HRTPO
Congestion Mitigation and Air Quality Improvement Program (CMAQ)
Project Selection Process
2018
*please note: all blanks must be filled in to ensure the best possible total score (ex. if an explanation is required for a “yes”/”no” response, one must be submitted in order to receive a score for that item).
* Planning Study Projects should be submitted under the Regional Surface Transportation Program.
The 2018 CMAQ/RSTP Project Selection Process will primarily focus on funding allocations for FY 2025.
Candidate Project Application: Transit and Fixed Guideway Projects
Locality/Agency:
Project Name:
UPC #: (if available) Date:
Primary Contact: Phone:
E-Mail:
Secondary Contact: Phone:
E-Mail:
Project Location:
(Please provide a detailed description of the location of the project. If applicable, please also attach a map to your application.)
Description of Project:
(Please provide a brief description of the scope of the project.)
Project Need:
(Please provide the need for and benefit to be derived from the project, including the impact on air quality.)
| HRTPO CMAQ Project Application – Transit and Fixed Guideway Projects | 3
Locality/Agency: CMAQ
Project Name: 2018
Is this a new project? Yes No
Is this project consistent with the current HRTPO Long-Range Transportation Plan? Yes No
Has this project been considered for CMAQ funding in the past? Yes No
Estimated Start Date: Estimated Completion Date:
Overall Project Cost: $
Total CMAQ Funding Request: $
Please specify the funding request for FY 2025 (Year One) followed by planned requests for ensuing years:
Phase / Year One / Year Two / Year Three / Year Four / Year Five / TotalPE / $ / $ / $ / $ / $ / $ 0
RW / $ / $ / $ / $ / $ / $ 0
CN / $ / $ / $ / $ / $ / $ 0
Total / $ 0 / $ 0 / $ 0 / $ 0 / $ 0 / $ 0
On the following page, please fill out all applicable sections. For example, if a combination of new/expanded service and new facilities are part of a single project, be sure to fill out both sections to get full credit.
Locality/Agency: CMAQ
Project Name: 2018
Fill out all applicable sections below:
Section 1: New or Expanded Transit Service
Estimated number of new boardings per day
Number of new round trips per day
Number of days per year service is available
Length of round trip (miles)
Emissions rates of vehicles to be used for service (specify units: grams/brake-horsepower-hour or grams/mile):
(rate) (units) Volatile Organic Compounds (VOCs) (aka Total Hydrocarbons)
(rate) (units) Nitrogen Oxides (NOx)
(rate) (units) Non-Methane Hydrocarbons (NHMCs) (if NOx and/or VOC is not available)
Section 2: Vehicle Purchase/Replacement
Number of new vehicles
Estimated average vehicle-miles per year
Emissions rates of new vehicles (specify units: grams/brake-horsepower-hour or grams/mile):
(rate) (units) VOC
(rate) (units) NOx
(rate) (units) NHMCs (if NOx and/or VOC is not available)
If old vehicles are to be retired:
Number of vehicles being retired, by age (include model year [MY], number of buses [Number], and estimated average annual vehicle miles per bus [miles])*:
MY Number Miles
*if more space is required, please attach an additional sheet.
Section 3: Transit Shelters/Facilities
Number of shelters/facilities to be added or replaced
Estimated number of new boardings per day due to added/replaced shelter/facility.
List all route(s) served by shelters/facilities:
| HRTPO CMAQ Project Application – Transit and Fixed Guideway Projects | 3