ELECTRICAL QUALITY ASSURANCE GROUP’S MONTHLY ACTIVITY REPORT
MONTH: SEPTEMBER YEAR: 2006 / Page No. 2 of 6NAME: SCADA SECTION
A: - PERFORMANCE INDICES
INDICES /This month Sept 06
/ Sept 05 / YTM- FY 07 / YTM- prev. year / TargetAvailability Index (%)
Overall
T&D
LDC
/ 99.4%
98.92%
100.00% / 81.37% / 99.63% / 87.18% / 99.60%
SCADA system not available for operations / Date / No of Hours / Reasons and action taken
·
·
· / Dharavi
Khopoli
Trombay Station A / 10-Sep-06
Entire month
Since 24-Sep-06 / 30 Hrs
152 Hrs / Hard disk Failure & Repair work.
Master Replacement work in progress. System is ready for commencing SAT.
Both the DAC Node failures have brought down the SCADA System.
B: - COMMISSIONING & OTHER ACTIVITIES
Station / Location / Equipment / Scheme /Chembur / · SCADA system has been put on trial operation.
DA System for Saki, Borivli and Central Mumbai / · I/O checks as a part of Functional Checks completed for 28 stations of Central Mumbai.
Process Improvements / · Web Based Call Centre for SCADA complaints has been configured by IT and is available for use by divisions.
C: –MAJOR FAILURES, PROBLEMS & INVESTIGATION
A total of 13 Calls was attended in September 2006. Nelco Engineers were associated for attending to 6 calls with TPC Engineers. Four expert maydays were also utilised to attend to Dharavi problem of Hard disk failure.
Dharavi / External Hard disks / 10-Sep-06 / Both the external Hard disks failed, one was repaired & put back in service. A spare disk is being procured.Trombay Station ‘A’ / Both the DAC Nodes failed / Since 24-Sep-06 / Both the DAC nodes have failed. No Spares are available. The system is out since then.
D:-NEW, DIFFERENT, BETTER
DIFFERENT:· A condition based Maintenance has been initiated for SCADA maintenance activities. A Check list has been prepared & the History/Inspection Sheet has been updated for all SCADA Systems maintained in-house.
BETTER:
· Web Based Call Centre for SCADA complaints has been configured by IT and is available for use by divisions. The divisions have already started using the WebCC & the complaints are being lodged through it. This will help to maintain a Systematic record of faults & their analysis.
· Backups of SCADA System database are taken every four months & a copy of these are being maintained in the EQAG Dept. This will help us to maintain a redundant set of Backups at a separate location. The progress of this is 33.33% for this trimester.
E: - TRAINING / INSPECTIONS / DEPUTATION / SEMINARS / GENERAL TOPICS ETC.
· Ms B S Pisolkar, Mr A. A. Buddhiwant , Mr. Amok Agarwala and Mr Ashish Mhatre attended a 3 day training programme on AREVA SCADA RTU maintenance from 22nd September to 25th September 2006 held at Vikhroli.· Mr P. A. Jayakumar attended a 2 day Innovation Workshop on 29th & 30th September 2006 at Trombay conducted by Dr. Bowonder
DATE: -
Sr. Mgr (SCADA)
CC: - SECTION HEAD - EQAG.
Form No: EQA-CRI-01-FM-01 / Page no. 2 of 2 / Rev. No.: 00 Rev. Date: 01-11-2002