SW Region Projects Going to Bid in 2014
1) I-205, Mill Plain To NE 18th Street – Phase 2June 16, 2014 Ad
Clark County$35 million
Description: Add new northbound off-ramp and southbound on-ramp to existing NE 18th Street Bridge over I-205. Extend length of southbound off-ramp and grade-separate it from the southbound on-ramp with a 600 ft bridge. Add northbound off-ramp from Mill Plain vicinity to NE 18thStreet. Shift 1,000 feet of southbound I-205 into median area. Add two noise walls on west side of I-205.
Major items:
One 600 foot length composite steel girder single lane ramp bridge.
Seismic Retrofit on existing NE 9th St and NE 18th St bridges over I-205.
Two concrete noise walls – 2,000 feet length total
Reinforced concrete retaining wall - 15,000 square feet
Soldier pile wall – 14,000 square feet
Structural earth wall – 65,000 square feet
Concrete wall facia panels – 28,000 square feet
Roadway Excavation Including Haul – 140,000 cubic yards
Structure Excavation Class A – 3,800 cubic yards
Structure Excavation Class B – 3,600 cubic yards
Embankment Compaction – 40,000 cubic yards
Crushed surfacing base course rock – 18,000 tons
Cement concrete pavement - 1,600 cubic yards
Hot Mix Asphalt –21,000 tons
Storm Sewer Pipe (12” – 18”) - 5,500 linear feet
Single Slope Concrete Barrier - 7,400 linear feet
Temporary Concrete Barrier – 13,000 linear feet
Two Cantilever Sign Structures
One sign bridge
Illumination System
One Traffic Signal System
One Variable Message Sign System
Shoring or Extra Excavation Class B - 20,000 square feet
Compost Amended Vegetated Filter Strip – 5,000 linear feet
2)I-5, NE 39th Street to NE 99th Street – Paving5/05/2014 Ad
Clark County$2 million
Description: Grind out 0.15 feet of existing asphalt and replace with new Hot Mix Asphalt on all existing travel lanes (not shoulders), northbound and southbound. Includes plastic striping and lane markers.
Major Items:
Planing existing asphalt 0.15 feet depth – 140,000 square yards
Hot Mix Asphalt – 14,000 tons
3)I-205, Bi-State Corridor Travel Time Signing4/21/2014 Ad
Clark County$500k - $700k
Description: Install travel destination timeline signs; cantilever sign structures.
4)I-205, Traveler Information, Padden Parkway to NE 134th Street5/19/2014 Ad
Clark County $700k-$1 million
Description: Install fiber optic communication system; traffic cameras; data stations.
5)SR 14, Traveler Information, SE 164th Ave to NW 6th Avenue in Camas6/02/2014 Ad
Clark County $1 million
Description: Install communication fiber, traffic cameras, and radar traffic detection.
6)SR 507, Yew Street Intersection Improvements5/05/2014 Ad
Lewis County$500k - $700k
Description: Install new traffic signal system; enlarge turn radius at street corners; grind and inlay asphalt through the intersection.
Major items:
One traffic signal system
Hot Mix Asphalt – 300 tons
Planing Asphalt - 800 square yards
7)US 12, 0.6 Miles West of Chapman Road Erosion Protection5/27/2014 Ad
Lewis County $1.5 - $2 million
Description: Stabilize eroding Cowlitz River bank to protect US 12 by cutting the existing slope; installing rip rap; installing rock bank barbs in the river; planting a habitat buffer area; fencing.
Major items:
Roadway Excavation Including Haul – 4,000 cubic yards
Light Loose Rip Rap – 7,800 tons
Heavy Loose Rip Rap – 4,300 tons
Log Rootwads 20 feet length – 145 each
8)US 97, Biggs Rapids Bridge Painting5/12/2014 Ad
Klickitat County $10 million
Description: Remove old paint; clean surfaces; full containment; paint bridge.
9)SW Region-Wide Guard Rail Upgrades November 2014 Ad
SW Wa Counties$600 - $700 k
Description: Replace highway regulatory and warning signs throughout SW Washington that have exceeded their useful lifetimes for visibility and reflectivity.
SW Region Projects Going to Bid in 2015
1)SR 501, Gee Creek Bridge to 56th Place – Chip Seal and Hot Mix AsphaltFeb. 2015 Ad
City of Ridgefield $1 million
Description: Chip seal existing highway, and place hot mix asphalt in locations of severe distress.
2)SR 14, Nelson Creek Road to Bingen – Chip SealFeb. 2015 Ad
Skamania and Klickitat Counties $2 million
Description: Chip seal existing highway; grind out and inlay hot mix asphalt in areas of severe pavement distress.
3)SR 14, Rock Scaling – Vicinity of Tunnel No. 3 March 2015 Ad
Skamania County$300 - $400 k
Description: Strategic rock scaling to reduce risk of rock fall onto highway.
4)US 97, Rock Scaling – Vicinity of Maryhill Climbing Lane March 2015 Ad
Klickitat County $200 k
5)SR 504, Slide Repair – 1.3 Miles East of SR 505April 2015 Ad
Cowlitz County$250 - $350 k
Description: Stabilize existing slope with geotextile fabric and rip rap placement.