POWER SUPPLY

Aviastar OPE CJSC – technical connection

Regulatory and legal base:

Decree of the Ministry of Economics Ulyanovsk Region dated 03 February 2011 No. 06-12

RATES

for technical connection of power receivers

(power units) to the power grid of Aviastar OPE CJSC

with voltage less than 35 kV and connection power less than 10,000 kVA

№ / Rate for technical
connection to one power source,
rub./kW (exc. VAT)
Connection of applicant's units
to a cell (transformer substation, distribution transformer substation, distribution substation, substation) / Connection of applicant's units
to power lines
voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is not required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is not required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is required)
1. / Applicants, other than those shown in point 2 of this table
5,965.00 / 5,965.00 / 5,965.00 / 5,965.00
2. / Applicants who are legal entities or sole traders for technical connection for one power supply source for power receivers, maximum capacity up to 100kW inclusive (taking into account previous connection to this power connection point);
applicants for temporary (no more than 6 months) technical connection of their power receivers for providing electricity for mobile objects with maximum capacity up to 100kW inclusive (taking into account previous connection to this power connection point);
applicants who are physical entities, for technical connection of power receivers, whose maximum capacity is up to 15kW inclusive (taking into account previous connection to this power connection point), which are for everyday and other needs not related to conducting business activities and whose power supply is provided by one source.
5,961.14 / 5,961.14 / 5,961.14 / 5,961.14

SESNa LLC – purchase of electricity

Regulatory and legal base:

Decree of SESNa LLC No. 58 dated 30.12.2010

PRICE LIST

for electricity supply to legal entities,

obtaining electricity from SESNa LLC (excluding VAT)

Valid from 1 January 2011

No. / Indicator / Measurement unit / Voltage range
HV / MV-1 / MV-2 / LV
а) / Flat rate depending on the number of hours power is used in a year
from 7,001 hours and less / kopeck/KWh / 140.98 / X / 140.98 / 140.98
from 6,500 to 7,000 hours / kopeck/KWh / 149.63 / X / 149.63 / 149.63
from 6,000 to 6,500 hours / kopeck/KWh / 153.22 / X / 153.22 / 153.22
from 5,500 to 6,000 hours / kopeck/KWh / 163.18 / X / 163.18 / 163.18
from 5,000 to 5,500 hours / kopeck/KWh / 165.95 / X / 165.95 / 165.95
less than 5,000 hours / kopeck/KWh / 180.15 / X / 180.15 / 180.15
b) / Dual rate
- charge for capacity / rub./kW-month / 285 / X / 285 / 285
- charge for power / kopeck/KWh / 102.83 / X / 102.83 / 102.83
c) / Differentiated tariff according to time of the day
- night time / kopeck/KWh / 78.48 / X / 78.48 / 78.48
- semi peak time / kopeck/KWh / 171.85 / X / 171.85 / 171.85
- peak time / kopeck/KWh / 276.41 / X / 276.41 / 276.41

MUP UlGES

Regulatory and legal base:

Decree of the Ministry of Economics Ulyanovsk Region dated 03 February 2011 No. 06-15

RATES

for technical connection of power receivers

(power units) to the power grid of MUP UlGES

with voltage less than 35 kW and connection power less than 10,000 kVA

№ / Rate for technical
connection to one power source,
rub./kW (exc. VAT)
Connection of applicant's units
to a cell (transformer substation, distribution transformer substation, distribution substation, substation) / Connection of applicant's units
to power lines
voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is not required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is not required) / voltage class shown in the application corresponds with connection voltage to an existing power grid unit (voltage transformation is required)
1. / applicants, other than those shown in point 2 of this table
9,863.0 / 11,806.0 / 9,863.0 / 11,806.0
2. / applicants who are legal entities or sole traders for technical connection for one power supply source for power receivers, maximum capacity up to 100kW inclusive (taking into account previous connection to this power connection point);
- applicants for temporary (no more than 6 months) technical connection of their power receivers for providing electricity for mobile objects with maximum capacity up to 100kW inclusive (taking into account previous connection to this power connection point);
- applicants who are physical entities, for technical connection of power receivers, whose maximum capacity is up to 15kW inclusive (taking into account previous connection to this power connection point), which are for everyday and other needs not related to conducting business activities and whose power supply is provided by one source.
9,831.0 / 11,774.0 / 9,831.0 / 11,774.0

Regulatory and legal base:

1. MINISTRY OF ECONOMICS ULYANOVSK REGION, DECREE dated 27 December 2010 No. 06-503

SINGLE (BOILER) TARIFFS

FOR POWER TRANSMISSION

IN ULYANOVSK REGION

No.
/ Indicator / Measure-ment
unit / Voltage range
HV / MV-I / MV-II / LV
1 / 2 / 3 / 4 / 5 / 6 / 7
1. / The general public and consumers equal to the general public
1.1. / Flat rate
tariff
(excluding VAT) / rub./MWh / 350.0 / 350.0 / 350.0 / 350.0
1.2. / Dual rate (excluding VAT)
1.2.1. / - rate for
electricity
grid
maintenance / rub./MW-
month / 4,491.29 / 4,491.29 / 4,491.29 / 4,491.29
1.2.2. / - rate for
technical
expenses (losses) in
electricity
grids / rub./MWh / 10.0 / 10.0 / 10.0 / 10.0
2. / Other consumers, with the exception of those stated in p. 1
2.1. / Flat rate
tariff
(excluding VAT) / rub./MWh / 1,406.75 / 1,659.37 / 2,165.23 / 2,442.84
2.2. / Dual rate (excluding VAT)
2.2.1. / - rate for
electricity
grid
maintenance / rub./MW-
month / 516,174.66 / 695,540.53 / 700,451.11 / 998,955.21
2.2.2. / - rate for
technical
expenses (losses) in
electricity
grids <1> / rub./MWh / 694.78 / 700.00 / 702.00 / 724.31