The Christchurch City Council Construction Standard Specifications series contains details of methods and acceptable materials to construct assets that will be taken over or maintained by Christchurch City Council.
This web page details the current materials approved for use within Christchurch City Council’s lighting, roading, water, wastewater and surface water systems.
STREETLIGHTING MATERIALS
IDS Part 11: Lighting sets out Council’s requirements for luminaires, columns and outreach arms.
Luminaires
Currently approved LED luminaires are detailed here[YM1]. Please read the notes at the bottom of these pages. As lighting technologies are changing rapidly, this list will be frequently updated. The Guidelines for the Provision of Data for the Assessment of LED Luminaires[YM2] sets out information to be provided when applying to use an LED which is not currently approved. Submit a completed Luminaire Description with your application, using the LED Road Lighting Luminaire Data Form [YM3]to ensure all required information is provided.
Poles and Outreach Arms
When applying for acceptance for poles and outreach arms, provide the associated manufacturer’s drawings, specifications and Producer Statements (PS1). If non-frangible poles are proposed, clearly state this on the drawings. The following [YM4]ground planted frangible column, outreach arm and adaptor drawings provide dimensions which must be achieved to obtain acceptance.
- 9.0m octagonal [YM5]SL column with mitred outreach
- 10.0m octagonal [YM6]SL column with mitred outreach
- 11.0m octagonal [YM7]SL column with mitred outreach
- 12.0m octagonal [YM8]SL column with mitred outreach
- Octagonal [YM9]subdivisional SL column with curved outreach
- Octagonal [YM10]sectional steel column
- Decorative [YM11]straight column base for decorative extension and outreach arm
- Decorative [YM12]stepped column base for decorative extension and outreach arm
- Side mounted straight S302 outreach [YM13]arm
- Side mounted straight S318 outreach [YM14]arm
- Pole top adaptor PA76 – for dia 76mm spigot[YM15]
- Twin pole top adaptor PA76 – for dia 76mm spigot[YM16]
Design Spacings
Table 1 from IDS Part 11: Lighting 2013, replicated below, provides the current minimum spacings permitted along local roads.
Table 1 Minimum design spacings along local roads
Legal road width (m) / 20 / 18 / 16 / 14 / 12Minimum design spacing (m) / 42 / 45 / 47 / 50 / 50
Recycled Crushed Concrete (RCC)
The use of Recycled Crushed Concrete materials meeting NZTA (Transit) specifications is approved for ChristchurchCity roads.
Basecourse materials shall meet the TNZ M/4: 2006 specification, as specified in CSS: Part 1 – General, clause 29.4 and detailed on pages 12 and 13 ofthe specification for basecourse aggregate and Appendix 3 of the notes to the specification for basecourse aggregate. Please pay particular attention to the foreign material and special considerations requirements.
Subbase materials shall meet the grading requirements of CCC AP65 specified in CSS: Part 1 – General, clause 29.2. Please pay particular attention to the foreign material and special considerations requirements as above.
[Back to top]
[YM1]Link to 13/508480 acceptable LED luminaires
[YM2]Link to 11/534083 Guidelines
[YM3]Link to LED Luminaire Data Form
[YM4]Make all the bullets links to the drawing pdfs listed in the comments
[YM5]RevB 01
[YM6]RevB 02
[YM7]RevB 03
[YM8]RevB 04
[YM9]RevB 05
[YM10]RevB 06
[YM11]RevB 07
[YM12]RevB 08
[YM13]RevB 09
[YM14]RevB 10
[YM15]RevB 11
[YM16]RevB 12