Smith Douglas Homes

Community: ______Lot # ______

Name: ______Date: ______

Grading and Erosion Control

□  Post lot sign and permit board. Paint property lines on curb.

□  Is the building pad level?

□  Are the swales cut in and is the drainage in compliance with the HLP?

□  Is the C.O. pad and garage on the high side of the lot?

□  Is the silt fence and C.O. installed per the county and EPD requirements?

□  Is a compaction letter required? If the lot elevation has been changed in excess of 2’, a new compaction letter is required

□  Are there any obstructions with regard to driveway?

Slab Plumbing

□  Check for 1/8” per foot fall on all drain lines. Make sure drain lines are bedded in ground and partial covered with dirt.

□  Check for leaks - look for wet dirt

□  Ensure PVC sleeve is installed at main drain as it exits slab

□  Check that pipes are secured to metal stakes and are located in proper locations

□  Make sure there are no splices in the supply lines

□  Make sure the island conduit is installed in the correct location if it is required

□  Confirm the location of all pipes, i.e. kitchen, bath, and water heater

Foundation Box

□  Check the box dimensions and square

□  Confirm the garage side

□  Mark the form boards for any brick ledge

□  Confirm the patio locations and sizes. The front patio needs to be offset 4” to accommodate the columns

□  Have the forms checked by the surveying company to ensure the location of the home is in accordance with the HLP

□  Is the box within the set back and/or property lines?

Slab Prep

□  Footing dug square and free of debris and loose dirt. Rebar must be centered in footing and placed on chairs.

□  Grade beams and rebar installed per plan/details.

□  Turn up rebar ground in outside garage wall near electrical meter base location

□  Vapor barrier installed and wall straps/bolts on-site for installation during concrete pour

□  Ensure form boards are straight and properly braced

□  Double check slab dimensions, square, and patio dimensions and locations

□  Ensure slab is minimum 4” thick at all points

□  Check for positive slope 3” in 20’ on garage floor

Rough Framing

□  Confirm house elevation and all options

□  Check all walls for bowed studs. Pay close attention to the cabinet and shadow box areas.

□  Check TGI floor design drawing and ensure that no holes or notches are cut into the TGI’s

□  Check that all subfloor decking is glued, screwed, and nailed with ring shank nails

□  Mark all door sizes and swings and check rough opening size

□  Install temp. rails at all stairs and balconies

□  Ensure that each roof truss has a hurricane clip, is braced and is aligned with a stud below

□  Ensure that all OSB is gapped and plywood clips are utilized on the roof sheathing

□  Check that all non-load bearing walls are 24” O.C

□  Check kitchen cabinet walls are 16” O.C.

□  3 story basement framing to be 2x6 16” O.C.

□  Ensure all 6” walls are framed per plan

□  Check that hangers are installed at Pull Down Stairs

□  Mark all sink, toilet, tub, dishwasher, and water heater locations

□  Mark all elevation material changes

□  Check the rough opening sizes/locations of all doors, windows, and overhead garage doors

□  Ensure that T-Ply and insulation is installed behind tubs, showers, and any exterior wall area not accessible

□  Make sure all stairs have a min. 6’-8’ headroom.

□  Check all walls are square and plumb

□  Check all load bearing headers for #2 2x10’s and LVL’s per plan and nailed per design/code

□  Ensure that all roof and floor hangers are nailed properly and glued using subfloor adhesive

□  All sill plates should be secured with 3” screws or concrete straps/bolts as required by local building codes

□  Mark all sheetrock wrapped openings

□  Ensure all stairs are properly supported and moisture barrier installed if the stair contacts concrete

□  Check each truss for missing or damaged gusset plates

□  Ensure that the attic platform is raised 9” and decked with ¾” subflooring with a walkway to the attic stairs

□  Check for OSB in all chase tops

□  Ensure garage door framing is done per details and per local code requirements

□  Install tub studs at all showers and tub edges

□  Verify open rail and knee wall conditions and block as required

□  Mark all flooring change locations

□  Ensure that all loads are transferred to the slab/footing

□  Check that all overhangs are 12” and that they are properly supported

□  Ensure that chimney is built per code and has a 2x4 band at the top and cricket

□  Check that all sheathing is nailed per code

Exterior

□  Check elevation with contract/plans

□  All shutters and pediments installed

□  Damaged concrete

□  Trash in yard

□  Lids on sewer & water boxes & at grade

□  Cleanouts & valves located

□  Water meter box cleaned out

□  Mailbox – correct address, straight, loose

□  Yard drains properly – grade good throughout

□  Trees & bushes alive

□  Sod alive/dormant throughout

□  Drip edge complete

□  Gutters, downspouts & splash blocks

□  Garage door hardware

□  All penetrations sealed

□  All windows & doors silicone

□  Exterior doors sealed & weatherproof

□  Hose bibs secure, sealed & working (summer)

□  Gas line painted

□  Exterior drains-elbows & extensions

□  Ground block wired and attached

□  Outlets covered & GFI protected

□  Outside light fixtures & bulbs

□  All gas valves on-meter & fireplace

□  All windows clean-no stickers

□  T-hold supports installed and secure

□  Siding intact-no damage

□  Screens on windows

□  Screens & flaps on all vents (dryer-flap only)

□  Porch columns & trim acceptable

□  Doorbell secure & operates

□  Trash on roof-shingles good

Garage

□  Emergency #s/paint label correct & in place

□  Breakers labeled

□  Phone/TV wires

□  UFER labeled

□  Cut-offs labeled

□  Seal all penetrations

□  Garage door closes easily, secure, locks

□  Disable lock if have opener

□  Bulbs in openers

□  T-hold support as needed, painted

Interior

□  Check for bowed walls

□  Confirm light fixtures per contract

□  Confirm plumbing fixtures per contract

□  Confirm appliances per contract

□  Confirm blinds per contract

□  Open/close all windows – check all latches

□  Check all doors latch securely, locks work

□  All hinge screws in place

□  Excessive play in closed doors or too tight/rub

□  Check all doors for bumps, spring & hinge

□  Check all lights – bulbs & operation

□  Locate all phone & TV jacks – per contract?

□  Test smokes – confirm CO2 in correct location

□  Check HVAC grills – operation, all screws, level, bent fins, clean

□  Check fireplace for damage, operation, open & close flue

□  Check t-stat operation-heat/AC/fan

□  Check handrails for loose, final coat of poly

□  Check pickets for loose/rattle & shoes

□  Paint top of doors & trim

□  Tug on all shelves, level

Kitchen

□  Confirm hot & cold water, good flow, stoppers work

□  Check for leaks

□  Check GFIs

□  Run ALL appliances - DW, oven, disposal, ice maker, micro

□  Check range for anti-tip

□  Set appliance clocks

□  All warranty & instruction paperwork in drawer. Remove unnecessary items.

□  Bulbs in all appropriate appliances

□  Seal holes under sink & behind range and Dishwasher

□  All cab doors, hinges & knobs tight, close flush

□  All cab drawers – close fully & flush, don’t rub

□  Grout/caulk intact at tops/splashes

Baths

□  Confirm hot & cold water – sinks, showers & tubs

□  Good flow, stoppers work, aerators clean

□  Check for leaks

□  Confirm no chips/cracks in tubs, shower, sinks

□  Flush toilets, valves adjusted, clean

□  All cab doors, hinges & knobs tight

□  All cab drawers – close fully, don’t rub

□  Grout/caulk intact at tops/splashes, tubs, shower

□  Check GFIs

□  Check exhaust fans

Laundry

□  Washer pan drain sealed & tight

□  Washer drain cap removed

□  Confirm 4 prong dryer plug

Attic

□  Clean filter – check for easy access

□  Clean platform

□  Clean HVAC pan

□  Check pan drain/float switch

□  Condensate line drains

□  Gas & electric to furnace on

□  Voids in insulation – proper depth

□  Insulation certificate posted – depth rulers in place

□  Foam around Pull Down Stairs

ALL QA ITEMS ARE COMPLETE AND THE HOME IS READY FOR THE HOO:

______

Builder

______

Sales Agent

______

Smith Douglas Builder/Superintendent Date