[Model Local] Riparian Buffer Protection Ordinance [for Lands within the

Jordan Watershed]

[Municipality/County], North Carolina

Adopted [Date]

THIS PAGE LEFT INTENTIONALLY BLANK

TABLE OF CONTENTS

Section 1. Authority

Section 2. Purpose and Intent

Section 3. Title

Section 4. Jurisdiction

Section 5. Applicability

Section 6. Relation to Other Ordinances

Section 7. Riparian Area Protection within the Jordan Reservoir Watershed

A.Buffers Protected

B.Exemption Based on On–site Determination

C.Exemption when Existing Uses are Present and Ongoing

D.Zones of the Riparian Buffer

E.Diffuse Flow Requirements

Section 8. Potential Uses and Associated Requirements

A.Approval for New Development

B.Table of Uses

C.Requirements for Categories of Uses

Section 9. Permits Procedures, Requirements, and Approvals

A.Determination of No Practical Alternatives / Request for Authorization Certificate

B.Variances

C.Mitigation

Section 10. Compliance and Enforcement

A.Site Inspections

B.Civil Penalties

C.Criminal Penalties

D.Injunctive Relief

Section 11. Severability

Section 12. Effective Date

Section 13. Revisions to this Ordinance

Section 14. Definitions

THIS PAGE LEFT INTENTIONALLY BLANK

Section 1. Authority

This Ordinance is adopted pursuant to the authority vested in [Municipality/County] by the Session Laws and the General Statutes of North Carolina, particularly Session Law 2009-216 (House Bill 239), Session Law 2009-484 (Senate Bill 838), N.C Gen. Stat §153A-121, 153A-140, Chapter 153A, Article 18, N.C. Gen. Stat §160A-174, 160A193, Chapter 160A, Article 19, and any special legislation enacted by the General Assembly for [Municipality/County].

Section 2. Purpose and Intent

The purposes of the [Municipality/County] in adopting the following Ordinance is to protect and preserve existing riparian buffers throughout the Jordan Watershed as generally described in Rule 15A NCAC 02B .0262 (Jordan Water Supply Nutrient Strategy: Purpose and Scope), in order to maintain their nutrient removal and stream protection functions. Additionally this Ordinance will help protect the water supply uses of Jordan Reservoir and of designated water supplies throughout the Jordan watershed.

Buffers adjacent to streams provide multiple environmental protection and resource management benefits. Forested buffers enhance and protect the natural ecology of stream systems, as well as water quality through bank stabilization, shading, and nutrient removal. They also help to minimize flood damage in flood prone areas. Well-vegetated streamside riparian areas help to remove nitrogen and prevent sediment and sediment-bound pollutants such as phosphorous from reaching the streams.

Section 3. Title

This Ordinance shall be known as the [Municipality/County] Riparian Buffer Protection Ordinance [for Lands within the Jordan Watershed].

Section 4. Jurisdiction

This Ordinance shall be applied to [all land in the planning jurisdiction of [Municipality/County] that is located within the Jordan Reservoir Watershed].

Section 5. Applicability

This Ordinance applies to all landowners and other persons conducting activities in the area described in Section 4, with the exception of activities conducted under the authority of the State, the United States, multiple jurisdictions, or local units of government, and forest harvesting and agricultural activities. The NC Division of Water Quality shall administer the requirements of Rule 15A NCAC 02B .0267 and .0268 (Jordan Water Supply Nutrient Strategy: Protection of Existing Riparian Buffers and Mitigation of Existing Riparian Buffers, respectively) for these activities.

Section 6. Relation to Other Ordinances

The requirements of this Ordinance shall supersede all locally implemented buffer requirements stated in Rules 15A NCAC 02B .0214 through .0216 as applied to WS-II, WS-III, and WS-IV waters in the Jordan watershed. If the provisions of this ordinance otherwise conflict with the provisions of any other validly enforceable ordinance(s) or laws, the most stringent provisions shall control. This Ordinance is not intended to interfere with, abrogate, or annul any other ordinance, rule, regulation, or other provision of law.

Section 7. Riparian Area Protection within the Jordan Reservoir Watershed

  1. Buffers Protected

The following minimum criteria shall be used for identifying regulated buffers:

  1. This Ordinance shall apply to activities conducted within, or outside of with hydrologic impacts in violation of the diffuse flow requirements set out in Section 7.(E) upon, 50-foot wide riparian buffers directly adjacent to surface waters in the Jordan watershed (intermittent streams, perennial streams, lakes, reservoirs and ponds), excluding wetlands.
  2. Wetlands adjacent to surface waters or within 50 feet of surface waters shall be considered as part of the riparian buffer but are regulated pursuant to Rules 15A NCAC 2B .0230 and .0231, Rules 15A NCAC 2H .0500, 15A NCAC 2H .1300, and Sections 401 and 404 of the Federal Water Pollution Control Act.
  3. For the purpose of this Ordinance, only one of the following types of maps shall be used for purposes of identifying a water body subject to the requirements of this ordinance:
  1. The most recent version of the soil survey map prepared by the Natural Resources Conservation Service of the United States Department of Agriculture.
  2. The most recent version of the 1:24,000 scale (7.5 minute) quadrangle topographic maps prepared by the United States Geologic Survey (USGS).
  3. A map approved by the Geographic Information Coordinating Council and by the NC Environmental Management Commission. Prior to approving a map under this Item, the Commission shall provide a 30-day public notice and opportunity for comment. Alternative maps approved by the Commission shall not be used for buffer delineation on projects that are existing and ongoing within the meaning of Section 7.(C) of this Ordinance.
  1. Where the specific origination point of a stream regulated under this Item is in question, upon request of the NC Division of Water Quality or another party, the [Municipality/County] shall make an on-site determination. A [Municipality/County] representative who has successfully completed the Division’s Surface Water Identification Training Certification course, its successor, or other equivalent training curriculum approved by the Division, shall establish that point using the latest version of the Division publication, Identification Methods for the Origins of Intermittent and Perennial Streams, available at
    NC_Stream_ID_Manual.pdf or from the NC Division of Water Quality - 401 Oversight Express Permitting Unit, or its successor. The [Municipality/County] may accept the results of a site assessment made by another party who meets these criteria. Any disputes over on-site determinations made according to this Item shall be referred to the Director of the Division of Water Quality c/o the 401 Oversight Express Permitting Unit, or its successor, in writing. The Director’s determination is subject to review as provided in Articles 3 and 4 of G.S. 150B.
  2. Riparian buffers protected by this Ordinance shall be measured pursuant to Section 7.(D) of this Ordinance.
  3. Parties subject to this Ordinance shall abide by all State rules and laws regarding waters of the state including but not limited to Rules 15A NCAC 2B .0230 and .0231, Rules 15A NCAC 2H .0500, 15A NCAC 2H .1300, and Sections 401 and 404 of the Federal Water Pollution Control Act.
  4. No new clearing, grading, or development shall take place nor shall any new building permits be issued in violation of this Ordinance.
  1. Exemption Based on On–site Determination

When a landowner or other affected party including the Division believes that the maps have inaccurately depicted surface waters, he or she shall consult the [Municipality/County]. Upon request, a [Municipality/County] representative who has successfully completed the Division of Water Quality’s Surface Water Identification Training Certification course, its successor, or other equivalent training curriculum approved by the Division, shall make an on-site determination. The [Municipality/County] may also accept the results of site assessments made by other parties who have successfully completed such training. Any disputes over on-site determinations shall be referred to the Director of the Division of Water Quality c/o the 401 Oversight Express Permitting Unit, or its successor, in writing. A determination of the Director as to the accuracy or application of the maps is subject to review as provided in Articles 3 and 4 of G.S. 150B. Surface waters that appear on the maps shall not be subject to these buffer requirements if a site evaluation reveals any of the following cases:

  1. Man-made ponds and lakes that are not part of a natural drainage way that is classified in accordance with 15A NCAC 2B .0100, including ponds and lakes created for animal watering, irrigation, or other agricultural uses. (A pond or lake is part of a natural drainage way when it is fed by an intermittent or perennial stream or when it has a direct discharge point to an intermittent or perennial stream.)
  2. Ephemeral streams.
  3. The absence on the ground of a corresponding intermittent or perennial stream, lake, reservoir, or pond.
  4. Ditches or other man-made water conveyances, other than modified natural streams.
  1. Exemption when Existing Uses are Present and Ongoing

This Ordinance shall not apply to uses that are existing and ongoing; however, this Ordinance shall apply at the time an existing, ongoing use is changed to another use. Change of use shall involve the initiation of any activity that does not meet either of the following criteria for existing, ongoing activity:

  1. It was present within the riparian buffer as of the effective date of this Ordinance and has continued to exist since that time. Existing uses shall include agriculture, buildings, industrial facilities, commercial areas, transportation facilities, maintained lawns, utility lines and on-site sanitary sewage systems, any of which involve either specific, periodic management of vegetation or displacement of vegetation by structures or regular activity. Only the portion of the riparian buffer occupied by the footprint of the existing use is exempt from this Ordinance. Change of ownership through purchase or inheritance is not a change of use. Activities necessary to maintain uses are allowed provided that the site remains similarly vegetated, no impervious surface is added within 50 feet of the surface water where it did not previously exist as of the effective date of this Ordinance, and existing diffuse flow is maintained. Grading and revegetating Zone Two is allowed provided that the health of the vegetation in Zone One is not compromised, the ground is stabilized and existing diffuse flow is maintained.
  2. Projects or proposed development that are determined by the [Municipality/County] to meet at least one of the following criteria:
  3. Project requires a 401 Certification/404 Permit and these were issued prior to the effective date this Ordinance, and prior to the effective date of this Ordinance.
  4. Projects that require a state permit, such as landfills, NPDES wastewater discharges, land application of residuals and road construction activities, have begun construction or are under contract to begin construction and had received all required state permits and certifications prior to the effective date of this Ordinance;
  5. Projects that are being reviewed through the Clean Water Act Section 404/National Environmental Policy Act Merger 01 Process (published by the US Army Corps of Engineers and Federal Highway Administration, 2003) or its immediate successor and that have reached agreement with DENR on avoidance and minimization by the effective date of this Ordinance; or
  6. Projects that are not required to be reviewed by the Clean Water Act Section 404/National Environmental Policy Act Merger 01 Process (published by the US Army Corps of Engineers and Federal Highway Administration, 2003) or its immediate successor if a Finding of No Significant Impact has been issued for the project and the project has the written approval of the [Municipality/County] prior to the effective date of this Ordinance.
  1. Zones of the Riparian Buffer

The protected riparian buffer shall have two zones as follows:

  1. Zone One shall consist of a vegetated area that is undisturbed except for uses provided for in the Table of Uses, Section 8.(B) of this Ordinance. The location of Zone One shall be as follows:
  1. For intermittent and perennial streams, Zone One shall begin at the top of the bank and extend landward a distance of 30 feet on all sides of the surface water, measured horizontally on a line perpendicular to a vertical line marking the top of the bank.
  2. For ponds, lakes and reservoirs located within a natural drainage way, Zone One shall begin at the normal water level and extend landward a distance of 30 feet, measured horizontally on a line perpendicular to a vertical line marking the normal water level.
  3. Zone Two shall consist of a stable, vegetated area that is undisturbed except for uses provided for in the Table of Uses, Section 8.(B) of this Ordinance. Grading and revegetating in Zone Two is allowed provided that the health of the vegetation in Zone One is not compromised. Zone Two shall begin at the outer edge of Zone One and extend landward 20 feet as measured horizontally on a line perpendicular to the surface water. The combined width of Zones One and Two shall be 50 feet on all sides of the surface water.
  1. Diffuse Flow Requirements

Diffuse flow of runoff shall be maintained in the riparian buffer by dispersing concentrated flow prior to its entry into the buffer and reestablishing vegetation as follows:

  1. Concentrated runoff from new ditches or man-made conveyances shall be converted to diffuse flow at non-erosive velocities before the runoff enters Zone Two of the riparian buffer;
  2. Periodic corrective action to restore diffuse flow shall be taken as necessary and shall be designed to impede the formation of erosion gullies; and
  3. As set out in Sections 7.(D) and 8.(B) of this Ordinance, The Zones of the Riparian Buffer and Table of Uses respectively, no new stormwater conveyances are allowed through the buffers except for those specified in the Table of Uses, Section 8.(B) of this Ordinance, addressing stormwater management ponds, drainage ditches, roadside ditches, and stormwater conveyances.

Section 8. Potential Uses and Associated Requirements

  1. Approval for New Development

[Municipality/County] shall issue an approval for new development only if the development application proposes to avoid impacts to riparian buffers defined in Section 7.(A) of this Ordinance, or where the application proposes to impact such buffers, it demonstrates that the applicant has done the following, as applicable:

  1. Determined the activity is exempt from requirements of this Ordinance;
  2. Received an Authorization Certificate from the Division pursuant to Section 9.A of this Ordinance;
  3. For uses designated as Allowable with Mitigation in the Table of Uses in Section 8.(B), received approval of mitigation plan pursuant to Section 9.(C) of this Ordinance; and
  4. Received a variance pursuant to Section 9.(B).
  1. Table of Uses

The following chart sets out potential new uses within the buffer, or outside the buffer with impacts on the buffer, and categorizes them as exempt, allowable, or allowable with mitigation. All uses not categorized as exempt, allowable, or allowable with mitigation are considered prohibited and may not proceed within the riparian buffer or outside the buffer if the use would impact the buffer, unless a variance is granted pursuant to Section 9.(C) of this Ordinance, Variances. The requirements for each category are given in Section 8.(C) of this Section following the Table of Uses.

Use / Exempt* / Allowable* / Allowable with Mitigation*
Access trails: Pedestrian access trails leading to the surface water, docks, fishing piers, boat ramps and other water dependent activities:
  • Pedestrian access trails that are restricted to the minimum width practicable and do not exceed 4 feet in width of buffer disturbance, and provided that installation and use does not result in removal of trees as defined in this Ordinance and no impervious surface is added to the riparian buffer
  • Pedestrian access trails that exceed 4 feet in width of buffer disturbance, the installation or use results in removal of trees as defined in this Ordinance or impervious surface is added to the riparian buffer
/ X / X
Airport facilities:
  • Airport facilities that impact equal to or less than 150 linear feet or one-third of an acre of riparian buffer
  • Airport facilities that impact greater than 150 linear feet or one-third of an acre of riparian buffer
  • Activities necessary to comply with FAA requirements (e.g. radar uses or landing strips)1
/ X
X / X
Archaeological activities / X
Bridges / X
Canoe Access provided that installation and use does not result in removal of trees as defined in this Ordinance and no impervious surface is added to the buffer. / X
* To qualify for the designation indicated in the column header, an activity must adhere to the limitations defined for it in a given listing as well as the requirements established in Section 8.(C) of this Ordinance.
Dam maintenance activities:
  • Dam maintenance activities that do not cause additional buffer disturbance beyond the footprint of the existing dam or those covered under the U.S. Army Corps of Engineers Nationwide Permit No. 3
  • Dam maintenance activities that do cause additional buffer disturbance beyond the footprint of the existing dam or those not covered under the U.S. Army Corps of Engineers Nationwide Permit No.3
/ X / X
* To qualify for the designation indicated in the column header, an activity must adhere to the limitations defined for it in a given listing as well as the requirements established in Section 8.(C) of this Ordinance.
Drainage ditches, roadside ditches and stormwater conveyances through riparian buffers:
  • New stormwater flows to existing drainage ditches, roadside ditches, and stormwater conveyances provided flows do not alter or result in the need to alter the conveyance and are managed to minimize the sediment, nutrients and other pollution that convey to waterbodies.
  • Realignment of existing roadside drainage ditches retaining the design dimensions, provided that no additional travel lanes are added and the minimum required roadway typical section is used based on traffic and safety considerations.
  • New or altered drainage ditches, roadside ditches and stormwater outfalls provided that a stormwater management facility is installed to control nutrients and attenuate flow before the conveyance discharges through the riparian buffer
  • New drainage ditches, roadside ditches and stormwater conveyances applicable to linear projects that do not provide a stormwater management facility due to topography constraints provided that other practicable BMPs are employed.
/ X / X