SCOPE OF WORK
- INTRODUCTION
Hindustan Oil Exploration Company limited is primarily involved in Exploration and Production of Oil and Gas in India. Pursuant to a Production sharing contract with Government, the Company operates PY1 offshore field, Bay of Bengal of the coast of Tamil Nadu , around 18 km East of Porto Novo.
The production of well fluids from the PY field (SUN offshore platform) is transmitted through a 14” inch diameter 56 km sub sea/onshore pipeline to onshore gas processing plant,PY-1 field. The produced natural gas and associated liquid hydrocarbons is processed at PY-1 Terminal situated at Thirukkadaiyur, Tharangambadi Taluk, Tamilnadu.
The PY1 field is controlled and monitored from the central control room (CCR) which is located onshore at the Gas Processing Plant Located. The PY1 Sun platform is designed for unmanned operations. There is no permanent accommodation on the platform
- SCOPE OF WORK:
- The man walkway platform to be fabricate in onshore and fixed in offshore boat landing and welding work to be done.
- The required materialand fabrication rate detailsare given below.
Sl no / Description / Unit / Amount
1 / Fabrication of support with hinge arrangements including ISMB 200 for supporting walkway, Ball bearings assembly and end foldable walkway. / LS / 43,000.00
2 / Fabrication of Aluminium walkway with handrails. / LS / 35,000.00
3 / MS monkey ladder / LS / 9,800.00
4 / Erection of all arrangements to site with labour,machinery,tools and tackles. / LS / 38,000.00
5 / Transportation charges up to cuddalore port / 8000
- Welding equipment and dye penetrant kit for welding inspection shall be provided by the contractor
- Contractor must able to finish the defined activity within 3 days offshore visit(working at platform Max 12 hrs ) from the date of award of the Contract by the Company.
- The contractor is responsible for the planning, erection, alteration, inspection as per the standard to provide safe access and 100% fall protection in connection to maintenance and other related works of HOEC.
- Contractor should bring its own equipment for the work and loading-unloading cost, standby cost, Cost of consumables and non-consumables and manpower shall be all inclusive
- The contractor shall be responsible for the necessary training / certification of the service personal to work in offshore platform.
- The company is responsible for mobilizing the service personal further to offshore platform through Aqua pride boat from cuddalore port .
- The company will arrange for all related work permits / clearances to undertake the work at offshore platform.
- The contract service personal is to adhere all the work permit system, HSE policy and safety norms and regulations as and then modified by the company.
- Company is responsible for delays at offshore location due to bad weather for approaching the platform, unavailability of spare materials and manifesting after the mobilization of the service personal.
- Contractors shall be responsible for providing the necessary PPE to its personal while working at site. The personnel working at site shall be provided with bare minimum essential PPE’s which includes Safety Shoes, Safety Helmets, Coveralls, Goggles, Face Masks other safety equipments.
- While execution of work at the Platform, Gas plant and auxiliaries in process area will be in running condition. Hence, contractor has to take all precautions for safety etc
- Contractor confirms that’s is offer is based on the total understanding of the Work and the prices quoted under Annexure I (Compensation schedule) are fixed and firm and shall not be subject to any revisions or amendments.
- Location of Work HOEC –PY-1 Offshore Sun Platform, Bay of Bengal of the coast of Tamil Nadu, around 18 km East of Porto Novo
- Contractor shall appoint sufficient and appropriate personnel to supervise and control the Work.
- STATUTORY RULES & REGULATIONS:
The contractor shall be solely responsible for compliance with:
Labour laws
Payment of Wages Act,
Employees Provident Fund Act,
Workmen Compensation Act,
Works Contract Act, Sales Tax Act,
Minimum Wages Act,
Industrial Disputes Act 1947,
Contract Labour (Regulation & Abolition) Act 1970,
Mines Act 1952,
Mines Rules 1955,
Oil Mines Regulations 1984,
Explosives Act,
Environment protection Act, 1986
The Contractor shall take full responsibility for stoppage of work, as a result of non- compliance to above rules and violations pointed by the enforcing agencies or any other reasons thereof.
The Contractor shall, at his own cost and time, rectify all the defects / violations pointed out by such s statutory authorities.
Such stoppage of work shall not be taken as a valid reason for not achieving the targets and the Company shall be free to impose penalty, stipulated, in the tender document.
The Contractor shall defend, indemnify and hold the Company harmless from any liability or penalty which may be imposed by the Central / State or local authorities, by the reasons of any assorted violation, by the Contractor and also from all claims, suites or proceedings that may be brought against the Company.
- Contractors shall be responsible for providing the necessary PPE to its workers while working at site. The personnel working at site shall be provided with bare minimum essential PPE’s which includes Safety Shoes, Safety Helmets, Coveralls, Goggles, Face Masks other safety equipments.
- Contractor shall adhere to the company’s HSE policy and to the system of working in place at the site.
- The contractor will be responsible and liable for any damage to men or materials during his work.
- While execution of work at the Gas plant and auxiliaries in process area will be in running condition. Hence, contractor has to take all precautions for safety etc.
- The contractor will be required to follow the Permit to work system applicable at site.
- HSE SCOPE OF WORK FOR WORKING AT PY1 SITE
- Safe Working
- Permit To Work
- Safety Training
- Hygiene
- Company’s Responsibility
Loading and un-loading of material shall follow safe procedures as per guidelines of the Company and wherever applicable the HSE at site will provide the relevant guidance in this regard.
- Crane at Platform
- Management
Contractor shall prepare a plan for Company review and acceptance defining the systems, processes and personnel to be deployed to execute the Work.
- Supply of Equipments
- Personal Protective Equipments
Safety helmet approved by a recognised international standard
Coverall
Goggles (Eye protection)
Ear Plugs (Ear protection)
Hand Gloves
Electrical Shock Proof Handgloves
Safety Shoes
Rain Coats
Face Masks
If any of the Services specified in the Scope of Work are sub-contracted, then all of the above will also apply to the sub-contractors and their personnel.
In case of going offshore Life Jackets will be provided by the Company.
- Quality
- Working at Site
The Contractor will be responsible and liable for any damage to its men or materials, occurrences of incidents during work, testing or connected activities being carried out with in or outside the plant premises
- Electricity:
- Calibration and Testing
- Emergency / Safety Mock Drills
- Rescheduling of Activities:
- Company Safety Targets:
- Company's Substance Abuse Policy:
- Rules and Regulations:
The contractor shall follow various regulations while working on site applicable to Oil Mines areas and other rules as per the constitution of India in this regard.
The Contractor has to carry out required work strictly according to OISD/CCOE/DGMS norms & standards guidelines as available and revised from time to time.
The contractor shall submit registration letter (if they have) received from competent authorities and calibration certificate for the equipments used for the work at company site.
The Contractor should comply with the all Indian laws as per the constitution of India but not limited to:
PETROLEUM AND NATURAL GAS (SAFETY IN OFFSHORE OPERATIONS) RULES, 2008
THE ENVIRONMENT PROTECTION ACT 1986
THE EXPLOSIVES ACT, 1884
PETROLEUM ACT 1934
PETROLEUM RULES 2002
THE MINES ACT, 1952
THE OIL MINES REGULATIONS ACT 1984
THE PUBLIC LIABILITY INSURANCE ACT, 1991
THE HAZARDOUS WASTES (MANAGEMENT & HANDLING) RULES, 1989
The Contractor shall provide the relevant data required by the Company from Contractor for filing returns to the statuary authorities as required for the compliance for any of the rules mentioned.