As of DECEMBER2016

2016 LETTERS OF NO OBJECTION

Ascension Parish

No.CompanyStationDescription

WAIVER granted 1/11/16 for displacement piles beyond the 200 feet landward from levee toe to +13

15081790IMTT – Geismarb/w 2320To install underground piping and electrical grounding grids, pump pits and

Through CDI& 2335shallow foundations, pipe piles and pile caps, structural steel pipe supports and

(+15) piles on flood sidea crushed limestone parking lot on the protected side and to install a dock safety

(+11) all elseunit on the flood side

14050551 Modification Extension - 2/19/17

Delta Terminal Services, LLC2276+000To extend modification of the original LONO which includes permission to

(+11)Kinder MorganHydraulic Directional Drill three (3) pipelines and to construct a pipe bridge

Through EDG, Inc.

160224009IMTT – Geismar2347+00To demolish a security building at 8112 Highway 75 and to construct a new

(+13)building with shallow footings

160302012AT&T2363+00To install 78 feet of fiber optic cable via directional bore

(+11)Through Byers Engineering

160405016Honeywell2155+00To construct the Shelter-in-place Conference Facility and to install associated

(+14)utilities

160411020Bocage Plantation2849+00To drill two (2) soil borings

(+12)Through Gulf South

15080680 Modification

Air Liquide Geismar Utilities Svc.2271+00To modify LONO 15080680 which now includes two (2) caissons to secure each

(+15)Through CB&Ipump within the original foot print

160428025Entergy Louisiana, LLC2545+00To install a power pole at 36035 Kerry Street

(+11)Through Land Management Svc.

Ascension Parish

No.CompanyStationDescription

14040444 Modification Extension 2

Methanex2246+60To extend the modification of the original LONO which includes installing a

(+11)Through EDG, Inc.temporary water line

160524040ATMOS Energy2975+00To extend a gas line to a commercial building along and under Hwy 44

(+12)Through SJB Group, LLC

14020722 Modification Extension

Houmas House2945+00To extend the modification of the original LONO which includes removing the

(+11)Through Murray Architectsoriginally requested platform and approved structure on the batture and altering
the access bridge over the levee and River Road

160607050Ascension Parish2889+00To drill one (1) soil boring for the Hillaryville Pump Station and Effluent Force

(+11)Through Eustis EngineeringMain project

160620056Entergy Louisiana, LLC2696+00To install one (1) power pole at 3378 Wyatt Street

(+11)Through Land Management Svcs.

160630059Kip Hernandezb/w 2810To install a ditch

(+11)& 2845

Excavations no deeper than 2.5 feet

160711061Renewable Energy Group2235+75To transport twelve (12) components across the levee

Through Mammoet

(+6) Donaldsonville

(+11) Carrollton

160725070City of Gonzales2981+00To repair and replace the existing joint transition sysem

(+11)Through GSA Consulting

Ascension Parish

No.CompanyStationDescription

160726072Maurepas Pipeline, LLC3587+00To construct the Maurepas Pipeline Project which includes 6-inch, 16-inch and

(+11)Through QPS24-inch pipelines for 35 miles from Burnside to Norco by horizontal directional

drill (HDD) under the Mississippi River and left descending Mississippi River

levee, in Ascension, St. James, St. John the Baptist and St. Charles Parish

130819113 Modification 2 Extension until 08/19/2020

Methanex USA, LLCb/w 2240+50To extend the LONO for the piles and the pile caps only

(+11)& 2255

160811081Westlake Chemical2262+90To replace an existing 10-inch EDC pipe on an existing pipe rack from an existing

(+11)Through CDIdock on the flood side, across the levee and on existing sleepers on the protected

side of the levee; to install a 14-inch pipe under the CNRR, but above grade on

the protected side of the levee; and to install four (4) new sleepers

160821088AT&Tb/w 2667To excavate and install four (4) new hand holes over existing telco duct

(+11)Through Byers Engineering& 2697

15030432 Extension until 3/4/17

Shell Chemical2356+00To excavate for two (2) new buildings

(+11)

160902095Boardwalk Midstream2196+00To perform two (2) emergency anomaly repairs

(+11)Through Providence& 2252+00

160909101AT&Tb/w 3017To install fiber optic cable to service 4162 Hwy 44

(+11)Through Byers& 3031+50

160909103LA DOTDb/w 2712To rehabilitate LA 942

(+11)& 2847

Ascension Parish

No.CompanyStationDescription

160909104Entergy Louisiana, LLC2945+00To install two (2) new poles and underground conduit for Houmas House at

(+11)Through Land Management Svcs.41036 Hwy 942

160920111Praxair, Inc.2291+00To drill one (1) soil boring at 9154 Hwy 75

(+11)Through Fugro Consultants, Inc.

160920113Impala Warehousing (US), LLC2985+00To install two (2) T-anchors on the flood side

(+11)Through Providence

160930118Methanexb/w 2326To drill four (4) soil borings at the methane facility

(+11)Through Tolunay-Wong& 2283

13041547 Modification Extension 2 until 10/25/17

Impala Warehousingb/w 2980To extend the original LONO which includes using heavy lift cranes on both

(+11)& 3020sides of the levee to construct a new conveyor truss

160930124Shell Chemical LP2377+00To transport vessels across an existing ramp and to temporarily place timber

Through Lanier & Associatesmats on the batture

Below +11 on Carrollton

Above +2 on Donaldsonville

161010125Impala Terminals Burnside, LLCb/w 3819To drill five (5) soil borings on the protected side and to drill six (6) borings in the

(+11)Through Eustis& 3825+00river

160711061 Modification

Renewable Energy Group2235+75To modify the original LONO which includes the transport of 20 components

Through Mammoetinstead of 12

(+6.5) Donaldsonville

(+11) Carrollton

Ascension Parish

No.CompanyStationDescription

160711061 Modification 2

Renewable Energy Group2235+75To modify the offload location to 423 feet from the centerline of the levee instead Through Mammoet USA of the original 357 feet

(+6.5) Donaldsonville

(+11) Carrollton

161020131Parish of Ascension2889+00To place a new effluent force main across the left descending Mississippi River

(+11)Dept. of Public Utilitieslevee as part of the Hillaryville Pump Station and Effluent Discharge Force Main

Project

161020132Enlink Midstreamb/w 2241To excavate and conduct hydrostatic testing on a 20-inch and 12-inch pipeline

(+11)Through T. Baker Smith, Inc.& 2275

161103133Shell Pipeline Company, LP2355+00To replace an 8-inch natural gas pipeline at 7594 Hwy 75

(+11)

161110142Innophos, Inc.2153+00To drill two (2) Class V Wells at the Innophos Geismar Plant (5,220 ft) as well as a

Through WSP – Parson Brinckerhoffrig supply water well

(+11) – 1,000 feet

161121147Entergy Gulf States LA, LLC2170+00To replace four (4) poles and anchors

(+11)Through Hydro Consultants& 2232+00

161130150Boardwalk LA Midstream, LLC2333+00To excavate to install test leads around a pipeline

(+11)Through Providence

Ascension Parish

No.CompanyStationDescription

15081790 Modification

IMTT – Gesimarb/w 2275+00To modify the original LONO which includes the installation of a 12-inch

(+11)Through CDI& 2330+00methanol pipeline to transfer product between Methanex and IMTT Geismar terminal

161209154Entergy Gulf States2422+00To install five (5) new poles along LA Hwy 75 near the intersection with LA Hwy

(+11)Through Hydro Consultants3251

161214159Atmos Energyb/w 2713To upgrade the natural gas system along LA Hwy 942

(+11)Through SJB Group, LLC& 2981

161214162Entergy Gulf States LA, LLC2255+00To install six (6) new power poles and replace five (5) existing poles along LA

(+11)Through Hydro ConsultantsHwy 73

161229165AT&T2712+00To install 1908 feet of 1 ¼” conduit and fiber optic cable along Hwy 75 & 942

(+11)Through Byers Engineering

161229166Innophos, Inc.2150+00To drill three (3) soil borings

(+11)Through Eustis Engineering

161229170Shell Chemical LPb/w 2355To perform subsurface activities for a rail/shipping expansion project

(+11)& 2362