POWERCOR REVISED REGULATORY PROPOSAL – JAN 2016
Attachments not published on AER website
Powercor provided further supporting information which we have not published on our website due to the number of documents. However, if you wish to obtain a copy of this material, please email .
We have listed the public documents submitted by Powercor but not published on our website below:
PAL PUBLIC RRP ATT 2.2 Powercor Certificate of reasonableness of key assumptions January 2016.pdf
PAL PUBLIC RRP ATT 3.1 SCER, RIS limited merits review of decision-making in the electricity and gas reg frmwrks.pdf
PAL PUBLIC RRP ATT 3.1 HoustonKemp, Economic review of ERA's draft decision, 27 November 2014.pdf
PAL PUBLIC RRP ATT 3.11 Farrier Swier Consulting, Economic considerations for the interpretation of the NGO, May 2014.pdf
PAL PUBLIC RRP ATT 3.12 Economic Insights, Regulation of suppliers of gas pipeline services.pdf
PAL PUBLIC RRP ATT 3.13 Review of the limited merits review regime stage two report, 30 September 2012.pdf
PAL PUBLIC RRP ATT 3.14 AEMC, Review of the electricity transmission revenue and pricing rules, February 2006.pdf
PAL PUBLIC RRP ATT 3.2 Application by Energex Limited (No 4) [2011] ACompT 4.pdf
PAL PUBLIC RRP ATT 3.3 Second reading speech for the National Electricity South Australia New NEL Amendment Bill 2005.pdf
PAL PUBLIC RRP ATT 3.4 ReApplication by ElectraNet Pty Limited No 3 2008 ACompT 3.pdf
PAL PUBLIC RRP ATT 3.5 ReSeven Network Limited No 4 2004 ACompT 11.pdf
PAL PUBLIC RRP ATT 3.6 Application by Chime Communications Pty Ltd No 2 2009 ACompT 2.pdf
PAL PUBLIC RRP ATT 3.7 NERA, Economic interpretation, supplementary report, Ausgrid 8 May 2014.pdf
PAL PUBLIC RRP ATT 3.8 HoustonKemp, ActewAGL Distribution - preferable NEO decision, 13 Feb 2015.pdf
PAL PUBLIC RRP ATT 3.9 HoustonKemp, Energex - contribution to NEO preferable decision, 3 July 2015.pdf
PAL PUBLIC RRP ATT 4.1 AER, Final decision - appendices, Victorian distribution determination 2011-2015, October 2010.pdf
PAL PUBLIC RRP ATT 4.1 United Energy Distribution, Regulatory proposal, 30 April 2015.pdf
PAL PUBLIC RRP ATT 4.11 Tenix and ETU power construction maintenance enterprise agreement 2013GÇô2016, 15 October 2014.pdf
PAL PUBLIC RRP ATT 4.12 ZNX Pty Ltd - ETU Victorian electricity enterprise agreement 2013, 17 June 2014.pdf
PAL PUBLIC RRP ATT 4.13 ZNX Victorian staff enterprise agreement 2014, 3 February 2015.pdf
PAL PUBLIC RRP ATT 4.14 SPI PowerNet SPI Electricity - ASUAPESMA enterprise agreement 2013, 14 October 2013.pdf
PAL PUBLIC RRP ATT 4.15 SPI PowerNet SPI Electricity - ETU enterprise agreement 2013, 30 October 2013.pdf
PAL PUBLIC RRP ATT 4.16 SPI PowerNet SPI Electricity - ETU enterprise agreement 2010-13, 8 November 2010.pdf
PAL PUBLIC RRP ATT 4.17 Jemena Asset Management enterprise agreement (VIC) 2013, 23 August 2013.pdf
PAL PUBLIC RRP ATT 4.18 Jemena Asset Management - ETU Victorian electricity enterprise agreement 2013, 12 June 2014.pdf
PAL PUBLIC RRP ATT 4.19 Utilities Management Pty Ltd Enterprise Agreement 2014, 19 May 2014.pdf
PAL PUBLIC RRP ATT 4.2 Economic Insights, Economic benchmarking of electricity network service providers, 25 June13.pdf
PAL PUBLIC RRP ATT 4.2 AER, Final decision Ausgrid 2015GÇô16 to 2018GÇô19, April 2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.21 Frontier Economics, Review of AER's Preliminary Decision on Labour Price Growth, December15.pdf
PAL PUBLIC RRP ATT 4.22 AER, Preliminary decision, AusNet Services 2016GÇô20, October 2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.23 AER, Preliminary decision, Jemena distribution determination 2016GÇô20, Oct 2015, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.24 DAE, Forecast growth in labour costs in NEM regions of Australia, 23 February 2015.pdf
PAL PUBLIC RRP ATT 4.25 MOU between CitiPower, Powercor and the CEPU(undated).pdf
PAL PUBLIC RRP ATT 4.26 NERA (UK), Expert report on expected inflation in labour costs, 23 June 2015.pdf
PAL PUBLIC RRP ATT 4.27 AER, Final decision, SP AusNet transmission determination 2014-15 to 2016-17, January 2014.pdf
PAL PUBLIC RRP ATT 4.28 AER, Final decision, Powerlink transmission determination 2012-13 to 2016-17, April 2012.pdf
PAL PUBLIC RRP ATT 4.29 ASU, Log of Claims, June 2013.pdf
PAL PUBLIC RRP ATT 4.3 Frontier Economics, Review of AER's preliminary decision on opex input weights, December 2015.pdf
PAL PUBLIC RRP ATT 4.3 APESMA, Log of claims (undated).pdf
PAL PUBLIC RRP ATT 4.31 NUW, Log of claims (undated).pdf
PAL PUBLIC RRP ATT 4.32 The Centre for International Economics, Labour price forecasts, 20 November 2015.pdf
PAL PUBLIC RRP ATT 4.34 Jacobs, Escalation indices forecast 2016GÇô2020, 17 November 2015.pdf
PAL PUBLIC RRP ATT 4.35 AER, Explanatory statement Capital expenditure incentive guideline, November 2013.pdf
PAL PUBLIC RRP ATT 4.36 BIS Shrapnel, Real Labour Cost Escalation Forecasts to 2017, October 2012.pdf
PAL PUBLIC RRP ATT 4.37 Access Economics, Forecast growth in labour costs, March 2010.pdf
PAL PUBLIC RRP ATT 4.38 Access Economics, Labour cost indices for the energy sector, April 2007.pdf
PAL PUBLIC RRP ATT 4.39 AEMC, Distribution Network Pricing Arrangement, Rule Change, November 2014.PDF
PAL PUBLIC RRP ATT 4.4 Pacific Economics Group, TFP research for Victoria's power distribution industry, December04.pdf
PAL PUBLIC RRP ATT 4.4 AEMO, Detailed summary of 2015 electricity forecasts, 2015 NEFR, June 2015.pdf
PAL PUBLIC RRP ATT 4.41 AER explanatory statement, Efficiency benefit sharing scheme, November 2013.pdf
PAL PUBLIC RRP ATT 4.42 Armstrong, Combining forecasts, June 2001.pdf
PAL PUBLIC RRP ATT 4.43 Borland, Recommendations for methodology for forecasts WPI, October 2012.pdf
PAL PUBLIC RRP ATT 4.44 BIS Shrapnel, Real labour cost escalation forecasts to 2017, November 2012.pdf
PAL PUBLIC RRP ATT 4.45 Deloitte, Forecast growth in labour costs, Victoria and South Australia, February 2013.pdf
PAL PUBLIC RRP ATT 4.46 Deloitte, Forecast growth in labour costs in NEM regions of Australia, June 2015.PDF
PAL PUBLIC RRP ATT 4.47 Deloitte, A response to submissions on AER preliminary decision, September 2015.PDF
PAL PUBLIC RRP ATT 4.48 Deloitte, Forecast growth in labour costs in Victoria, June 2013.pdf
PAL PUBLIC RRP ATT 4.49 BIS Shrapnel, Real labour and material cost escalation forecasts to 2020, November 2014.pdf
PAL PUBLIC RRP ATT 4.5 Powercor 2012-2014 Resources Agreement.pdf
PAL PUBLIC RRP ATT 4.5 AER, Economic benchmarking RIN for DNSP, Instructions and Definitions, November 2013.pdf
PAL PUBLIC RRP ATT 4.51 AER, Final Decision Ausgrid distribution determination, Attachment 7, April 2015.pdf
PAL PUBLIC RRP ATT 4.52 Economic Insights, Response to Ergon Energy on Economic Benchmarking, October 2015.PDF
PAL PUBLIC RRP ATT 4.53 BIS Shrapnel, Outlook for SA Power Networks real cost escalation forecasts, January 2014.pdf
PAL PUBLIC RRP ATT 4.6 AER, Final decision, SAPN distribution determination 2015-16 to 2019-20, Oct15, Attachment 7.pdf
PAL PUBLIC RRP ATT 4.7 DLA Piper, Legal Opinion, 16 December 2015.pdf
PAL PUBLIC RRP ATT 4.8 Deloitte Access Economics, NSW DNSP labour analysis, Final addendum to 2014 report, April15.pdf
PAL PUBLIC RRP ATT 4.9 SAPower Networks - Revised regulatory Proposal 2015-20 , 3 July 2015.pdf
PAL PUBLIC RRP ATT 5.1 CEPA - Review of demand forecasting approaches, December 2015.pdf
PAL PUBLIC RRP ATT 5.1 AEMO email to CitiPower and Powercor regarding demand forecasting, 17 November 2015.pdf
PAL PUBLIC RRP ATT 5.11 Minister for Energy and Resources, Distribution network pricing arrangements, November 2015.pdf
PAL PUBLIC RRP ATT 5.12 AER, Preliminary decision, Jemena distribution determination, Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.13 AEMO, 2015 Transmission Connection Point Forecasting Report for Victoria, September 2015.pdf
PAL PUBLIC RRP ATT 5.14 AEMO, 2015 NEFR forecasting methodology information paper, July 2015.pdf
PAL PUBLIC RRP ATT 5.15 AEMO, 2014 Transmission connection point forecasting action plan, October 2014.pdf
PAL PUBLIC RRP ATT 5.16 AEMO, Forecast Accuracy Report 2015 for 2015 NEFR, November 2015.pdf
PAL PUBLIC RRP ATT 5.17 Forecasting long-term peak half-hourly electricity demand for Victoria, June 2015.pdf
PAL PUBLIC RRP ATT 5.18 Fan, Hyndman, Monash University forecasting model, June 2015.pdf
PAL PUBLIC RRP ATT 5.19 AEMO, 2014 Transmission connection point forecasts for NSW and ACT.csv
PAL PUBLIC RRP ATT 5.2 CIE, Maximum Demand Forecasting for CitiPower and Powercor - 2015 update, July 2015.pdf
PAL PUBLIC RRP ATT 5.2 AEMO, 2015 Transmission connection point forecasts for QLD.csv
PAL PUBLIC RRP ATT 5.21 AEMO, 2015 Transmission connection point forecasts for VIC.csv
PAL PUBLIC RRP ATT 5.22 Ergon Energy, 2015-16 to 2019-20 Reset RIN.xlsm
PAL PUBLIC RRP ATT 5.23 Energex, 2015-16 to 2019-20 Reset RIN.xlsm
PAL PUBLIC RRP ATT 5.24 Essential Energy, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.25 Endeavour Energy, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.26 Ausgrid, 2014-15 to 2018-19 Reset RIN.XLSX
PAL PUBLIC RRP ATT 5.27 ActewAGL, 2014-15 to 2018-19 Reset RIN.xlsx
PAL PUBLIC RRP ATT 5.28 AER, Final Decision Ausgrid distribution determination, Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.29 AER, Final Decision Endeavour Energy distribution determination, Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.3 Oakley Greenwood, Metadata analysis of disruptive technologies on demand forecasts, June 2015.pdf
PAL PUBLIC RRP ATT 5.3 AER, Final Decision Essential Energy distribution determination, Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.31 AER, Final decision Ergon Energy distribution determination, Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.32 AER, Final decision Energex distribution determination, Attachment 6, October 2015.pdf
PAL PUBLIC RRP ATT 5.33 AER, Final Decision ActewAGL distribution determination, Attachment 6, April 2015.pdf
PAL PUBLIC RRP ATT 5.34 CIE demand model code - Data preparation, adding cogen and wind farms 2015 update.pdf
PAL PUBLIC RRP ATT 5.35 CIE demand model code - Data preparation, adding melbourne water cogen.pdf
PAL PUBLIC RRP ATT 5.36 CIE demand model code - Data preparation, append old electricity data.pdf
PAL PUBLIC RRP ATT 5.37 CIE demand model code - Data preparation, append old electricty data to new.pdf
PAL PUBLIC RRP ATT 5.38 CIE demand model code - Data preparation, maximum actual demand max cogen coincidence.pdf
PAL PUBLIC RRP ATT 5.39 CIE demand model code - Modelling, Average quartery demand model.pdf
PAL PUBLIC RRP ATT 5.4 CIE, Review of Assessment of Forecasts by Darryl Biggar and AER, December 2015.pdf
PAL PUBLIC RRP ATT 5.4 CIE demand model code - Modelling, max demand model.pdf
PAL PUBLIC RRP ATT 5.5 CIE, Review of 2015 AEMO Transmission Connection Point Forecasts and Methodology, Dec 2015.pdf
PAL PUBLIC RRP ATT 5.6 Powercor Tariff Structure Statement 2017-2020, Overview paper, September2015.pdf
PAL PUBLIC RRP ATT 5.7 Oakley Greenwood, Powercor pricing comparisons 1995-2014, December 2014.pdf
PAL PUBLIC RRP ATT 5.8 GHD, AEMO Demand Forecast Review (2015 update), December 2015.pdf
PAL PUBLIC RRP ATT 5.9 AEMO, NEFR September Feedback Workshops, October 2015.pdf
PAL PUBLIC RRP ATT 6.1 AER, Expenditure forecast assessment guideline distribution, Nov 2013.pdf
PAL PUBLIC RRP ATT 6.1 Gartner, Attack on Sony Pictures is a digital business game changer, 9 Feb 2015.pdf
PAL PUBLIC RRP ATT 6.11 ABC News report (online), Cyber attack on Bureau of Meteorology computer, 2 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.12 ABC News report (online), BOM report recommends computer system overhaul, 3 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.13 Gartner, Recommended life spans for mobile devices, 11 Sep 2015.pdf
PAL PUBLIC RRP ATT 6.14 AEMC, Distribution Network Pricing Arrangements Rule.pdf
PAL PUBLIC RRP ATT 6.15 Powercor, Tariff structure statement 2017-2020, 25 Sep 2015.pdf
PAL PUBLIC RRP ATT 6.16 CitiPower and Powercor, RIN reporting compliance, December 2015.pdf
PAL PUBLIC RRP ATT 6.17 AER, Final category analysis RIN for DNSPs, Mar 2014.pdf
PAL PUBLIC RRP ATT 6.18 AER, Final economic benchmarking RIN for DNSPs, Nov 2013.pdf
PAL PUBLIC RRP ATT 6.19 AER, Explanatory statement economic benchmarking RIN, Nov 2013.pdf
PAL PUBLIC RRP ATT 6.2 ESCV, Review of the Victorian electricity distributors' GSL payment scheme, final decision.pdf
PAL PUBLIC RRP ATT 6.2 AASB, Auditing standard ASA 805, Oct 2009.pdf
PAL PUBLIC RRP ATT 6.21 AASB, Standard on review engagements ASRE 2405, Aug 2008.pdf
PAL PUBLIC RRP ATT 6.22 Minister for Energy and Resources, Letter regarding chapter 5A, 18 Sep 2015.pdf
PAL PUBLIC RRP ATT 6.23 National Electricity (Victoria) Further Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.24 Explanatory Memorandum, National Electricity (Victoria) Further Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.25 Second reading, National Electricity (Victoria) Further Amendment Bill.pdf
PAL PUBLIC RRP ATT 6.26 Electricity Safety (Electric Line Clearance) Regulations (2015).pdf
PAL PUBLIC RRP ATT 6.27 Electricity Safety (Electric Line Clearance) Regulations (2005).pdf
PAL PUBLIC RRP ATT 6.28 ESV, Exemption Electricity Safety (Electric Line Clearance) Regulations 2010.pdf
PAL PUBLIC RRP ATT 6.29 ESV, Exemption, Electricity Safety (Electric Line Clearance) Regulations 2010.pdf
PAL PUBLIC RRP ATT 6.3 CitiPower and Powercor, Submission on ESCV draft GSL decision, 4 Dec 2015.pdf
PAL PUBLIC RRP ATT 6.3 ESCV, Review of the Victorian electricity distributors' GSL payment scheme, draft decision.pdf
PAL PUBLIC RRP ATT 6.31 DEDJTR submission to Victorian electricity distribution pricing review 2016 to 2020, Jul15.pdf
PAL PUBLIC RRP ATT 6.4 Powercor, 2014 Annual Reporting RIN, Appendix B (public).xlsm
PAL PUBLIC RRP ATT 6.5 Ofgem, Final determination for slow track electricity companies, 5 Nov 2014.pdf
PAL PUBLIC RRP ATT 6.6 CMA, Northern Powergrid v GEMA, final determination, 29 Sep 2015.pdf
PAL PUBLIC RRP ATT 6.7 AEMC, Rule Determination, Expanding competition in metering and related services, 26 Nov 2015.pdf
PAL PUBLIC RRP ATT 6.8 AEMC, Expanding competition in metering and related services.pdf
PAL PUBLIC RRP ATT 6.9 Australian Cyber Security Centre, 2015 Threat Report, Jul 2015.pdf
PAL PUBLIC RRP ATT 7.11 Powercor, New Torquay zone substation updated business case, December 2015.pdf
PAL PUBLIC RRP ATT 7.2 Powercor, Proactive conductor replacement program - updated, December 2015.pdf
PAL PUBLIC RRP ATT 7.3 Hon L D'Ambrosio MP, Letter to Powercor, 9 October 2015.pdf
PAL PUBLIC RRP ATT 7.4 -Mr Tim Rourke, Letter to Hon L. D'Ambrosio MP, 26 October 2015.pdf
PAL PUBLIC RRP ATT 7.5 -AusNet Services, Bushfire Mitigation Plan, Electricity Distribution Network, 22 July 2014.pdf
PAL PUBLIC RRP ATT 7.6 -AusNet Services, Appendix 7A Network Capital Expenditure Overview 2016-2020, April 2015.pdf
PAL PUBLIC RRP ATT 7.7 -Jacobs, Powercor Repex Other Support, December 2015.pdf
PAL PUBLIC RRP ATT 7.8 -R. Scott MP, ESC Inquiry into the true value of distributed generation, 11 September 2015.pdf
PAL PUBLIC RRP ATT 7.9 -Powercor, Voltage compliance program, December 2015.pdf
PAL PUBLIC RRP ATT 8.1 AER, Preliminary decision, Jemena distribution determination 2016-20, attachment 6, Oct15.pdf
PAL PUBLIC RRP ATT 8.2 AER, Final decision, SA Power Networks determination 2015-16 to 2019-20, attachment 6, Oct15.pdf