Segment A: Inner Portland
Map ID / Project Name / RecommendationA / Broadway and Caruthers Street sidewalks and bikeway / Do not study in DEIS; reconstructs existing sidewalk
B / 1st Avenue bikeway / Study in DEIS
C / Naito Parkway to Hooley Bridge bikeway / Study in DEIS
D / Hamilton Street/Terrace bikeway and sidewalks / Study in DEIS
Segment B: Outer Portland
Map ID / Project Name / RecommendationA / Chestnut Street bikeway / Study in DEIS
B / Terwilliger Parkway bikeway gap / Study in DEIS
C / Custer Drive sidewalks / Study in DEIS
D / Pedestrian/bicycle bridge over I-5 near Custer Street / Study in DEIS
E / Capitol Hill Road sidewalks and bikeway / Study in DEIS
F / 19th Avenue bikeway / Study in DEIS
G / Troy Street bikeway / Study in DEIS
H / Spring Garden Street and Dolph Court sidewalks and bikeway / Study in DEIS
I / 24th Avenue sidewalks and bikeway / Study in DEIS
J / 26th Avenue sidewalks and bikeway / Study in DEIS
K / 30th Avenue/Hume Street/31st Avenue sidewalks / Study in DEIS
L / Capitol Highway sidewalks and bike lanes / Study in DEIS
M / Taylors Ferry Road sidewalks and bikeway / Study in DEIS
N / 40th Avenue sidewalks / Study in DEIS
O / Outer Capitol Highway pedestrian improvements / Study in DEIS
P / Pedestrian/bicycle bridge over I-5 near Luradel or 53rd / Study in DEIS
Q / Pomona Street sidewalks and bike lanes / Study in DEIS
R / Pasadena Drive sidewalks and bike lanes / Study in DEIS
S / Barbur Boulevard - Tigard Triangle walk/bike connection / Study in DEIS with revised scope: on-street connection via Lesser
T / Tigard Triangle - PCC Sylvania walk/bike connection / Study in DEIS with revised scope: connection via Lesser
Segment C: Tigard and Tualatin
Map ID / Project Name / RecommendationA / 72nd Avenue sidewalks and bikeway: 99W to Dartmouth Street / Study in DEIS
B / Atlanta Street roadway extension / Do not study in DEIS (instead, study project #1 below)
C / 72nd Avenue sidewalks and bikeway: Dartmouth Street to Hunziker Street / Study in DEIS
D / Hall Boulevard, Scoffins Street and Hunziker Street intersection alignment / Do not study in DEIS:Could occur as mitigation
E / Hall Boulevard sidewalk infill / Study in DEIS with revised scope: Knoll Drive to Bonita Road
F / 72nd Avenue sidewalks and bikeway: Hunziker Street to Bonita Road / Study in DEIS
G / Bonita Road bikeway: 72nd Avenue to I-5 / Study in DEIS
H / Bonita Road sidewalks and bikeway: I-5 to Windfield Way / Study in DEIS
I / Pedestrian/bicycle path along I-5 between Bonita Road and Cardinal Lane / Study in DEIS
J / 72nd Avenue sidewalks and bikeway: Bonita Road to Upper Boones Ferry Road / Study in DEIS
K / Carman Drive sidewalks and bikeway / Study in DEIS
L / 72nd Avenue sidewalks and bikeway: Upper Boones Ferry Road to Durham Road / Study in DEIS
M / 72nd Avenue sidewalks and bikeway: Durham Road to Lower Boones Ferry Road / Study in DEIS
N / Pedestrian/bicycle path along I-5 between Bridgeport Village and Tualatin River Greenway / Do not study in DEIS (instead, study project #2 below)
1 / Baylor Street sidewalks and bikeway / New project: Study in DEIS
2 / Walk/bike improvements on Lower Boones Ferry Road and Boones Ferry Road / New project: Study in DEIS
Selected Projects Suggested During Scoping
Map ID / Project Name / RecommendationA / Improve the SW Urban Trail route (SW 19th from SW Barbur to SW Capitol Hill Road-paved pedestrian pathway and improved lighting) / Do not study in DEIS:Reviewed by PBOT, Capitol Hill Rd improvements and Barbur sidewalks will serve this area
B / Shift bicycle/pedestrian improvement on Barbur Boulevard to a one-sided multi-use pathway (South of Naito to Burlingame Avenue) / Design consideration in DEIS
C / Fix Condor Avenue- slow traffic, and provide one safe connection between Barbur and Terwilliger / Do not study in DEIS:Redundant with Hamilton St. bikeway
D / 19th Avenue bikeway: Extend south to Taylor’s Ferry and north to SW Capitol Hill Road / Do not study in DEIS:Redundant with Capitol Hill Rd improvements
E / Improvements to trail 4 which runs parallel to I-5; including a new bicycle connection from SW Baird to SW 12th / Do not study in DEIS:Beyond the scope of this project
F / Add increased bicycle access on SW Custer Street, south of I-5, to the east. / Do not study in DEIS:Connections from new bridge may be studied during design
G / No widening of Chestnut to add bike lanes and sidewalks / No widening anticipated:Design consideration for DEIS
H / Red Electric / Do not study in DEIS: Remains in Shared Investment Strategy
I / Other suggested expansions to existing projects / Do not study in DEIS
J / Other suggested projects too far away from stations / Do not study in DEIS
1