BIO-DATA

Name: JAMSHAID ALAM

Permanent Address:

Home 183

Ward no: 13, Majullah Nagar,

Town: Kemri,

City: Rampur-244921

State: Uttar Pradesh.

Country: India

Date of Birth: 10 February 1984.

Contact On:

Passport No: H-3504763

Current location: working on Nigeria Project

Designation:HDD Specialist,Drilling Fluids Engineer,Mud Engineer, Geologists, Geotech Drilling Engineer,Horizontal Directional Drilling Specialist.

E-mail:

TOTAL EXPREREINCE: 8Yearsand 3 months

Key Skill:HDD(Horizontall directional drilling) Specialist, Oil & GasUnderground Pipeline distribution Expert, Drilling Fluids Engineer,Mud Engineer, Mud logging, Solid waste Control engineer, Offshore & Onshore Drilling Engineer , Geological Engineer,Geologists,Geotechnical engineer, Microtunneling Engineer, Shaft & Tunnel Engineer, Bore hole specialists, Rig Supervisor/Rig Superintendent.

CAREER OBJECTIVE: Expertisation in Drilling Industry,

To dive the Geological knowledge in the field of HorizontalDirectional Drilling Techniques,Pipeline,Oil & Gas underground pipe laying ,Trenchless technologies, Micro tunneling,Shaft & Tunneling, Mud Engineering, Mud logging Industry, Solid waste Controlling engineering, Geological & Geotechnical Subsurfaces Investigation services, Drilling Technologies, Onshore/Offshore drilling, Hydropower, Energy, Oil & Gas and Petrolium Expolrations ,To prove my talent to increase the companies Efficiency & productivity.

DESIGNATION:

Working asa “Drilling Fluids/Mud Engineer Cum Project Coordinator” for HDD.

EDUCATIONAL QUALIFICATION:

  • Passed M.Tech (Applied Geology) from Dr. Hari Singh Gour University,

Sagar, Madhya Pradesh-India.( Year2005-2008).

Subject combination: Mining Geology& Mineral Exploration, Engineering Geology, Groundwater & Soil Geology, Igneou Petrology, Metamorphic &Sedimentery Petrology, Mineral Economics & Industrials Minerals & Fuels, Geochemistry, Geodynamics &Geomorphology, Minerology, Structural Geology, Palaeontology & Applied Micropalaeo. Photogeology & Remote Sensing, Ore Geology, Stratigraphy,Palaeontology &, Topographic Surveying., Environmental Geology.

  • Passed B.Sc (Hons) Geology from AligarhMuslimUniversity, Aligarh (U.P) India(Year2002-2005)
  • Subject Combination: Envionmental Geology, Energy Resources, Structural Geology, Sedimentary-Metamorphic-Igneous Petrology, Applied Geology, Mathmatics, Physics, English, Urdu.
  • Passed Intermediate Exam from U.P Board India.(Year2001)
  • .Subject combination: Mathematices, Physics, Chemistry, English, General Hindi.

High school passed (Year 1999) from U.P Board, Mathmatics, Sceince, English Hindi, Biology, Social science.

Current Work Profile (February 2011 TO Present)Underground Oil & Gas Pipeline distribution or Installation by Horizontal Drilling Techniques, Site In charge of Underground Pipeline Construction, Underground pipeline Management, Geotechnical & Geological investigation for Underground Pipeline Construction, Underground Pipeline installation in long river Crossing with Sandy Strata, Underground pipeline installation in Hard rock & Soft Strata. Identify rock strength & Suggest tool, Soil Testing, Mud Quality Control, YieldingPoint, Plastic Viscosity, To check Actual Mud weight, Sand content, Handling of Recycle unit of Mud, Sand Content Kit,Mud Balance Kit, Application of Polymer+Surfactants+Bentonite+Additives in Bore Hole, Handling of Drilling Fluid measuring equipments ,Gel Strengths, Fluid loss control, Form Thin filter Cake, Frac-Out Control,Ph-Value of Mud & Water.Bore hole Collapse Prevention, Stabilization of Bore, Pilot & Reaming Process,Pipe installation. Drilling Rig & Mud System Maintenances. Site Execution , Controlling Drilling Planning & Maintenance of Drilling Rigs, Other equipments.

Supervison: Mud Cleaning System MCR10000, MCM900, MPR 6000(American Auger), MCM 4000,GN Solids Controls. 220 ton Hutty Rig, American Augar DD-440,DD-625 ,DD-1100,Vermeer D 330 X 500 , D 80 X 100, D 130 X 150, Mud Motor, Horizontall Direction Drilling Rigs, American Rig 250 Ton , Rig PB-100, Rig DD-25, Rig DD-6. Handling & Maintenances’ of these equipment.

Past Work Profile (May 2008 TO January 2011): Geological & Geotechncal investigation of surface & subsyrface area by Drilling techniques, to collect core sample of rock & soil. Litholog & core logging of bore hole, , Totatal Core Recovery(TCR), Solid Core Recovery(SCR), Rock Quality Designation(RQD), Rock Mass Classification, Rock Mass Rating(RMR), Q-System. Permeability test, Single & Double Packer Test& Calculate Luegon Value, Standard Penetration Test, uniaxial strength, Bearing capacity, Geological mapping,analyze &interpret the regional structure & stratigraphic relations, slope stability of soil. to calculate different Geological Parameter use in Engineering Geology, Site Execution & Drill Rig Maintinance, Project Management, Daily Drilling Planning, Tool Box meeting.

Supervison :Vertical Drilling Rigs, Hydraulics Longyer-44, Hydraulic whole-35, Calyx rig, Drilling accessorie,core barrel(single & double tube barrel),Bit of tungsten carbide & Diamonds bit, shoe bit of Nx & Hx size, and Nx,Hx size Casing drive.

DETAILS OF EXPEREINCE

Current employer : Enikkom Construction Ltd,Nigeria(West Africa).

Designation: Mud Engineer Cum Project Coordinator

Previous employer: Trenchless Engineering Services Pvt Ltd. Jointventure with Corrtech-Trenchless Pvt Ltd,

WH-40, 2 nd Floor, Mayapuri Phase-1 New Delhi110064 -India, Phone: +911128112223/24/25 (October 2012 to April 2015)

Designation: Mud Engineer Cum Project Coordinator

Previous employer: “Gypsum Structural India Pvt Ltd –Delhi”Mayurvihar phase-2, Delhi110091 India, Phone: +911122778812/+9111244232702(January 2012 to September 2012 ).

Designation: Geological Engineer

Previous employer:“MIDEASTPIPELINE PRODUCTS” D-913 New Friends Colony, Phone: +911126921042/+911126837783 New Delhi-110025 (Year Feb. 2011 to January 2012).

Designation: Drilling Engineer

Previous employer: Integrity Geoscience Pvt Ltd, 304/305 Mayush cosmos Tower,Plot 37,sector-11,Near Krisna hotel, Navi –Mumbai-Maharashtra- India, Phone: +912267122521 / +912267122520 (Year May2008-Jan 2011).

Designation: Engineering Geologists

Project Handled in “Inegrity Geosceince Pvt Ltd Navi Mumbai”(Year 2008 T0 2011).

1. Name of Project: Geological & Geotechincal Investigation by Vertical Drilling Rig For Sewerage Pipe Line of Bombay Muncipal Corporation, Maharashtra-India.(Basalt Rock Terrain)

Client: Mott Mac Donald Mumbai.

2. Name of Project: Geological & Geotechnical Investigation By Vertical Drilling Rig For Horizontal Direectional drilling crossing &Pipe line Project .location Amod to Hazira,at Gujarat India. (Offshore Area). Client: Indian Oil Corporation Limited.

3. Name of Project: Geological & Geotechnical Investigation By Vertical Drilling Rig For Gongri Hydro Electric Project, at Arunachal Pradesh(North East)- India. (Dam, Barrage site, Surge shaft ,Disilting chamber, Tunnel ,Vertical Shaft, Power house, Turbine Area )in OverburdenGneiss, Granite Rock.

Client: Patel Engineering Mumbai/NHPC.

Project Handled In “MIDEST PIPELINE PRODUCTS ”(Year 2011 To 2012):

  1. 16 inch Diameter & 1200 meter longDrilling section,1200 meter long Underground Pipeline Installation for Gas at Duliajaan RiverAssam India by Horizontall Directional Drilling Techniques.(Rig 250 Ton).

Client: Assam Gas Company Limited.

  1. 16 inch Diameter 484 meter long DrillingSection,484 meter long Underground Pipe Installation for Oil at Tengaghat-Sasoni Village River Of Assam by HDD techniques(Rig Pb-100).

Client: OIL INDIA LTD.

  1. 8 inch Diameter 250 meter long Horizontal Drilling,250 meter long Underground Pipeline Installation for Gas at Dewas city Madhya Pradesh Indiaby HDD (Rig DD-25).

Client: Gail Gas Company Limited.

  1. 16 InchDiameter of 455 Meter longDrilling section, 455 meter long Underground Pipeline Installation for Oil, at Digaru River sonapurAssam India by HDD (Rig Pb-100).

Client: Oil India Limited.

Project Handling in Gypsum Structural India Pvt Ltd

  1. Pipe Pulling Completed in LateriticDeposit/Banded Hematite Quarzite Rock atBicholim Goa India by Mud motor Drilling Techniques.

Client: Gail Gas Company. 2. Jack pushingRCC pipe techniques for Drainage collection from chamber of Railway Line atQazikund Kashmir India. On Going Project

Client: IRCON RAILWAY.

Project Handling In “Trenchless Eng Services Pvt Ltd”(Year 2012 To April 2015).

  1. 30 inch Diameter 950 meter LongDrilling Section,950 meter longUnderground Pipeline installation for Oilat Mahanadi river (Sandstone strata) at Raipur-Orissa Border India.

Client: IOCL

  1. 30 inch+6 inch Diameter860 meter Long Horizontall Borehole Drill, 860 meter Underground Pipeline installation at Asriar Char river crossing in Bangladesh.
  2. 30 +6 Inch Diameter & 675 meter Long Horizontal Borehole Drill, 675 meter long Underground Pipe installation atBrahmaputra river in Bangladesh.

Client: Mears Group Inc/Fernas construction Company.

  1. 24 inch Diameter & 450 Metre long Horizontal Drill,450 meter long Underground Pipeline installation for Gas at Calabar in Nigeria(West Africa).
  1. 36 Inch Diameter & 483 Meter Long Horizontal Borehole Drill,450 meter long Underground Pipeline installation for Gas supply at IBAFO Expressway in Nigeria(West Africa).
  1. 36 inch Diameter & 1430 Meter Long Horizontal Borehole Drill,1430 meter long Underground Pipeline installation For Gas supply at IBAFO Town in Nigeria (West Africa).
  1. 36 inch Diameter & 1050 Meter Long Horizontal borehole Drill, 1050 meter long Underground Pipeline installation for Gas at Magboro town in Nigeria -West Africa.
  1. 36 inch Diameter & 2000 Meter Long Horizontall borebole Drill, 2 km long Underground Pipeline Installation for Gas at IBafo town in Nigeria-West Africa

Project Handling in Ennikom Construction Ltd Nigeria (Year May 2015 To Present)

1. 12 inch Diameter & 1500 Meter Long Horizontall bore hole drill,1.5 km pipeline install for Conoil at Atlantic offshore Nigeria. Project name Anglo pipeline project-Kolama phase-1,client : Conoil Nigeria.

2. 36” inch Diameter and 1300 meter long Horizontall Directional drill, at Benin City and pipe install,client: Zakham Nigeria.

3.12 inch Diameter & 1500 Meter Long Horizontall bore hole drill,1.5 km pipeline install for Conoil at Atlantic offshore Nigeria. Rig Position on Jackup Baarge, Project name Anglo pipeline project-Kolama phase-2 ,client : Conoil Nigeria.

FIELD TRAINING:

  • Mining and ore reserve estimation of Malanj khand Copper deposit (Hindustan Copper Ltd) and Ukwa megnatite mine, City: balaghat, Madhya Pradesh-India, for one months.
  • Geological Field Report on the “Petrological and Economic Geology” in parts of Rajasthan about 25 days in 2007 in M.Tech IInd year.
  • Field Dissertation on the “Geological Mapping Techniques and Surveying” around Girar, City: Lalitpur- Uttar Pradesh, about 21 days in 2006 in M.Tech 1st year.
  • Geological Field Report on Chopan area (Sone Valley),City: Sonebhadra, Uttar Pradesh-India.
  • Geological Field Report on Bayana area,City: Bharatpur, Rajasthan-India.

EXTRA ACTIVITEIS:

  1. Reading Daily News Paper & TV All News Channel Like ,Loksabha, NDTV

Profit, Zeebuiseness, CNN,BBC world, Discovery Channels etc.

  1. To concentrate on my Goal along with keep eyes on world.
  1. Team Leading Skill