Contents Pages
Gent Fairhead & Co Limited
Environmental Permit Application Documents Ref No EPR/FP3335YU/A001
How to find Documents
The following represent all documents that were submitted to the Environment Agency by Gent Fairhead & Co Limited during its application for an Environmental Permit. During the public consultation period a number of queries were raised and answered. As a result, some key documents were inevitably superseded. Where appropriate, in the Contents Pages we have added “superseded” and given the next date of submission of that document. The final version of each document, as agreed with the Environment Agency in reaching its ‘minded to’ decision, is generally that with the highest version “v” number. For the key documents, most of these were updated on 26 May 2017.
EP Application submitted 3 March 2017
OPRA v1
Part A
Part B2
Part B3
Part F1
S1552-0720-0003JRS Supporting Information v5 final
S1552-0720-0009JRS Non Technical Summary v5 final
Annex 1 Drawings
1552-007-R3
1552-008-R4 – superseded 13 June 2016
213033-109A Secondary Containment Areas
213033-130E Building Elevations
C22.1_142064-DC-GA-C-108G Drainage Layout 1 of 2
C22.2_142064-DC-GA-C-109G Drainage Layout 2 of 2
CHP Plant Sankey diagram v6
FIG 1-9A Simplified Process Flow
FIG 1-10A Integrated Process Flow (1)
Firing diagram for Section 73 update Rev1
Pulp Plant Process Schematic 06Feb14
Rivenhall CHP Plant Schematic
Site Location Plan
Water Flow Schematic v5
Annex 2 - Site Condition Report
S1552-0720-0002JRS Site Condition Report v4
Appendix A
A5 - [A] Land Use & Contaminated Land - Final V.3
A5 - C25.1 Contaminated Land Statement
A5 - C25.2 Appendix A - Former Airfield Site Plan & Schedule of Building...
A5 - C25.3 Appendix B - C4237_14-59380-1_A.XLS
A5 - C25.4 Dwg 213033-150= As-Built Borehole Locations
Appendix B
B6.1 - [B] Surface Water and Flood Risk - Final V.2
B6.2 - [B] Hydrogeology & Groundwater - Final V.2
B6.3 - C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2
B6.3 - C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2
B6.3 - C23.3_142064-DC-GA-C-111A Drainage Construction Details
B6.4 - C24.2_213033-SOD-24 Proposed IWMF Groundwater Borehole Monitoring...
B6.4 - C24.3_DWg 6-4 Groundwater Monitoring Points
B6.4 - C24.4_Dwg 13 GROUNDWATER MONITORING POINTS
B6.4 - C24.5_Dwg 213033-150= As-Built Borehole Locations
B6.4 - C24.6_Appendix A - Groundwater Monitoring-CC Ground Investigation...
B6.4 - C24.7_Key to Exploratory Logs & Rotary Borehole Logs for BH10, 11...
B6.4 - C24.8_142064-DC-GA-C-111A Drainage Construction Details
B6.4 - emails Honace_ Application ESS-34-15-BTE Land at Rivenhall Airfie...
Appendix C
07514690074.510_B.0 Ground Investigation Report
Appendix D
C4237 - Factual Report
Annex 3 - Noise Assessment
B3749 20170227 Cadna Data– superseded 26 May 2017
B3749 20170227 EP R (F) – superseded 26 May 2017
Annex 4 - Environmental Risk Assessment
S1552-0720-0006JRS Environmental Risk Assessment v3 final
H1v2_72 – Consultation
Annex 5 - Air Quality Assessments
S1552-0700-0010RSF Human Health Risk Assessment_v6 – superseded 26 May 2017
S1552-0700-0011RSF Dispersion Modelling Assessessment_v6 – superseded 26 May 2017
S1552-0700-0012RSF Abnormal Emissions Assessment_v5 – superseded 26 May 2017
S1552-0720-0008JRS Greenhouse Gas Assessment v3 clean
S1552-0730-0004JRS Bioaerosol Risk Assessment v5
Annex 6 - BAT Assessment
S1552-0720-0007JRS BAT Assessment v5 final - superseded 12 May 2017
Annex 7 - Odour Management Plan
S1552-0720-0005TMK Rivenhall IWMF Odour Management v6 – superseded 12 May 2017
Annex 8 - Pest Management Plan
S1552-0730-0002EH Pest Management Plan v3 Final
Annex 9 – COTC
AD Qualification_Guil Steyn COTC Certificate 2015
AD Qualification_Ricky Maylin COTC 4MBTAD6
Annex 10 - Fire Prevention Plan
S1552-0730-0003JRS Fire Prevention Plan v6 final – superseded 13 April 2017
Appendix A - Plans and drawings
1552-009-X1 – superseded 13 April 2017
213033-100P Site Layout
213033-109A Secondary Containment Areas
C23.1_142064-DC-GA-C-108G Drainage Layout 1 of 2
C23.2_142064-DC-GA-C-109G Drainage Layout 2 of 2
FIG 1-1A Land Ownership and Proposed Site Plan
Rivenhall Receptors
Appendix C - Fire Strategy
Fire Strategy Issue 6
Annex 11 - Summary EMS documentation
Draft EMS Manual_GFC_April 2016_v1RK070416
GFC Structure_RK EMS 160216 v2 JRS
Annex 12 - Stack Height Jusitification
S1552-0720-0012JRS Stack Height Justification v3 final – superseded 13 April 2017
Modelling files
AQA
HHRA
Noise
Clarification #1 submitted 4 April 2017
S1552-0710-0108JRS EA Clarifications #1 v2 final
Appendix A - 213033-109A Secondary Containment Areas
Clarification #2 submitted 31 March 2017
S1552-0710-0110JRS Clarification #2
Clarification #3 submitted 13 April 2017
Rivenhall_stack_sketch_20.8.2015
S1552-0710-0116JRS Clarification #3 v2 final
S1552-0720-0012JRS Stack Height Justification v4 – superseded 12 May 2017
S1552-0730-0003JRS Fire Prevention Plan v7 final
Annex 10 - Fire Prevention Plan - Clarification #3
S1552-0730-0003JRS Fire Prevention Plan v7 final
Appendix A - Plans & drawings
1552-009-R2 – superseded 26 May 2017
1552-010-R1
1552-011-R1
1552-012-R1
213033-100P Site Layout
213033-109A Secondary Containment Areas
C23.1_142064-DC-GA-C-108G Drainage Layout 1 of 2
C23.2_142064-DC-GA-C-109G Drainage Layout 2 of 2
FIG 1-1A Land Ownership and Proposed Site Plan
Rivenhall Receptors
Appendix C - Fire Strategy
Fire Strategy Issue 6
Schedule 5 Response submitted 12 May 2017
S1552-0730-0006JRS Schedule 5 Response #1 v3 final
Appendix A
S1552-0700-0008RSF CHP Management Plan for Plume Abatement_120517
Appendistac x B
C22.1_142064-DC-GA-C-108G Drainage Layout 1 of 2
C22.2_142064-DC-GA-C-109G Drainage Layout 2 of 2
Appendix C
S1552-0720-0012JRS Stack Height Justification v7 – superseded 26 May 2017
Stack Height Justification calculations revised v4
Appendix D
S1552-0720-0007JRS BAT Assessment v7 final –superseded 26 May 2017
Appendix E
S1552-0720-0005TMK Rivenhall IWMF Odour Management v7 -
Appendix F
1552-013-R1
Appendix G
CHPQA Submission for Form F3 6751A
S1552-0600-0074NDC CHPQA and GN44 Certificate – Letter
Appendix H
CHP Plant Sankey diagram v6
Rivenhall Energy Flow Diagram v2
58m Stack Height Docs (Clarifications #4 & #5) submitted 26 May 2017
S1552-0710-0133JRS Cover letter for stack height submissions - Letter v2
S1552-0700-0010RSF Human Health Risk Assessment_v8
S1552-0700-0011RSF Dispersion Modelling Assessessment_v8
S1552-0720-0007JRS BAT Assessment v9 final
S1552-0720-0012JRS Stack Height Justification v9 clean
Clarification 4
Appeal Decision 3146968_SilverEnd
S1552-0700-0012RSF Abnormal Emissions Assessment_v7
S1552-0700-0013RSF Plume Visibility Analysis_120517
S1552-0710-0116JRS Clarification #4 v5 final
Clarification 5
1552-009-R3
S1552-0010-3434JRS Clarification response #5 - FPP v2
Noise assessment
B3749 20170315 Lw Data
B3749 20170524 Cadna Data
B3749 20170524 EP R (F)
B3749 20170524 Subsequent measurements
Modelling files
AQA
HHRA
Noise
Clarification #6 submitted 13 June 2017
1552-008-R7
S1552-0710-0143SMO Clarification #6 v3