Irlam & Cadishead Highways Sub Group Meeting
Held on Monday 18 February 2008 in Irlam Council Offices
In attendance :Cllr Lightup / Cllr Kean / Cllr Hunt / Trupti Patel / Nancy Heap / Ursula Sossalla-Iredale (Chair) /
Chris Trueblood (Minutes)
Apologies received:Cllr Mann / Cllr Hill / Terry Handsley / Christine Hudson / Karen Lucas
(1) Schemes considered and agreed under the Highways Devolved budget (06/07 £100k – 07/08 £100k)Ref / Location / Scheme / Action / Update
(a) / Fairhills Road / Liverpool Road / Pedestrian crossing traffic signals
- Scheme now completed
- Outstanding work – uneven pavement on Roscoe Road
- Rotating cone to be updated soon
(b) / Ferryhill Road / Pedestrian refuge
- Work has not commenced yet
© / The De Traffords /
- Scheme is completed
- Cut nook Lane / Moorfield Road junction-– there is concern for the junction layout as people coming out from the side road find it difficult to enter the main road.
Social Club / Paul Anderton (Urban Vision) to investigate what mothod of control can be implemented at this junction and issue design brief .
(d) / Dudley Road, Cadishead /
- Housing currently own the land
- No action has been taken, although complaints have been received regarding the grass verge
(e) / Moorfield Parade
Private service road. /
- Traffic Regulation Order (TRO) to be placed for a one-way system and limited waiting for 1-hour , no return within 1 hour to be introduced in Moorefield Parade.
and report back on approximate costing /
- Trupti has contacted Mr Hamer with an estimated cost. The total scheme cost is approximately, £7000.
Funding from devolved budget can not be used to implement schemes as this is a private road.
(2)New Schemes: Maintaining the asset fund (07/08 £10k)
(f) / Addison Road / Grass verge requires attention due to flooding and water drainage / Trupti Patel to liase with Mrs Bailey
(g) / Turner Avenue / Railings / Trupti Patel to liase with Lynn Hulme. Scheme requires costing with full estimates
(h) / Scrutiny / Report implications
- Tarmac for potholes
- Street name plates eg Locklands Lane opposite Irlam Community Centre
- Yellow line markings at Prince’s Park Garden Centre
(3) Other considerations
(i) / Peel Green Roundabout / Clarify plans for traffic schemes at Salford Reds Stadium
(j) / A57 Liverpool Road Strategy / Clarification is needed
Main issues:
- Freight use on Liverpool Road
- Brinnell Road traffic lights are needed to regulate right turning movements of large vehicles onto Liverpool Road.
(4) Highway Investment Works
(k) / Works planned for 2007/08 / Carriageways
- Riverside Avenue
- Cromwell Road
- Moss Lane
- Boat Lane
- Ferryhill Road
- Ferry Road
- Leader Williams Road
- Rose Crescent
(l)` / Works planned for 2008/09 / Carriageways
- Royle AvenueLyndhurst AvenueSandy Lane
- Lyndon RoadProspect RoadCutnook Lane
- Langford DriveLancaster RoadSilver Street
- Platts DriveSilverdale AvenueSpringfield Lane
- School LaneMerlin Road
(5) Block 3 schemes
(m) / Liverpool Road, Cadishead / Resurfacing (£210k) / Trupti Patel to report on progress of schemes
(n) / A57 (Boysnope, Barton Moss Road) / Resurfacing (£200k) / Trupti Patel to report on progress of schemes
1
7.3.08