Karl Murray
28Malone loop Meadow Springs WA
T: 0474708082
karl-murray

Objective

My work experience covers a multitude of varied projects, Greenfield, Brownfield, module construction LNG, Power, Maintenance to name a few where I have been fortunate to provide services which specialize on Planning/Scheduling, Project monitoring and management being proficient in all versions of Primavera. Always willing to listen and learn as well as lead if required, being flexible in any work environment, adaptable to changes and improvements with a real focus problem solving approach whilst being very proactive in ensuring a positive culture, way forward at all times.

Having worked for the client and EPCM within the Oil & gas industry/Power etc, for over thirteen years working my way up from a tradesman, showing enthusiasm and initiative in the field and due to my knowledge of computing I was quickly offered a position in trainee management as a planner scheduler. Being fortunate to have worked in the industry as a tradesman planning has become a natural process for me as I can readily envisage the sequential steps and processes required to produce and work with a realistic schedule whilst understanding both the need for correct reporting of all deliverable in the correct format providing information on all the required deliverables.

Through hard work and my ability to work with all levels of management I have progressed steadily into becoming a very competent project planner who works well at all levels.

Experience

Senior Functional Planner / June 2013–June 2014
BP Angola Exploration, London, UK – Luanda, Angola
  • As Functional Planner is part of the BP Angola activity planning team split between Sunbury (UK) and Luanda (Angola). The team supports all regional activities associated with the Greater Plutonio and PSVM deep water FPSO’s.
  • My responsibilities were Develop detailed activity plans, which are based on 4 time horizons 8 Quarter, 12 Week, 6 Week and a 2 Week execution schedule. Each of which developed to an appropriate level detail ie Level 1,2,3 and 4 activity plans.
  • I worked closely with Functional managers and the wider team to create high quality plans which identify “Constrained Activities” which are then tested to meet specific planning “gate” criteria.
  • I facilitated integrated functional planning meetings between the offshore facilities, Luanda, Sunbury and third party support contractors to ensure readiness of activities.

Site Planner / May 2012 –May 2013
Gorgon LNG Project, Ulsan, South Korea
  • Production of project plans covering all aspects of the project from level 2 to detailed Level 4 schedules interfacing with the contractor to provide detailed schedules to track the project including reports for senior management and directors. Preparation and update the project schedule on a regular weekly basis or as/when required. Alert management and prepare recovery schedules if delay occurs.
  • Preparation and update progress S curves, Resource curves as well as assist in preparation of weekly and monthly reports. Schedule revise plan versus actual, backed up with area walk downs to determine what may need to be done and provide details thereof if/when required. Hold regular planning review meetings with supervision and management to enable transparency whilst looking to provide feasible solutions to any slippages or problems.
  • Detailed planning of all pre-fabrication, erection, testing and commissioning activities, making sure that construction and commissioning are working to the same priorities “Getting Everyone on the Same Page”. Production and assistance with access databases to assist/improve direction of the contractor to ensure correct priorities are working towards “Completions” signing of ITRs etc.
  • Part of a team that built a weekly updated Iso completion by test pack Navisworks model of the LNG Modules

Client Senior Planner / March 2011 –May 2012
Alcoa Australia, Pinjarra, WA, Australia
  • Client Project Planner/Scheduler for Alcoa Pinjarra Major Projects Team.
Duties include Planning Project from the Beginning as a client planner tracking all project deliverables from civil works through to commissioning and handover of areas, plant and equipment, focusing on all aspects of the projects lifecycle including tracking and scheduling of procurement of long lead items. Using Primavera P6.
  • Regular meetings with the Construction Manager, sub-contractors and Operations.
Workings closely with operations to ensure the plant shutdowns and tie ins are correctly aligned in schedule.
Site Planner (Various Roles) / July 2007 – Feb 2011
Downer EDI Engineering, Binningup, WA, Australia
  • Project Planner/Scheduler on the SSJV Desalination Plant Binningup. Using Primavera P6.
Duties involved Weekly updating the base line of the Mechanical & electrical schedule adding/Estimating variations using Primavera P6, producing S curves, Histograms for resources and field checks.
Downer EDI Engineering, Kwinana, WA, Australia
  • Worked as a Project Planner Scheduler on the TI West Pigment Plant in Kwinana.
Duties Include maintaining Site schedule, updating weekly progress using
Primavera P6, producing S curves, Histograms for resources and field checks.
Also estimate Site Instructions and Re Scoped items. Using Primavera P6.
Downer EDI Engineering, Brisbane, QLD, Australia
  • Working as a Estimator / Planner. Using Primavera P6.
Duties are sourcing tender and quotations from external suppliers.
Pricing using first principal estimating techniques, company Norms and Material take offs.
Producing tender Schedules from scope then entering estimated hours & resources using Primavera P6.
Downer Power, Condong/Broadwater, NSW, Australia
  • Worked on the Condong/ Broadwater Biomass generation project in NSW
Started as Boilermaker on the Construction but switched to Permit coordinator when Commissioning Started.
Duties included inducting people in the safety lock out Procedure writing up permits and locking out isolations (making Plant /Area safe to work in) updating personal lock register.
Fabricator/ Welder / 2005 – 2007
Argent Engineering, Hull, UK
  • Work was mainly Fab shop base but worked on 2 yearly shutdowns and many site installations.
  • Duties manly pipe fitting, welding (MIG) & (STICK) also the alterations and revisions of drawings (as built) for the final packages as/when required
Fabrication Apprentice / 2002 - 2005
PMC Engineering Various UK Sites
  • Fawley Southampton power station & Derby Rolls Royce
  • Start my first year apprenticeship in 2002.
  • Duties mainly fitting, welding (MMA & MIG) also tacking with (TIG) cutting and prepping pipe.
  • Working on stainless, carbon & Chromium Piping from site drawings and/or engineers/supervisors instructions. Installation and fabrication of steelwork, pipe supports and skid units.
  • Installation of plastic, HDPE and screwed piping on some projects.
JuniorEstimator / July 2001 – June 2002
P & D engineering, Hull, UK
  • Costing structural steel and buying material.
Junior Estimator / Sept 1999 – June 2001
TEI Construction Services, Hull, UK
  • Costing structural steel and buying material.

Education

David Lister High School / 1993 - 1998
  • MathsC
  • EnglishC
  • ScienceC
  • PE C
Hull ITEC / 1998 – 1999
Hull College / 2001 -2005

Skills

National Vocational Qualification Level 2 Information & Technology

City & Guilds of London 2D Auto Cad (Intermediate)
City & Guilds of London 2D Auto Cad (Advanced)
National Vocational Qualification Level 1,2,3 Fabrication & Welding
PRIMAVERA P3 PLANNING (3 Day)
PRIMAVERA P6 PLANNING 601
PRIMAVERA P6 PLANNING 602
PRIMAVERA RISK ANALYSIS (PERT MASTER)
Workplace Health and Safety Officer Training (Core Module)
MICROSOFT EXCEL INTERMEDIATE
MICROSOFT ACCESS BEGINNER

Interests

I have been involved with local Rugby league clubs as a coach for about 6 years

References

Ben Van Der Westen -Lead SMP Estimator
Downer EDI Engineering, Brisbane, QLD, Australia
Phone+61 (0)407595583

Andrew Burnett – TAR Planning Lead
BP Angola Exploration, London, UK
Phone

Johan Van Der Mere - Senior Planner
Hatch Engineering, Brisbane, QLD, Australia
Phone+61(0)427983190

Len Harris – Construction Manager
Alcoa Australia, Pinjarra, WA, Australia
Phone+61(0)431487758

Raju Lad – Project Controls Manager
Alcoa Australia, Pinjarra, WA, Australia
Phone+61(0)404800071

David Baas – Senior Planner Chevron Gorgon Project
Gorgon LNG Project, Ulsan, South Korea
Phone