Completion Procedure
Sills # 2
Page | 1
Inland Ocean
Sills # 2
Victoria County
December 28, 2016
Completion Procedure
Present Status
Elevation:GL: 136.8’; KB: 143.8’; DF: 142.8’
KB Correction:7’
Surface Casing:85/8”,24#, J-55 STC set @ 821’
Intermediate Casing:N/A
Production Casing:4 ½“,10.5#, J-55 @ 5,349’
Total Depth:5,954’
Plug Back Depth:5,909’ ±
Packer :5080’ (Proposed)
Current Perforations:5182’ – 92’ (Proposed)
Directions to Location:(Sills # 1)Take hwy 87 north of of Victoria to Nursery. Turn right on Castillo road, cross RR track & turn right on Nursery Drive. Go 1/10 mile & take left on dirt road between houses & barns. Follow road along fence line that’s on your right. Go past last house on left & gravel yard on right, follow road & fence around to location in middle of field. (Sills # 2 directions pending) CONFIRM DIRECTIONS WITH INLAND OCEAN!!
Objective:Toestablish a commercial completion in the Yegua Formation
Proposed Procedure:
1. MI & RU workover rig. Bleed off pressure and load hole with field salt water.
2. RD tree and RU BOP’s and test. Unload, rack and tally 5500’ of new, 2 3/8” 8rd, 4.7#, J-55 EUE tubing.
3. Make up bit and scraper and RIH to 5300’± and circulate well clean.
4. POH with bit and scraper. MI & RU cased hole logging truck and run Radial CBL, GR, NL, VD, CCL from PBTD to 100’ above the top zone of interest. Additionally, run a strip 100’ below to 100’ above the surface casing shoe. If cement bond is suspect, rerun log with 1000 psi of pressure.
5.Make up redressed 4 ½” Arrowset 1X packer (or equivalent) and RIH. Set same at 5090’±. Test packer and casing to 1000 psi.
6. ND BOP’s and NU tree. Swab well down to 2000’. Confirm perforations with Inland’s office prior to building guns.
7. RIH with 1 11/16" Enerjet or equivalent and perforate from 5182'-92',with 4SPF, 0 degree phased and decentralized. POOH. RD wireline.
8. Flow test well. Swab if necessary. If commercial, install tank battery facilities.
9. Turn well over to gauger.
Prepared by:
J. R. Fischer, PE, General Manager
R. W. Dirks Petroleum Engineer, Inc.
Rig (4 days @ $4000/dy) / $16,000Tubing Head and Tree / $9,000
Tubing ($3.50/Ft.) / $19,250
Rentals (Bit, csg scraper) / $750
Completion Fluid (2% KCl) / $1,500
Cased Hole Logging Services / $8,500
Packer / $4,500
Supervision (4 days) / $5,600
Contingencies (10%) / $6,500
Total / $71,600
Completion Logistics:
- Be sure and have all invoices made out to InlandOcean.
2. Tree - Coastal Bend Wellhead
Corpus Christi, Texas
361-883-7724
Jesse Moreno
361-443-9917 (cell)
3.Logging -P.L.P.S.
Roy Maxwell
361-572-9977 (Off)
361-319-0403 (Cell)
361-676-0938 (Cell 2)
4. Tubing-Watson Pipe
C.C., Texas
Jeff Watson
361-883-5217 (off)
5.Supplies -As Available
6.Packer -Texas Downhole Tools
Victoria, Texas
Stephen Tate
361-578-1123 (off)
7.Trucking -As Available
- Completion Fluid -As Available