ArmaKleen Cleaning Evaluation Form pg. 1

DATE SUBMITTED:

CUSTOMER NAME:

CUSTOMER NUMBER:

SK REPRESENTATIVE:

SK REPRESENTATIVE EMAIL:

SK REPRESENTATIVE CELL #:

SK BRANCH NAME:

SK BRANCH PHONE NUMBER:

SK BRANCH ADDRESS:

CUSTOMER OBJECTIVE: (check all that apply. Please do not write in “clean the parts” as an objective)

Improve their cleaning performance Reduce their cleaning costs

Automate their cleaning process Eliminate hazardous chemicals/waste

Reduce rework and reject rate Recover scrap parts

Clean mixed metals together Reduce VOCs

Other (describe):

MAXIMUM ALLOWABLE TIME TO CLEAN PART:

Up to 15 minutes 15 to 30 minutes 30 minutes to 1 hour 1 to 2 hours

2 to 4 hours 4 to 8 hours 8 to 24 hours More than 24 hours

(specify):

SUBSTRATE:(check all that apply)

Steel/Iron Stainless Steel AluminumCopper/Brass Glass Plastic

Other (describe):

SOIL(S) TO BE REMOVED: (check all that apply)

NOTE: If multiple soils are used, please identify the part(s) with the type of soil in the Comments Section.

Shop Dirt Grime Drawing Lube Baked on Carbon

Oil Cutting Fluids Grease Rust/Oxides

Glue/Adhesive Silicone Wax Asphalt

Other Soil (describe):

Epoxy E-Coat Paint Epoxy Powder Coat PaintPolyester Powder Coat Paint

Acrylic Powder Coat Paint Hybrid Powder Coat PaintLiquid Alkyd Paint

Liquid Polyester Paint Liquid Acrylic PaintLiquid Urethane Paint

Liquid Epoxy Paint Other Paint (describe):

Flexographic InkLithographic Ink Soy-based InkGravure Ink

UV InkScreen InkWater-based Ink Other Ink (describe):

SERVICE TYPE:TARGETTED WASHER TYPE: (check all that apply)

EAC Agitating Immersion (81.8 or equivalent)

COMS Spray Under Immersion

ArmaKleen Direct Spray Washer

Other Ultrasonic

Tech Center please choose the best machine for the job

Notes:

DEGREE OF CLEANLINESS NEEDED:

General Maintenance (90 -95% clean) Machined Parts (90-99% clean) Precision Parts (95-99% clean)

Specialty Cleaning (>99% clean, discuss with ArmaKleen representative before sending)

SIZE AND SHAPE OF PARTS: (Check all that apply)

Small (nuts and bolts)Mid-sized (pistons) Large (engine block) Very Large (truck cab)

NUMBER OF PARTS CLEANED PER DAY:

1-5 5-50 50-200 200 or more

CURRENT PROCESS: (check all that apply)

Manual Manual Soak (like Model 91)Automated Soak

Automated Spray In-Line Spray Ultrasonic

Hand-Held Pressure WashSteam Clean Vibratory Drum/Barrel

Burn-Off OvenOutside stripping serviceScrap parts

Abrasive Blast (describe type):

CURRENT CLEANING PROCESS STEPS:

Step 1 / Step 2 / Step 3 / Step 4
Process Step
Product Used
Concentration
Temperature
Contact Time
Machine Type

Example:

Step 1 / Step 2 / Step 3 / Step 4
Process Step / Clean / Rinse / RP Rinse
Product Used / ABC Co X50 / Fresh Water / ABC CO RP-3
Concentration / 5% / Overflowing / 3%
Temperature / 160F / Ambient / 140F
Contact Time / 20 minutes / 1 minute / 1 minute
Machine Type / Spray Washer / Dunk tank / Dunk tank

APPLICATION & MISCELLANEOUS INFORMATION:(Please describe any additional application information in this section. Include pH, VOC or other environmental restrictions. Include any special process requirements)

Version: April 2016