Configuration Guide for: Intermittent Resources Net Deviation Settlement / Date: 1/22/145/293/14/14
Settlements & Billing
Configuration Guide: Intermittent Resources Net Deviation Settlement
CC 711
Version 5.25.3
CAISO2018 / Page 1 of 12Settlements & Billing / Version: 5.25.3
Configuration Guide for: Intermittent Resources Net Deviation Settlement / Date: 1/22/145/293/14/14
Table of Contents
1.Purpose of Document
2.Introduction
2.1Background
2.2Description
3.Charge Code Requirements
3.1Business Rules
3.2Predecessor Charge Codes
3.3Successor Charge Codes
3.4Input –External Systems
3.5Inputs – Predecessor Charge Codes or Pre-calculations
3.6CAISO Formula
3.7Outputs
4.Charge Code Effective Dates
CAISO2018 / Page 1 of 12Settlements & Billing / Version: 5.25.3
Configuration Guide for: Intermittent Resources Net Deviation Settlement / Date: 1/22/145/293/14/14
1.Purpose of Document
The purpose of this document is to capture the requirements and design specification for a SaMC Charge Code in one document.
2.Introduction
2.1Background
The Participating Intermittent Resource Program (PIRP) protective measures give certified PIRP resources utilizing older technology a three-year transition period for preparing for and adapting to the functionality of FERC Order 764. The transition period for these resources will run three years from the implementation of the market design changes for FERC Order 764, or until a new bilateral agreement for power purchases is executed for the resource, whichever comes first. If a resource is certified as a PIRP resource and qualifies for the protective measures after the three-year transition period starts to run, the resource will be subject to the protective measures for the remainder of the transition period or until a new bilateral agreement for power purchases is executed, whichever comes first.
The Participating Intermittent Resources will be charged/paid daily in Charge Code 6460 (FMM Instructed Imbalance Energy), Charge Code 6470 (Real Time Instructed Imbalance Energy), Charge Code 6475 (Real-Time Uninstructed Imbalance Energy Settlement) and Charge Code 6486 (Real Time Excess Cost for Instructed Energy Allocation). The prior mentioned settlement amounts will be reversed at the end of the month in Charge Code 722 (PIR Net Deviation Reversal Settlement Amount) for all Business Associates with Net Negative Uninstructed Deviations in the corresponding Trading Month. Then, the PIRP resources will be re-settled inCharge Code 711 (Intermittent Resources Net Deviation Settlement) based on the monthly net uninstructed imbalance energy (UIE) and the weighted-average RTD price over The Trading Month. Net amounts from the sum of the reversal amounts in CC 722 and the resettled amounts in CC 711 is then allocated to net negative deviators for the Trading Month under CC 721 (PIRP Net Deviation Allocation).
2.2Description
CC 711 implements the resettlement of IIE and UIE of resources qualified under PIRP Protective Measures, following the business rules provided in the next section.
3.Charge Code Requirements
3.1Business Rules
Bus Req ID / Business Rule1.0 / Qualified resources under PIRP Protective Measures shall have their IIE and UIE for the month, resettled at the end of each Trading Month.
2.0 / The hourly IIE of a resource under PIRP Protective Measures shall be its hourly scheduleexcluding any Day-ahead schedule. The hourly schedule is provided as a 90-minute-in-advance hourly forecast.
2.1 / This hourly IIE shall be settled at the simple average of the five-minute (RTD) locational marginal prices.
2.2 / This hourly IIE resettlement amounts shall be accumulated at the end of the Trading Month to come up with the monthly value.
3.0 / Deviations between the resource’s actual energy output and the hourly schedule will be netted over each month. This quantity represents the monthly UIE of the resource.
3.1 / The monthly UIE will be settled at the weighted average of five-minute (RTD) locational marginal prices over the month, with weights based on the actual energy output (metered output) of the resource every five-minute over the month.
3.2 / The monthly UIE quantity is also known as the Monthly PIR Net Deviation Quantity, and is calculated daily but settled as a Monthly amount.
4.0 / For adjustments to the Charge Code that cannot be accomplished by correction of upstream data inputs or operator over-ride, Pass Through Bill Charge logic will apply.
3.2Predecessor Charge Codes
Charge Code/ Pre-calc NameReal Time Energy Quantity Pre-calculation
MSS Netting Pre-Calculation
3.3Successor Charge Codes
Charge Code/ Pre-calc NameCC 721 – Intermittent Resources Net Deviation Allocation
3.4Input –External Systems
Row # / Variable Name / Description1 / PIRProtectiveMeasuresFlagBrtmd / PIR Protective Measures Flag for PIRP Resource r.
‘Y’ (or a value of 1) identifies a PIR unit has applied for and grant PIR Protective Measure Treatment and receive separate Settlement calculation of FMM IIE, RTD IIE and UIE.
2 / PIRProtectiveMeasureHourlyForecastQuantityBrtmdh / Hourly forecast for a unit under PIR Protective Measures, with the quantity provided at 90-minute ahead of the Trading Hour. (MWh)
3 / PTBChargeAdjustmentPIRNetDeviationSettlementAmount BJm / PTB Charge Adjustment for PIR Net Deviation Settlement Amount.
3.5Inputs – Predecessor Charge Codes or Pre-calculations
Row # / Variable Name / Predecessor Charge Code/Pre-calc Configuration
1 / BAResDispatchIntervalMeteredGenerationQuantity BrtuT’I’Q’M’AA’R’pPW’Qd’Nz’VvHn’L’mdhcif / MSS Netting Pre-calculation
1 / BASettlementIntervalResCAISOMeteredGenerationQuantity BrtuT’I’Q’M’AA’R’pPW’Qd’Nz’VvHn’L’mdhcif / MSS Netting Prec calculation
2 / SettlementIntervalRealTimeLMP BrtuM’mdhcif / Real Time Price
Resource-Specific Settlement Real Time LMP
3 / HourlyDASchedule Brtmdh / CC 6011 Day Ahead Energy, Congestion, Loss Settlement
3.6CAISO Formula
3.6.1BAMonthlyResourcePIRNetDeviationSettlementAmountBrtm=
BAMonthlyResourcePIRProtectiveMeasuresUIEAmountBrtm + BAMonthlyResourcePIRProtectiveMeasuresIIEAmountBrtm
3.6.2Where
BAMonthlyResourcePIRProtectiveMeasuresUIEAmountBrtm=(-1) * BAMonthlyPIRNetDeviationQuantity Brtm*PIRPSettlementPriceBrtm
3.6.3Where
BAMonthlyPIRNetDeviationQuantityBrtm= BADailyPIRNetDeviationQuantityBrtmd
3.6.4Where
BADailyPIRNetDeviationQuantityBrtmd= BAHourlyResourcePIRNetDeviationQuantityBrtmdh
3.6.5Where
PIRPSettlementPriceBrtm =
(PIREligibleSettlementIntervalMeteredGenerationAmountBrtmdhcif / BAMonthlyPIREligibleMeteredGenerationQuantityBrtm)
3.6.6Where
PIREligibleSettlementIntervalMeteredGenerationAmountBrtmdhcif= (PIREligibleSettlementIntervalMeteredGenerationQuantityBrtmdhcif* SettlementIntervalRealTimeLMP BrtuM’mdhcif)
3.6.7Where
BAMonthlyPIREligibleMeteredGenerationQuantityBrtm= PIREligibleSettlementIntervalMeteredGenerationQuantityBrtmdhcif
3.6.8Where
Balancing Authority Area (Q’) = ‘CISO’
IFPIRProtectiveMeasuresFlagBrtmd= 1
THEN
PIREligibleSettlementIntervalMeteredGenerationQuantityBrtmdhcif=
BASettlementIntervalResCAISOMeteredGenerationQuantity BrtuT’I’Q’M’AA’R’pPW’Qd’Nz’VvHn’L’mdhcif
BAResDispatchIntervalMeteredGenerationQuantity BrtuT’I’Q’M’AA’R’pPW’Qd’Nz’VvHn’L’mdhcif
ELSE
PIREligibleSettlementIntervalMeteredGenerationQuantityBrtmdhcif= 0
ENDIF
3.6.83.6.9Where
BAHourlyResourcePIRNetDeviationQuantityBrtmdh=
(PIREligibleSettlementIntervalMeteredGenerationQuantityBrtmdhcif)- PIRProtectiveMeasureHourlyForecastQuantityBrtmdh
3.6.93.6.10Where
BAMonthlyResourcePIRProtectiveMeasuresIIEAmountBrtm=
BAHourlyResourcePIRProtectiveMeasuresIIEAmountBrtmdh
3.6.103.6.11Where
BAHourlyResourcePIRProtectiveMeasuresIIEAmountBrtmdh=
((-1) *PIRProtectiveMeasuresHourlyIIEQuantityBrtmdh * PIRHourlyAverageRealTimeLMP Brtmdh)
3.6.113.6.12Where
IFPIRProtectiveMeasuresFlagBrtmd= 1
THEN
PIRProtectiveMeasuresHourlyIIEQuantityBrtmdh=
PIRProtectiveMeasureHourlyForecastQuantityBrtmdh - HourlyDASchedule Brtmdh
ELSE
PIRProtectiveMeasuresHourlyIIEQuantityBrtmdh= 0
ENDIF
3.6.123.6.13Where
(IFPIRProtectiveMeasuresFlagBrtmd= 1
THEN
PIRHourlyAverageRealTimeLMP Brtmdh=
Interval Average for hour h of (SettlementIntervalRealTimeLMP BrtuM’mdhcif)
ELSE
PIRHourlyAverageRealTimeLMP Brtmdh= 0
ENDIF)
3.6.133.6.14CAISOTotalPIRNetDeviationSettlementAmountm= BAMonthlyPIRNetDeviationSettlementAmount Bm
Note: This charge type is part of reporting hierarchy and is not configured separately.
3.6.143.6.15Where BAMonthlyPIRNetDeviationSettlementAmount Bm= BAMonthlyResourcePIRNetDeviationSettlementAmount Brtm
Note: This charge type is part of reporting hierarchy and is not configured separately.
CAISO2018 / Page 1 of 12Settlements & Billing / Version: 5.25.3
Configuration Guide for: Intermittent Resources Net Deviation Settlement / Date: 1/22/145/293/14/14
3.7Outputs
Output ID / Name / Description- / All Inputs are also outputs
1 / BAMonthlyResourcePIRNetDeviationSettlementAmount Brtm / PIR Net Deviation Settlement Amount This is the combined IIE and UIE settlement for a resource under PIRP protective measures.
2 / BAMonthlyResourcePIRProtectiveMeasuresUIEAmount Brtm / The UIE component of the monthly settlement for a resource under PIRP protective measures.
3 / BAMonthlyPIRNetDeviationQuantity Brtm / Monthly PIR Net Deviation Quantity, or UIE MWh for a resource under PIRP protective measures. (MWh)
4 / BADailyPIRNetDeviationQuantity Brtmd / Daily PIR Net Deviation Quantity, or UIE MWh for a resource under PIRP protective measures. (MWh)
5 / PIRPSettlementPriceBrtm / Monthly PIR Price by Business Associate per Resource r for Trading Month m.
6 / PIREligibleSettlementIntervalMeteredGenerationAmountBrtmdhcif / The PIR Eligible Metered Generation Amount a resource under PIRP protective measures.
7 / BAMonthlyPIREligibleMeteredGenerationQuantity Brtm / The Total PIR Eligible Metered Generation Quantity for Business Associate B, resource r, resource type t, for Trade Month m.
8 / PIREligibleSettlementIntervalMeteredGenerationQuantity Brtmdhcif / The PIR Eligible Metered Generation Quantity for a resource under PIRP protective measures.
9 / BAHourlyResourcePIRNetDeviationQuantity Brtmdh / Hourly PIR Net Deviation Quantity, or UIE MWh for a resource under PIRP protective measures. (MWh)
10 / BAMonthlyResourcePIRProtectiveMeasuresIIEAmount Brtm / The IIE component of the monthly settlement for a resource under PIRP protective measures.
11 / BAHourlyResourcePIRProtectiveMeasuresIIEAmount Brtm / The hourly assessment of IIE for a resource under PIRP protective measures.
12 / PIRProtectiveMeasuresHourlyIIEQuantity Brtmdh / The hourly difference between 90-minute-ahead forecast to DA Schedule for a resource under PIRP protective measures.
13 / PIRHourlyAverageRealTimeLMPBrtmdh / The hourly simple average of RTD LMP relevant for a resource under PIRP protective measures.
14 / BAMonthlyPIRNetDeviationSettlementAmountBm / PIR Net Deviation Settlement Amount ($) for a given Business Associate and Trading Month.
This charge type is part of reporting hierarchy and is not configured separately.
15 / CAISOTotalPIRNetDeviationSettlementAmountm / CAISO PIR Net Deviation Settlement Amount ($) for a given Trading Month.
This charge type is part of reporting hierarchy and is not configured separately.
4.Charge Code Effective Dates
Charge Code/Pre-calc Name / Document
Version / Effective Start Date / Effective End Date / Version Update Type
CC 711 – Intermittent Resources Net Deviation Settlement / 5.0 / 04/01/09 / 3/31/2009 / Documentation Edits Only
CC 711 – Intermittent Resources Net Deviation Settlement / 5.1 / 04/01/09 / 3/31/2009 / Configuration Impacted
CC 711 – Intermittent Resources Net Deviation Settlement / 5.1a / 04/01/09 / 4/30/14 / Documentation Edits Only
CC 711 – Intermittent Resources Net Deviation Settlement / 5.2 / 05/01/14 / Open9/30/14 / Configuration Impacted
CC 711 – Intermittent Resources Net Deviation Settlement / 5.3 / 10/1/14 / Open / Configuration Impacted
CAISO2018 / Page 1 of 12