July 5, 2018
Background
CDC Kenya would like to setup an additional Internet Service for the on-campus Wi-Fi Network in Nairobi, KEMRI Campus, Mbagathi Road, Kisumu Clinical Research Center (CRC) at JOOTRH and Kisumu – Kisian (KEMRI Campus). CDC Kenya is interested in procuring the services of a suitable contractor for the provision of the Internet Service over the next three year period. The table below details the service requirements.
Type of service / Service requirements / Vendor ResponseSite Visit / Required
POCs:
Nairobi:
- Isaac Wanjero – Tel 0722200171
- Steve Ntabo- Tel 0722769564
Kisumu CRC- James Ndung’u- Tel 0710602781
References / At least two reference sites where similar services have been offered within the last two years
- Internet Service terminated at Nairobi – HQ KEMRI Campus off Mbagathi Way,
- Kisumu - CRC
- Kisumu-Kisian server rooms.
- Option 1
- Kisumu - CRC bandwidth – 4Mbps
- Kisumu-Kisian bandwidth – 4Mbps.
- Nairobi – HQ bandwidth – 8 Mbps.
- Option 2
- Kisumu - CRC bandwidth – 6Mbps
- Kisumu-Kisian bandwidth – 6Mbps.
- Nairobi – HQ bandwidth – 10 Mbps.
- Last mile connectivity:
- fiber
- Physical and logical connection:
- The link shall be terminated on a CDC issued router.
- Performance and monitoring:
- A monitoring system tracking link up/down status and quality with an ability to send threshold-breach alerts via email must be provided
- CDC should be provided credentials to access a graphical monitoring tool for the connections
- Additional requirements
- A Service Level Agreement(SLA) including the downtime compensation tabulated in the “Downtime compensation table” at the end of this document. The SLA should include an escalation matrix, key contacts and a service review calendar.
- A Project implementation plan including Gantt chart with milestones must be provided. The project plan must clearly indicate the estimated installation time across all sites.
- Testing and commissioning- CDC Kenya expects to test the quality of the connections over a period of two weeks to allow for any tweaks as needed. The link shall be commissioned once a “Certificate of completion” has been signed off by the CDC Kenya project manager and the prospective contractor’s assigned lead.
- Description of technical resources involved in the implementation and support of the internet services
Period of Performance /
- Period of Performance
- Year 1 – Base year
- Year 2- Option year 1 (Renewable subject to performance)
- Year 3- Option year 2 (Renewable subject to performance)
Downtime compensation table
Period / Value per hour of downtime / Elaboration06:30 – 18:30 / 1.5x / An hour of downtime will count as 1.5 hours lost
Total downtime between 06:30 and 18:30 shall count as 18 hours lost
18:30 - 06:30 / 0.5x / An hour of downtime will count as 0.25 hours lost
Total downtime between 6pm and 6am shall count as 6 hours lost
Important Note: / Compensation shall be way of a credit note raised against the invoice for the billing period in favor of CDC Kenya
Proposed WiFi Internet Topology