Contents Pages

Gent Fairhead & Co Limited

Environmental Permit Application Documents Ref No EPR/FP3335YU/A001

How to find Documents

The following represent all documents that were submitted to the Environment Agency by Gent Fairhead & Co Limited during its application for an Environmental Permit. During the public consultation period a number of queries were raised and answered. As a result, some key documents were inevitably superseded. Where appropriate, in the Contents Pages we have added “superseded” and given the next date of submission of that document. The final version of each document, as agreed with the Environment Agency in reaching its ‘minded to’ decision, is generally that with the highest version “v” number. For the key documents, most of these were updated on 26 May 2017.

EP Application submitted 3 March 2017

OPRA v1

Part A

Part B2

Part B3

Part F1

S1552-0720-0003JRS Supporting Information v5 final

S1552-0720-0009JRS Non Technical Summary v5 final

Annex 1 Drawings

1552-007-R3

1552-008-R4 – superseded 13 June 2016

213033-109A Secondary Containment Areas

213033-130E Building Elevations

C22.1_142064-DC-GA-C-108G Drainage Layout 1 of 2

C22.2_142064-DC-GA-C-109G Drainage Layout 2 of 2

CHP Plant Sankey diagram v6

FIG 1-9A Simplified Process Flow

FIG 1-10A Integrated Process Flow (1)

Firing diagram for Section 73 update Rev1

Pulp Plant Process Schematic 06Feb14

Rivenhall CHP Plant Schematic

Site Location Plan

Water Flow Schematic v5

Annex 2 - Site Condition Report

S1552-0720-0002JRS Site Condition Report v4

Appendix A

A5 - [A] Land Use & Contaminated Land - Final V.3

A5 - C25.1 Contaminated Land Statement

A5 - C25.2 Appendix A - Former Airfield Site Plan & Schedule of Building...

A5 - C25.3 Appendix B - C4237_14-59380-1_A.XLS

A5 - C25.4 Dwg 213033-150= As-Built Borehole Locations

Appendix B

B6.1 - [B] Surface Water and Flood Risk - Final V.2

B6.2 - [B] Hydrogeology & Groundwater - Final V.2

B6.3 - C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2

B6.3 - C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2

B6.3 - C23.3_142064-DC-GA-C-111A Drainage Construction Details

B6.4 - C24.2_213033-SOD-24 Proposed IWMF Groundwater Borehole Monitoring...

B6.4 - C24.3_DWg 6-4 Groundwater Monitoring Points

B6.4 - C24.4_Dwg 13 GROUNDWATER MONITORING POINTS

B6.4 - C24.5_Dwg 213033-150= As-Built Borehole Locations

B6.4 - C24.6_Appendix A - Groundwater Monitoring-CC Ground Investigation...

B6.4 - C24.7_Key to Exploratory Logs & Rotary Borehole Logs for BH10, 11...

B6.4 - C24.8_142064-DC-GA-C-111A Drainage Construction Details

B6.4 - emails Honace_ Application ESS-34-15-BTE Land at Rivenhall Airfie...

Appendix C

07514690074.510_B.0 Ground Investigation Report

Appendix D

C4237 - Factual Report

Annex 3 - Noise Assessment

B3749 20170227 Cadna Data– superseded 26 May 2017

B3749 20170227 EP R (F) – superseded 26 May 2017

Annex 4 - Environmental Risk Assessment

S1552-0720-0006JRS Environmental Risk Assessment v3 final

H1v2_72 – Consultation

Annex 5 - Air Quality Assessments

S1552-0700-0010RSF Human Health Risk Assessment_v6 – superseded 26 May 2017

S1552-0700-0011RSF Dispersion Modelling Assessessment_v6 – superseded 26 May 2017

S1552-0700-0012RSF Abnormal Emissions Assessment_v5 – superseded 26 May 2017

S1552-0720-0008JRS Greenhouse Gas Assessment v3 clean

S1552-0730-0004JRS Bioaerosol Risk Assessment v5

Annex 6 - BAT Assessment

S1552-0720-0007JRS BAT Assessment v5 final - superseded 12 May 2017

Annex 7 - Odour Management Plan

S1552-0720-0005TMK Rivenhall IWMF Odour Management v6 – superseded 12 May 2017

Annex 8 - Pest Management Plan

S1552-0730-0002EH Pest Management Plan v3 Final

Annex 9 – COTC

AD Qualification_Guil Steyn COTC Certificate 2015

AD Qualification_Ricky Maylin COTC 4MBTAD6

Annex 10 - Fire Prevention Plan

S1552-0730-0003JRS Fire Prevention Plan v6 final – superseded 13 April 2017

Appendix A - Plans and drawings

1552-009-X1 – superseded 13 April 2017

213033-100P Site Layout

213033-109A Secondary Containment Areas

C23.1_142064-DC-GA-C-108G Drainage Layout 1 of 2

C23.2_142064-DC-GA-C-109G Drainage Layout 2 of 2

FIG 1-1A Land Ownership and Proposed Site Plan

Rivenhall Receptors

Appendix C - Fire Strategy

Fire Strategy Issue 6

Annex 11 - Summary EMS documentation

Draft EMS Manual_GFC_April 2016_v1RK070416

GFC Structure_RK EMS 160216 v2 JRS

Annex 12 - Stack Height Jusitification

S1552-0720-0012JRS Stack Height Justification v3 final – superseded 13 April 2017

Modelling files

AQA

HHRA

Noise

Clarification #1 submitted 4 April 2017

S1552-0710-0108JRS EA Clarifications #1 v2 final

Appendix A - 213033-109A Secondary Containment Areas

Clarification #2 submitted 31 March 2017

S1552-0710-0110JRS Clarification #2

Clarification #3 submitted 13 April 2017

Rivenhall_stack_sketch_20.8.2015

S1552-0710-0116JRS Clarification #3 v2 final

S1552-0720-0012JRS Stack Height Justification v4 – superseded 12 May 2017

S1552-0730-0003JRS Fire Prevention Plan v7 final

Annex 10 - Fire Prevention Plan - Clarification #3

S1552-0730-0003JRS Fire Prevention Plan v7 final

Appendix A - Plans & drawings

1552-009-R2 – superseded 26 May 2017

1552-010-R1

1552-011-R1

1552-012-R1

213033-100P Site Layout

213033-109A Secondary Containment Areas

C23.1_142064-DC-GA-C-108G Drainage Layout 1 of 2

C23.2_142064-DC-GA-C-109G Drainage Layout 2 of 2

FIG 1-1A Land Ownership and Proposed Site Plan

Rivenhall Receptors

Appendix C - Fire Strategy

Fire Strategy Issue 6

Schedule 5 Response submitted 12 May 2017

S1552-0730-0006JRS Schedule 5 Response #1 v3 final

Appendix A

S1552-0700-0008RSF CHP Management Plan for Plume Abatement_120517

Appendistac x B

C22.1_142064-DC-GA-C-108G Drainage Layout 1 of 2

C22.2_142064-DC-GA-C-109G Drainage Layout 2 of 2

Appendix C

S1552-0720-0012JRS Stack Height Justification v7 – superseded 26 May 2017

Stack Height Justification calculations revised v4

Appendix D

S1552-0720-0007JRS BAT Assessment v7 final –superseded 26 May 2017

Appendix E

S1552-0720-0005TMK Rivenhall IWMF Odour Management v7 -

Appendix F

1552-013-R1

Appendix G

CHPQA Submission for Form F3 6751A

S1552-0600-0074NDC CHPQA and GN44 Certificate – Letter

Appendix H

CHP Plant Sankey diagram v6

Rivenhall Energy Flow Diagram v2

58m Stack Height Docs (Clarifications #4 & #5) submitted 26 May 2017

S1552-0710-0133JRS Cover letter for stack height submissions - Letter v2

S1552-0700-0010RSF Human Health Risk Assessment_v8

S1552-0700-0011RSF Dispersion Modelling Assessessment_v8

S1552-0720-0007JRS BAT Assessment v9 final

S1552-0720-0012JRS Stack Height Justification v9 clean

Clarification 4

Appeal Decision 3146968_SilverEnd

S1552-0700-0012RSF Abnormal Emissions Assessment_v7

S1552-0700-0013RSF Plume Visibility Analysis_120517

S1552-0710-0116JRS Clarification #4 v5 final

Clarification 5

1552-009-R3

S1552-0010-3434JRS Clarification response #5 - FPP v2

Noise assessment

B3749 20170315 Lw Data

B3749 20170524 Cadna Data

B3749 20170524 EP R (F)

B3749 20170524 Subsequent measurements

Modelling files

AQA

HHRA

Noise

Clarification #6 submitted 13 June 2017

1552-008-R7

S1552-0710-0143SMO Clarification #6 v3