1.1General

1.2Scope

Materials listed below to be supplied andinstalled

toallareasdetailedondrawings,orotherwisequantified.

1.3Qualifications

Installation shall comply with the relevant building codesusingapprovedfixingsandtheworkexecuted by competenttradesmen.

1.4Storage ofMaterials

All materials delivered to site shall be stored flatin

an enclosed shelter, providing protection from damage andexposuretotheelements.Damagedordeteriorated material shall be immediately removed fromsite.

2.1Product

2.2Panels Alternative1

Ceilings/walls*shallbeAu.diLux/Au.diLuxIAB*perforated fibre cement sheeting by Atkar, telephone 03 97963333. Panels shall be Atkar Product type …… and ……mm thick with square/ recessed edges,* allowing a nominal……mm unperforated margin to the sheet perimeter(optional).

2.3Insulation Alternative1

PanelsshallbesuppliedwithAtkarIntegratedAcoustic backing(IAB).

2.2Insulation Alternative2

Panels shall be installed with .……type and thickness backing insulation at the rear of each panel. Insulating materials to be laid across ……mm battens with fabric facingtensionedoverbattenstocreatea……mmdeep air gap/installed with insulation fitted between support membersandfabricfacingfittedoverentiresurfacearea*carefully installed to avoidcreasing.

2.3Execution

Wall studs, ceiling battens or furring channels shall be spacedat……mmcentresandpanelslaidatrightangles tothesemembers.Doublefurringchannelsorbattens

to be provided at sheet end joints for ceilingapplications.

Panelstobefixedwith……x……mmsize……type offastenerat……mmfixingcentresaroundperimeter ofpanelandat……mmfixingcentreswithinthebody

ofthepanel.Panelsshallbebuttedtogetherandinstalled tocreate……mmexpressedjoint/jointscovered

witha……x……mmsize……typetimbercoverstrip/ fitted into appropriately sized H-mould sheet holders/ joints taped, and flush jointed in accordance with manufacturer’s publishedspecifications.*

2.3 Completion

Upon completion of the installation, check that allpanels andcovermoulds(ifapplicable)aresecurelyfastened

to their framing members and all fixings are properly stoppedwithanapprovedfiller.Surfacetobeprepared toanapprovedstandardinreadinesstoreceivesurface treatment applied byothers.