EPON September Copenhagen
Coordination Table
Updated July 23, 2001
EPON Presentations for September (Draft)
Presentation / Description / Team (see email addresses below)P1 / EPON System Model, Block Diagram, Layer Diagram and Common Terms / EPON block diagram and layering model, framework, terminology / JC K, Wei G, Ryan H, Deepak A, Robert C, Onn H, Ariel M, Ajay G, Kobi M., John P.
P2 / EPON Scope and Requirements / Scope, Requirements, performance guidelines. / Dolors, Glen, JC K, Ryan H, Deepak A., Onn H, Ariel M, Kobi M.
P3 / OPTICS,TXRX and Link Budget Issues / Transceiver issues, improving link budgets, power budget issues / Wael D, Hal R, Robert C, Tom M, Ajay G,
P4 / OPTICS, Link Budget Classes / Defining more than one class of link budget, FEC issues / Hal R, Tom M,
P5 / OPTICS, PMD Proposal, Wavelength Plan / PMD wavelength study and recommendations, P2P Coordination / Gerry P, Hal R, Robert C, Tom M
P6 / OPTICS, Transceiver Guard Band Issues / Transceiver technology and guard band issues / JC K, Hal R, Tom M, Lior K, Ajay G, Jian S
P7 / PROTOCOL Proposals / Additional protocol proposals are forthcoming. Descriptions will be posted when available. / Dolors, John P, Ryan H, Deepak A, Jian S.
P8 / PROTOCOL Proposal / Protocol that incorporates:
Dynamic Slot Assignment layer (DSA layer)
Multiple Point-to-Point Emulation layer (MP2PE layer)
Timing and Slot Control layer (TSC layer) / Hiroshi S, JC K, Glen K, Ariel M, Onn H.
P9 / PROTOCOL: Consolidation of proposals / Summary of commonalties and differences of protocol proposals / Dolors, John P, Ryan H, Deepak A, JC K, Glen K, Hiroshi S, Ariel M, Onn H.
P10
/ SECURITY Issues / Hacking, encryption, redundancy, etc. / Ajay G, Onn H.
P11 / Standards Outline / Outline (Table of Contents) of sections in EPON standards document / Paul N
P12 / Local Operator Perspective / Local carriers viewpoint for EPON
GUIDELINE: Requirements and guidelines for 802.3 Standards. / This will not be a presentation – it will serve as a guideline for the EPON Scope presentation
TIMELINE: EPON and EFM Standards Timeline / This will not be a presentation – it will be used to refine EPON timeline into more detail
Note:
- This table lists EPON “work in progress”. This list will evolve, with topics added and presentations consolidated, and more individuals listed as contributing. The purpose of this list is to serve as a tool to help coordinate presentations.
- An individual “lead” for each of these topics will be identified within the next few weeks – to have a single contact person for each topic to coordinate the effort.
- An EPON email reflector will be set up to help these groups work together.
- Please contact for additions to this list, to be added to the team for a particular topic, or for general suggestions.
- Please see page 2 for email list of individuals currently involved in above presentations.
Email addresses for individuals listed on teams
ADCAlcatel
Alloptic Broadcom
BroadLight
Cisco
Corning
Com21
Infineon
Lucent
Nokia
Passave
PicoLight Quantum B
Salira
SBC
Terawave
EFM Chair / ; ; ;
;
; ; ;
; ; ;
;
; ; ;
;
; ;
; ;;
; ; ;
; ; ;
;
;
;
;
; ;
;
1