Example of Area Schedule

Functional Area Schedule
Project:
Design Stage:
Department: Operating Department
Room/Space / No. / Area Each
m2 / Useable Floor Area
m2
Staff Base
Interview
Pre-Op Hold
Male Change
Female Change
Porters Base
Supervisors Office
Surgeons Rooms
Anaesthetists Room
Scrub Up
Anaesthetic Room
Theatre
Exit Bay
Set Up / Sterile Store
Clean Up
Recovery
Nurse Station
Clean Supply
Soiled Utility
Equipment Store
Anaesthetic Work Room
General Store
Pharmacy
Cleaner
Staff Room / 1
1
1
1
1
1
1
1
1
4
4
4
4
1
1
1
1
1
1
1
1
1
1
1
1 / 20
8
30
54
70
9
9
8
12
7
18
36
8
75
40
80
6
6
6
20
20
15
15
10
26 / 20
8
30
54
70
9
9
8
12
28
72
144
32
75
40
80
6
6
6
20
20
15
15
10
26
SUB TOTAL / 815
Department Circulation (25.89% of UFA) / 211
Non-Habitable Area (7.08% of UFA) / 58
To Summary - Gross Department Area / 1,084
Building Area Schedule
Project:
Design Stage:
SUMMARY
Department / Gross Dept. Area
m2
Stores and Printing
Linen
Intensive Care Unit
Day Ward
CSSD
Operating Department
Catering
Loading Area
Dining
Pathology
Paramedical
In-Patient Accommodation
Public Amenities / 455
290
424
210
332
1,084
668
53
338
700
600
1,537
121
Gross Department Area / 6,812
Environmental Support Areas
UFA
Non-Habitable
Ducts / 614
34
200
Total (12.45% of GDA) / 848
Building Travel
UFA / 1,161
61
Total (17.94% of GDA) / 1,222
FULLY ENCLOSED COVERED AREA / 8,882
ATTACHED WALKWAY BETWEEN DAY WARD & IN-PATIENT ACCOM. / 118
TOTAL / 9,000
Area Schedule Reconciliation
Project:
Reconciliation of Areas
Department / Agreed Brief Area / Schematic Area / Contract Doc. Area
Accident Emergency
Medical Imaging
Physiotherapy/OPD
Delivery Suite
Library / 1,118
1,098
2,150
230
608 / 1,215
1,202
2,173
237
762 / 1,222
1,169
2,181
230
772
Gross Department Area / 5,204 / 5,589 / 5,574
Department Circulation
Environmental Support / 298 (5.72%)
90 (1.73%) / 320 (5.72%)
97 (1.73%) / 399 (7.15%)
234 (4.19%)
Fully Enclosed Covered Area / 5,592 / 6,006 / 6,207


To be submitted with cost reconciliation.

Explanatory Notes

The project objective is for the design to be within the “Agreed Brief Area” and detailed justifications would be required before the above example could be accepted by the Department.

COST PLAN COMPILED ON A FUNCTIONAL BASIS
Function / Shell 01, 02, 03, 05, 06, 07, 08 / Stairs 04 / Partit. 09, 10 / Doors 11 / Finishes 12, 13, 14 / Fitments 15, 16 / Plumbing 17, 18, 19 / Services 20 - 29 / Building Cost (BC)
m2 / $K / $K / $K / $K / $K / $K / $K / $K / $/m2 / $Total K / $/m2
Acute Wards
Operating Theatres >4
Central Sterile Supply
Outpatient Consultant Clinic
Medical Records
Physiotherapy
Pharmacy
General Administration
Psychiatric
Catering (Kitchen)
Stores (Linen)
Child Minding
Staff Change
Plant Room
Main Corridor / Street
UCA
Lifts / 2,520
776
391
443
334
739
335
740
60
718
13
210
273
1,060
1,127
63
- / 1,392.3
428.7
216.0
244.8
184.5
408.3
185.1
408.9
33.2
396.7
7.2
116.0
150.8
585.6
622.7
34.8
- / -
-
-
-
-
-
-
-
-
-
-
-
-
-
151.5
-
- / 241.8
66.4
31.3
39.8
28.5
66.5
1.0
80.0
5.7
57.5
0.4
18.0
28.8
26.0
-
-
- / 163.6
54.3
24.5
28.8
16.0
48.0
21.6
51.0
3.5
48.0
0.4
4.2
21.3
40.0
-
-
- / 550.0
180.5
94.5
97.4
65.1
162.6
76.0
152.8
13.0
179.5
1.6
42.0
68.0
85.0
293.0
3.2
- / 618.9
57.5
155.5
42.0
22.0
82.0
92.0
58.0
7.0
390.9
-
2.0
22.0
4.0
8.0
-
- / 345.8
72.0
48.7
51.5
-
67.0
18.2
26.5
30.0
101.4
-
-
181.3
2.0
-
-
- / 2,342.0
767.8
279.0
186.5
125.5
278.0
137.0
313.0
20.0
585.6
2.7
79.0
105.5
210.5
313.6
4.6
359.6 / 929.37
989.43
713.55
420.99
375.75
376.18
408.96
422.97
333.33
815.60
207.69
376.19
386.45
198.58
278.26
73.02
- / 5,654.4
1,627.2
849.5
690.8
441.6
1,112.4
560.9
1,090.2
112.4
1,759.6
12.3
261.2
577.7
953.1
1,388.8
42.6
359.6 / 2,243.81
2,096.91
2172.63
1,559.37
1,322.16
1,505.28
1,674.33
1,473.24
1,873.33
2,450.70
946.15
1,243.81
2,116.12
899.15
1,232.30
676.19
-
TOTAL / 9,802 / 5,415.6 / 151.5 / 721.7 / 525.2 / 2,064.2 / 1,561.8 / 944.4 / 6,109.9 / 623.33 / 17,494.3 / 1,784.77

NOTE: Consultants are requested to adhere to the HDS function listings in this document.