to get appropriate fees.
Task 1 Notes
Date Plans Will be in DSPS office:Choose approx. 3 weeks from today’s date to allow enough time to coordinate all paperwork for the submittal, including a formal site plan showing the proposed canopy and dimensions to all other buildings on lot and to property lines. Most plan review appointments are 3.5 to 6.5 weeks from today’s date.
File TypePaper or E-File, except when using Building Design & Engineering
Plan TypeChoose New for Ground-up, choose Addition Alteration for addition to existing canopy
Scope of Service RequestedMost plan reviews “Building & Architectural Review” or “Building & Architectural Review & Permission to Start” (Permission to start gives ok to do footings before plans are approved at owner’s risk, costs approx. $175 extra, requires owner’s signature, requires all submittal documents before permission to start letter is issued). Once in a while another designer is involved in the footing design, and then scope may be set up as components or otherwise differently.
Review OfficeWe prefer Madison, and write that on the comments section of Task 1 bottom of page – lots of reviewers and most consistent
Task 2 Notes
Total Building Volume over 50,000 cu. Ft?Length x Width x Height up to top of fascia in cubic feet (if addition, must include volume of entire building, addition + existing)
Designer Information E-File submittals or hard copy submittals
Option#1 preferredCustomer ID #1037314 (usually 2nd on list of 3 matches)
Michael Blodgett, P.E.
Blodgett Engineering LLC
W169 N10815 Redwood Lane
Germantown, WI 53022
262-293-9923 Phone
262-293-9923 Fax
Not a first time submitter, has submitted in last 2 years
If over 50,000 cf, choose Supervising Professional & Designer E15448 of building
If under 50,000 cf, choose Designer E15448 of building
Designer Information Hard copy submittals only
Option#2 back-upCustomer ID #846586
Richard “Dick” Stelmacher, P.E. R.A.
Building Design & Engineering
764 Bragg St
Fond du Lac, WI 54935
(doesn’t check often, prefers phone)
920-923-1174 Phone
920-923-1174 Fax
Not a first time submitter, has submitted in last 2 years
If over 50,000 cf, choose Supervising Professional & Designer of building
If under 50,000 cf, choose Designer of building
Owner InfoMust fill out
Additional CustomersNot required, but can fill out if there is a specific “Mail To” customer for paper submittal types who is different than the owner, such as a petroleum marketer.
Task 3 Notes
First PageChoose “Add a Building”. If more than one canopy on the same site, add each canopy’s info under the same plan review
Second Page
Type of BuildingCanopy, Free Standing
Total Building VolumeLength x Width x Height up to top of fascia in cubic feet (if addition, must include volume of entire building, addition + existing)
Occupancy TypeM Mercantile for Retail Petroleum
Number of Additional Occupancy(Don’t choose any)
Construction ClassUse IIB for nearly all canopies - all metal non-combustible, VB for mixed materials such as canopy with roof system made of combustible plywood & shingles
AreaLength x Width in sq ft (if addition, only include addition area, not existing)
Number of Floor Levels1
Number of Addition Identical Bldgs(Leave Blank for none)
Sprinkler CoverageNone (If there is, added dead is required on canopy’s structural design to support piping & equipment – this should be communicated to King before plans are submitted)
Sprinkler DesignNone
Addition / Alteration LevelIf under 50% of existing building is affected by addition, choose Level 2. If 50% or more of existing building is affected by addition, choose Level 3.
If tenant buildout, addition or alterationFor additions, write “Addition to side” or “Addition to end”
**When finished filling out page, click “NEXT Enter Building Designation” button
Third Page
Building DesignationType “Gas Canopy” or “Diesel Canopy”
**When finished filling out page, click “Save Building and Go To List” button
Add any additional canopies on same site and repeat Task 3 Steps. Otherwise, Click “Click Here when finished adding Buildings”
Task 4 Notes
Proof Read & Click “Submit Application”
**When appointment confirmation arrives, email Sarah a copy so we can forward to the engineer to sign.