SUPPLIER QUALITY MATERIAL REPORT (SQMR)
This form is to be used when requesting acceptance byL-3 Combat Propulsions System (L-3CPS) of material containing minor non-conformances that are not capable of rework to specification configuration. The request will be processed by the Supplier Quality Assurance (SQA) Dept to obtain the necessary approvals allowing shipment of the described hardware with the defined discrepancy.Please fill out form completely and email to your L-3 CPS SQA commodity lead, commodity buyer agent and
cc:
PRODUCT AS DESCRIBED BELOW IS NOT TO BE SHIPPED UNTIL AUTHORIZATION IS RECEIVED FROM L-3 CPS SQA / DATE SUBMITTED:
PRODUCT AS DESCRIBED BELOW IS NOT TO BE SHIPPED UNTIL AUTHORIZATION IS RECEIVED FROM L-3 CPS SQA
SUPPLIER: ______
P.O. NUMBER: ______
CONTACT: ______
EMAIL: ______/ VCN NO: ______
L-3 CPS BUYER: ______
PHONE NO.: ______/ PART NO:______
SPECIFICATION REQUIREMENT:
DEVIATION FROM SPECIFICATION:
ROOT CAUSE:
CORRECTIVE ACTION:
Short Term:
Long Term:
Note: If long term corrective action requires a Technical Data Package Change the Material Problem Report Number must be attained from the Buyer and included in long term action.
NUMBER OF PARTS DISCREPANT: / DISCREPANT SERIAL NUMBERS:
NUMBER OF SHIPMENTS WHICH WILL CONTAIN DISCREPANCY:
BEGINNING DATE: / ENDING DATE:
USE ATTACHMENTS IF NECESSARY
ALLOW 2 WEEKS FOR PROCESSING
SQMR FORMINSTRUCTIONS FOR COMPLETING
- SUPPLIER
- VCN NO.
- PART NO.
- P.O. NUMBER
- L-3 BUYER
- CONTACT
- PHONE NO.
- E-MAIL ADDRESS
- SPECIFICATION REQUIREMENT
If more than one use alpha designators
- DEVIATION FROM SPECIFICATION
- ROOT CAUSE
- CORRECTIVE ACTION
Long Term Describe the systemic closed loop correction (include implementation dates) associated with each designator. Note: If long term corrective action requires a Technical Data Package Change the Material Problem Report Number must be attained from the Buyer and included in long term action.
- QUANTITY OF PARTS DISCREPANT
- SERIAL NOS OF DISCREPANT PARTS
- NUMBER OF SHIPMENTS WHICH
WILL CONTAIN DISCREPANCY
- BEGINNING DATE
- ENDING DATE
NOTE: If approved for shipment, discrepant material must be shipped as its own lot and not co-mingled with conforming material.
FORM NO. 668-4-1 Page 1 of 2