/ consent to construct a vehicle crossing over a footway or verge
highways act 1980 section 184 / S184
LICENCE
APPLICATION
REFERENCE / L184-988 / EXPIRY
DATE / 29/03/2016
WORKS LOCATION
(including Postcode) / Hankham Road
Pevensey
BN24 5AY
Application Date / 17/09/2015
Licence Issue Date / 29/09/2015
Works Description / Construct access to WD/2014/2596 & to drawing no 0102REV P12 & to HT 407 specification ( Contractor to read site specific Below)
Name of Applicant / Mr Rawson
Address of Applicant / Halford House
Leicester
LE1 1HA
Telephone Number / 01162234400

Dear Mr Rawson

In accordance with your recent application and on behalf of the Council, as Highway Authority, I am pleased to grant consent for the construction of a vehicle crossing at the Works Location shown above. I would bring your attention to the following items:

  • This licence expires on the date shown above, but may be extended for 6 months subject to a further payment of £75.
  • Your contractor must comply with the attached standard and site specific conditions
  • Only contractors listed on the attached Buy With Confidence list will be permitted to undertake the works on your behalf.

If you have any queries regarding this consent, please contact us on 01273 482254 or by email at .

Yours sincerely

Alex Jack

Team Manager

Transport Development Control

/ vehicle crossing over a footway or verge
highways act 1980 section 184
STANDARD Conditions / S184
LICENCE

Pre-Commencement Conditions

1)The licensee shall ensure that the works consented under this licence are only be undertaken by a suitable contractor who is registered under the Council’s Trading Standards ‘Buy With Confidence’ scheme.

2)It is the licensee’s responsibility to obtain quotations for the works and to select and appoint his own contractor accordingly. Payment terms must be agreed between the licensee and the contractor. The Council will have no responsibility or liability for any disputes arising.

3)The contractor is required to give the Council a minimum of 7 days notice prior to commencing works, using Form N.

4)The contractor must not start work until plans detailing the statutory undertakers’ and utility companies’ apparatus have been issued to him by the Council.

5)The contractor shall indemnify The Council and Licensee from and against all liability for personal injury, loss or damage to property and any other loss, damage , costs and expenses however caused.

Highway Works Conditions

6)The contractor shall undertake to keep all highway work properly protected and, during the hours of darkness, properly lit and to take every precaution to ensure the safety of the public at all times until the opening or access has been permanently reinstated and the site cleared and regularly maintained during periods of no activity.

7)The contractor shall supply, erect and maintain signing, lighting and guarding of the works in the public highway in accordance with the Safety At Street Works and Road Works Code of Practice (red book), and in accordance with the current edition of Chapter 8 of the Traffic Signs Manual, Traffic Safety Measures and Signs for Road Works and Temporary Situations. This is required to satisfy the client and contractor's responsibilities under the Construction (Health, Safety and Welfare) regulations 1996, the New Roads and Street Works Act 1991 and the Construction (Design and Management) Regulations 2007.

8)All waiting/loading/parking restrictions within the vicinity of the works must be observed at all times. The contractor should seek our advice in advance of the works where this is not possible.

9)No spoil, material or other detritus arising from the works must be permitted to enter into any highway drainage in the area of works.

10)When working on footways, the contractor must maintain a safe passage for pedestrians at all times.

11)The contractor will be held solely liable for any damage they may cause to the highway surface, street furniture, ironwork and overhead/underground services. The Council reserves the right to recover its costs from the contractor in conjunction with any such damage.

12)The contractor must ensure that residents in the immediate vicinity of the works have access to their premises maintained at all times.

13)The contractor must keep his working space clear of all detritus and leave it in a safe and tidy condition at all times. Materials and plant must always be stored within the working space and not on the footway wherever possible.

14)The Council may require to see delivery tickets for materials used in the works and reserves the right to take away material samples for random testing.

15)The contractor shall at all times have at least one operative on the site who has the NRSWA qualification to carry out excavation and reinstatement of the highway.

Post-Construction Conditions

16)The contractor shall upon completion of the works, leave and maintain the site in a safe condition to the satisfaction of the Council.

17)On completing his works, the contractor must notify the Council of such within 3 working days using Form R, along with a good quality, dated, digital photograph of the works.

18)Upon satisfactory completion of the works, the Council will issue a Completion Certificate to the licencee, upon which his obligations under this licence will have been discharged. The Council will also supply a copy of the Certificate to the contractor.

Maintenance of the Works

19)The contractor is responsible for a 12 month maintenance period for the works, which starts upon the issue date of the Completion Certificate, and undertakes to guarantee his workmanship and materials against any defects that may arise.

Adoption of Works

20)Provided that the works are kept defect free, the Council will automatically assume responsibility for the works at the end of the maintenance period.

21)If any of these conditions or special conditions are contravened the Council may withdraw the license and reserves the right prosecute the contractor and/or licensee.

/ vehicle crossing over a footway or verge
highways act 1980 section 184
Site specific Conditions APPLYING TO APPLICATION REF:-L184-988 / S184
LICENCE

Site Specific Conditions:-

No Vehicle Access shall be installed until suitable parking provisions on the property have been constructed.

Contractor to contact Network Coordination to book road space & permit before commencing works 03456080193 Ext 1

/ consent to construct a vehicle crossing over a footway or verge
notice of commencement / S184
FORM N
APPLICATION
REFERENCE / L184-988 / NOTICE
DATE
TO DARREN ARNOLD
EAST SUSSEX COUNTY COUNCIL
TRANSPORT DEVELOPMENT CONTROL
CET DEPARTMENT
C FLOOR W BLOCK
COUNTY HALL
LEWES, BN7 1UE
TEL: 01273 482245
EMAIL: / FROM
TEL
EMAIL

***NOTE: 7 DAYS MINIMUM ADVANCE NOTICE OF YOUR START DATE IS REQUIRED***

EXPECTED
START
DATE / EXPECTED
COMPLETION
DATE
WORKS
LOCATION
(including Postcode) / Hankham Road
Pevensey
BN24 5AY
WORKS
DESCRIPTION / Construct access to WD/2014/2596 & to drawing no 0102REV P12 & to HT 407 specification ( Contractor to read site specific Below)
CONTRACTOR’S
WORKS
SUPERVISOR / Name:
Mobile No:

If you have any queries regarding this Notice, please contact us on 01273 482254 or by email at

/ consent to construct a vehicle crossing over a footway or verge
notice of completion / S184
FORM R
APPLICATION
REFERENCE / L184-988 / COMPLETION
DATE
TO DARREN ARNOLD
EAST SUSSEX COUNTY COUNCIL
TRANSPORT DEVELOPMENT CONTROL
CET DEPARTMENT
C FLOOR W BLOCK
COUNTY HALL
LEWES
BN7 1UE
TEL: 01273 482245
EMAIL: / FROM
TEL
EMAIL

*NOTE: PLEASE SUPPLY A DATED DIGITAL PHOTOGRAPH OF THE FINISHED WORKS*

WORKS
LOCATION
(including Postcode) / Hankham Road
Pevensey
BN24 5AY
WORKS
DESCRIPTION / Construct access to WD/2014/2596 & to drawing no 0102REV P12 & to HT 407 specification ( Contractor to read site specific Below)
REINSTATEMENT
DIMENSIONS

If you have any queries regarding this Notice, please contact us on 01273 482254 or by email at

CD108 Version 1 – 27 May 2013