Request for Evaluation of New Networked Device
Background
Campus Technology Purchasing Policy ( requires that any computer hardware, software, peripherals or other equipment that is intended to connect to the campus wired or wireless network and/or use any infrastructure building cabling will require consultation with iCIT prior to purchase.
This form is used to request consultation with iCIT to review the impact of connecting new networked device types to the campus network. Requests will be reviewed by the campus Network Architect for technical feasibility and by the iCIT Management Team for consistency with policy and strategic direction.
Please supply the following information:
- Description of new device type
Please provide a brief description of the device. Attach specification sheets or reference to same.
Click here to enter text.
- Anticipated deployment of new device type
Please provide information about where and in what quantities the proposed new devices will be deployed.
Click here to enter text.
- Infrastructure requirements for new device type
Please state the infrastructure needs for the device as you understand them. Examples might include wired network ports, Power-Over-Ethernet (PoE) capability, wireless user accounts, integration with existing systems, etc.
Click here to enter text.
- Capabilities gained by adding this device to the campus network
Please describe the advantages of placing the proposed device on the campus network. What business problems are solved by networking this device? What new capabilities are gained?
Click here to enter text.
- Business impacts if the device cannot be networked
Please describe the impact to business operations if the device cannot be added to the campus network.
Click here to enter text.
iCIT Network Team Review
- Technical review performed by: Click here to enter text.
- Technical review date: Click here to enter text.
- Technical Issues / Concerns
Describe any technical concerns that may arise if the request is fulfilled as written
Click here to enter text.
- Limitations or mitigating controls required
Describe any limitations or mitigating controls that must be put in place to allow the device(s) to safely coexist with other network devices.
Click here to enter text.
- Sunset provisions
Describe any conditions that should trigger re-evaluation of this approval.
Click here to enter text.
- Technical recommendation
Describe whether or not the device(s) create a concern for the integrity or long-term health of the campus network, and whether/how that concern can be addressed.
Click here to enter text.
iCIT Management Team Review
- Management Team review date: Click here to enter text.
- Policy / Process issues or concerns
Describe any concerns relating to policy or process that may arise if the request is fulfilled as written
Click here to enter text.
- Relationship to strategic direction
Describe the extent to which this proposed course of action aligns with strategic direction
Click here to enter text.
- Effective use of resources
Describe the extent to which the proposal’s human and fiscal costs and benefits represent an effective use of limited resources.
Click here to enter text.
- Management decision
Describe whether or not the proposed course of action will be pursued and under what conditions.
Click here to enter text.
Appendix 1 – Approved Network Devices
Device / OS / Configuration / Owner[1] / Approval DateStandard iCIT Desktop w/supported OS / iCIT / 1/23/2012
Standard iCIT laptop w/support OS / iCIT / 1/23/2012
iCIT-purchased tablet device (android or IOS) via campus wireless / iCIT / 1/23/2012
User-owned laptop computer w/supported OS via campus wireless / iCIT / 1/23/2012
User-owned tablet device (android or IOS) via campus wireless / iCIT / 1/23/2012
User-owned smartphone device (android or IOS) via campus wireless / iCIT / 1/23/2012
HawkCard IP converter terminals / UC / 2005
HawkCard Registers / UC / 2010
Johnson Controls / MetaSys Controllers / FP&M / 2005
Cisco Surveillance Cameras / iCIT / 2008
Cisco Digital Signage / ICIT / 2008
Cisco IP telephony equipment / iCIT / 2008
IP-based loudspeakers / iCIT / 2008
Outdoor digital sign / CA / 2010
Request for Impact Assessment for New Networked Device
Version 1.0Last Updated 12/18/2012
[1] The owner for the purpose of this process takes responsibility for ensuring that the device is used consistent with campus policy and any parameters established in the approval process and will serve as appoint of contact on any connectivity or network issues.