Muhammad Asad Quantity Surveyor, Estimator

House# L-254, Sector 41/B, Korangi# 2-1/2Karachi, Pakistan / Phone # +92-333-3989412
Email:

SUMMARY:

Deadline driven and quality focused Civil Engineer with 10 years of experience in the field of construction management. Skilled communication and technical skills with expert leadership power, which helpsto maintainpositive relationships with clients.

TECHNICAL AND MANAGERIAL SKILLS:

  • In-depth knowledge ofall discipline drawings (Architectural, Structural, MEP),project specifications, BOQ and Standard Operating Procedures (SOPs)
  • Prepared Project baseline schedules, 2D shop drawings, coordinated with Civil, Electrical, Mechanical, HVAC and Builders work drawings.
  • Supervised and approved site construction activities
  • Trained, mentored and developed project team

SOFTWARE PROFICIENCY:

  • Skilled in Autodesk AutoCAD, CAD Measure, Quantity Takeoff,MS Word, MS Excel, MS PowerPoint, MS Project

CREDENTIALS:

  • Associate Engineer (DAE - Civil)
Jinnah Polytechnic Institute (Karachi) / Mar 2003- Jul 2006
  • S.S.C
Karachi Board, Pakistan / 2001

WORK EXPERIENCE:

ARABTEC CONSTRUCTION / Oct 2011 to date

Worked as Quantity Surveyor / Estimator

Major Projects:

THE AGA KHAN UNIVERSITY, KARACHI

Faculty of Arts and Sciences Phase 1

EMPORIUM MALL (NISHAT HOTEL AND MIXED USE DEVELOPMENT, TRADE& FINANCE CENTRE),NEAR EXPO CENTRE, M.A.JOHAR TOWN, LAHORE, PAKISTAN.

Finishing Works on Ground, First, Secondand Third Floor for Mall (Retails, Anchors,Restaurant, PlayZone, and Food Court etc.

KUWAIT UNIVERSITY, SABAH AL SALEM UNIVERSITY CITY, KUWAIT

College of Social Sciences (Men)

College of Social Sciences (Women)

College of Law (Men)

College of Law (Women)

College of Sharia (Men)

College of Sharia (Women)

Faculty Club

Prayer Area

al maabar, mixed use development, amman, jordan

Podium, Hotel Apartment, Branded Apartment

Nation Towers, International Capital Trading, ABU DHABI, UAE

Two skyscrapers, 5 star deluxe hotel and luxurious facility

King Abdul Aziz International Airport, KSA

King Abdulaziz International Airport (airport code JED) serves the city of Jeddah in Saudi Arabia

RAS AL HAMRA Development Project Phase-1, Oman

This phase consists of the construction of five (5) types of villas, four (4) types of townhouses and two (2) types of apartment buildings as part of town development in Oman. The project also encompasses the external development works consisting of landscaping.

Major Responsibilities:

  • Evaluated material quantity of structural works, architectural works, interior design, Landscape works and External envelope
  • Compared the quantities and cost of initial developed drawings and final revised issued for construction drawings and estimated total cost effect
  • Cost S-Curves (Showing baseline cost, actual spent and actual work done at site)
  • Extracted 2-D General arrangement and reinforced concrete shop drawings, material quantity and other associated details from virtual model
  • Prepare Bar Bending Schedules from Shop drawings
  • Selection and Negotiation with Sub Contractors
  • Rate analysis & Prepare Proposal for vendor’s

Ziauddin Ahmed & Co. (pvt) Limited / Jun 2010-Sep 2011

Worked as Quantity Surveyor;

Major Projects:

PNS Haider (Karachi)

Girls & Boys College & Hostel (Muzzafrabad). (Pakistan)

Teacher Hostel (Muzzafrabad). (Pakistan)

Major Responsibilities:

  • Take off Quantities for Submission tender.
  • Estimate & Rate analysis & Prepare Items other BOQ,s
  • Selection and Negotiation with Sub Contractors
  • Prepare the Contractor & Company Bills
  • Verification Bills with Clients & Venders
  • Procurement and arrangement ofrequired material
  • Prepare Bar Bending Schedules

Zishan Engineers (Pvt.) Ltd / Jan 2007-Jul 2009

Worked as Draughtsman / Quantity Surveyor;

Major Projects:

Bosicor Oil Pakistan Ltd.

Bosicor Petroleumrefinery

IFFCO Pakistan (Pvt.) Ltd

Edible oilrefinery IFFCO Pakistan

Major Responsibilities:

  • Developing layouts & section in (Structural, Architectural & Mechanical )
  • Prepare Bar bending Schedule
  • Takeout Quantities form drawings and comparing BOQ,s Quantities
  • Developing Steel Structure drawings

Tai Brothers Associates / Apr 2005-May 2006

Worked as Civil Draughtsman;

Major Projects:

Al-Rahim Textile Industries(Nooribad)

Mrs. Noshaba Nadeem Ban glows (Karachi)

Rajby Industries (Karachi)

Major Responsibilities:

  • Developing layoutssection in (Structural & Architectural)
  • Prepare Bar bending Schedule
  • Takeout Quantities form drawings and comparing BOQ,s Quantities

Abaseen construction company (Pvt.) Ltd / Aug 2003-Mar 2005

Worked as Surveyor / Assistant Quantity Surveyorsupervised construction activities

Major Projects:

Yousuf Textile Mills (Karachi)

TextileSpinning, Cotton, Polyester Mills

Artistic Milliners (Karachi)

Artistic Milliners, Premium Quality Denim Fabrics and Garments

Major Responsibilities:

  • Responsible for site execution works includingearth works, excavation, boring, steel fixing, shuttering and concreting. Also supervised finishing works including various tiled floors, vinyl floors, vinyl walls, metal lath and gypsum false ceiling
  • Monitored project progress and updated project status
  • Developed extra Work project activities.
  • Assigned daily man-hoursand developed other activities
  • Lay outingand Levelling for excavation, boring, steel fixing, shuttering and concreting all finishes.
  • Contractor & Company billing, bar bending Schedule, Cost estimate other works.

INTERNSHIPS:

  • Billing & Estimating course
AA construction company (Karachi) / Aug 2009-June 2010