Application for Permission for Minerals and Waste DevelopmentForm MW Part 2

FORM MW PART 2: Mineral Extraction and Waste Disposal
Additional information required if the application is for the extraction
of minerals or waste disposal
(5 completed copies of this form should be submitted). /

For Office Use Only

Application No. ……………………..
Date Received ……………………..
1.MINERAL EXTRACTION

A.SITE DETAILS AND PLAN REQUIREMENTS

(i)Total area of land covered by the application, (including all storage and stockpile bunds, the haul route and access to public highway and other ancillary operations and structures). Edge this area in red on the plan / ……………………...……… Hectares
Plan Ref:- ………………………………
(ii)Type(s) of Mineral to be extracted / …………………………………………...
(iii)Proposed area(s) of Mineral extraction.
Please detail on plan including areas in the application from which minerals have previously been extracted. / ……………………………….. Hectares
Plan Ref:- ………………………………
  1. TECHNICAL DETAILS AND PLAN REQUIREMENTS
(i)(a) Estimated thickness of topsoil
(b) Estimated thickness of subsoil
(c) Estimated thickness of overburden / ………………………………….. metres
………………………………….. metres
………………………………….. metres
(ii)Level of existing water table in land in relation to the existing surface level.
Please detail B (i) and B (ii) in cross section form. / ………………………………….. metres
Plan Ref:- ………………………………
(iii)Present contours of the application site and surrounding land. / Plan Ref:- ………………………………
C.OPERATIONAL DETAILS AND PLAN REQUIREMENTS
(i)Method, direction, estimated rate of working and phasing of working.
Please detail in plan form and describe in supporting written statement / Plan Ref:- ………………………………
…………………………………………...
…………………………………………...
(ii)Estimated maximum depth of working below existing ground level.
Please detail in cross-section form. / ………………………………..… metres
Plan Ref:- ………………………………
(iii)Estimate of total quantity of mineral to be extracted. / ………… metres3 ………… tonnes
(iii)Estimate of net saleable mineral to be extracted. / ………… metres3 ………… tonnes
(v)(a)Estimate of annual quantity of mineral to be extracted.
(b)Estimate of annual quantity of saleable minerals. / ………… metres3 …………. tonnes
………… metres3 …………. tonnes
(vi)Estimated life of workings / ………… years ………….. months
(vii)Will excavations extend below the local water table?
Will explosives be used on site?
Will restoration involve the importation of landfill material?
If yes please remember to answer the questions in Section 2 (Waste Disposal) / (Yes/No)
(Yes/No)
(Yes/No)
  1. WASTE DISPOSAL
  1. SITE DETAILS AND PLAN REQUIREMENTS
(i)Total area of land covered by the application, (including all storage and Stockpile bunds, the haul route and access to public highway and other ancillary operations and structures). Edge this area in red on the plan. / ………………………..……… Hectares
Plan Ref:- ………………………………
Comments:- ……………………………
(ii)Category of waste to be deposited. Please Tick and List
Inert waste: Waste which will not biodegrade or decompose (or, will oly do so at a very slow rate). Types of materials include uncontaminated topsoil; subsoil; clay; sand; brickwork; some concrete; stone; silica; and glass
Degradable (or Non-Hazardous) waste: Waste, which will quickly or slowly biodegrade or decompose, releasing environmental pollutants. Types of material include wood and wood products; paper; plasterboard; ash; plastic; leather; rubber; textiles; cardboard; vegetable matter; food processing wastes; sewage sludge; metals and chemical combination thereof; coke; coal; mica; diatomaceous earth; slag; boilerscale, soap; cellulose; floor sweepings; sacks; electrical fittings; and appliances; machinery; cosmetic products; tarred materials; carbon; ebonite; pottery; china; enamels; abrasives; trees; bushes; grass; flowers and other vegetation.
Special (or Hazardous) waste: Special wastes are the most dangerous wastes and include hazardous or toxic wastes. They are listed in the Special Waste Regulations 1996. Wastes are not Special if the hazardous properties set out in the Regulations are absent for any reason. Types of material include acids, alkaline solutions; batteries; oil; fly ash; industrial solvents; oily; sludges; pesticides; pharmaceutical compounds; photographic; chemicals; waste oils; wood preservatives. / Inert waste: …………………………….
…………………………………………...
Degradable (or Non-Hazardous) waste: …………………………………..
…………………………………………...
…………………………………………...
…………………………………………...
…………………………………………...
Special (or Hazardous) waste: ………
…………………………………………...
…………………………………………...
…………………………………………...
…………………………………………...
(iii)Proposed area(s) of tipping.
Please detail on plan and include areas in or near the application upon which waste has previously been tipped and what category of waste. / ……………………………… Hectares
Plan Ref:- ………………………………
B.TECHNICAL DETAILS AND PLAN REQUIREMENTS
(i)(a) Estimated thickness of topsoil
(b)Estimated thickness of subsoil
(c)Estimated thickness of overburden / ………………………………….. metres
………………………………….. metres
………………………………….. metres
(ii)Level of existing water table in land in relation to the existing surface level.
Please detail i. and ii. In cross section form. / ………………………………….. metres
Plan Ref:- ………………………………
(iii)Present contours of the application site and surrounding land. / Plan Ref:- ………………………………
C.OPERATIONAL DETAILS AND PLAN REQUIREMENTS
(i)Method, direction, estimated rate of tipping and phasing of working
Please detail in plan form and describe in written statement supporting the application. / Plan Ref:- ………………………………
(ii)Estimated maximum pre-settlement depth of tipping below existing ground level/or above existing ground level.
Please detail in cross-section form. / ………………..………… metres below
……………………….… metres above
Plan Ref:- ………………………………
(iii)Estimate of total capacity of site / …….……… metres3 ..….…….. tonnes
(iv)Estimate of annual/monthly quantity of waste to be deposited. / .……………………metres3 per annum
…………………….. tonnes per annum
(if tipping for less than a year please give monthly figure)
(v)Estimate life of tipping operations. / ………….. years ………….. months
(vi)Proposed starting date of waste disposal if consent is given / …………………………………………...
  1. PLANT AND BUILDINGS

(a)(i)Does the proposal involve the erection of plant or buildings?
(If yes, please provide details of location, size, materials, colours in plan and include drawings of elevations) / (Yes/No)
(ii)Are the minerals to be treated on the site before their removal? / (Yes/No)
(b)Will use be made of plant authorised under earlier permissions? / (Yes/No)
c)Describe briefly all the plant, structures and buildings to be erected on site including the output of the plant.
(d)In respect of the proposed plant, buildings and structures, are any of the following aspects to be reserved for detailed approval?
Siting
Design
External Appearance / (Yes/No)
(Yes/No)
(Yes/No)
(e)Does the application involve the use or storage of any hazardous substances? If yes state what it is and in what quantities. / (Yes/No)
(f)How will waste water form processing plant, foul sewage and other water either present on, or draining into the site, be disposed off?
  1. RESTORATION, LANDSCAPING AND AFTERCARE.

(a)Method, direction, phasing and timescale of restoration/regrading.
Please detail in plan and/or cross-section from the post-settlement contours and describe if necessary in written statement. / Plan Ref:-
(b)Landscaping Proposals
If you require advice on this matter please contact the Mineral Planning Authority. / Plan Ref:-
(c)Aftercare Proposals/future landuse of site.
N.B: A detailed statement of a five year aftercare programme will need to be submitted to the Mineral Planning Authority within one year if consent is given for the application. / Plan Ref:-

5.WORKING HOURS

Weekdays / ……………………. a.m. to …………………… p.m.
Saturday / ……………………. a.m. to …………………… p.m.
Sunday / ……………………. a.m. to ………………….. p.m.
Bank or Public Holidays
  1. TRAFFIC AND TRANSPORT

(a)Give details of the anticipated average and maximum number of lorry movements to and from the site EACH DAY
(N.B. one round trip = two movements)
Mineral transport lorries
Landfill transport lorries (Not skip lorries)
Skip Lorries
Other lorries
Total / ADM – average daily movements
MDM – maximum daily movements
ADM MDM
………………….……………………
………………….……………………
………………….……………………
………………….……………………
………………….……………………
(b)What is the anticipated typical size of the lorries when unladen?
Mineral transport lorries
Landfill transport lorries (Not skip lorries)
Skip Lorries
Other lorries (e.g. builders lorries) / .…………………………………... tonnes
……………………………………. tonnes
….………………………………… tonnes
……………………………………. tonnes
(c)What are the main locations to which waste material will be dispatched?
(Please estimate approximate proportions) / (a) ………………..…………….. %
(b) ………………..…………….. %
(c) ………………..…………….. %
(d) ……………….…………….. %
(d)Describe the route to be used by lorries between the site and a main road (i.e. ‘A’ class road or motorway and if the return route is different, please give details).
(e)What are the main locations from
Which waste material will be received
(Please estimate approximate proportions) / (a) ………………..…………….. %
(b) ………………..…………….. %
(c) ………………..…………….. %
(d) ……………….…………….. %
(f)Does the proposal involve the construction of a new access or alteration to an existing access to or from a public highway? / (Yes/No)
(g)What measures will be taken to remove the mud from the wheels of lorries before they enter the public highway?
(h)If transportation by any means other than lorries is envisaged, please give details.
LIST HERE THE PLANS, DRAWINGS, SECTIONS AND DOCUMENTS WHICH ARE TO FORM PART OF THIS APPLICATION. (Please ensure each plan, drawing and section is clearly titled and numbered. Any intended for illustrative purposes only, and therefore not forming part of the application, should be clearly labelled to this effect).
Number Title
……………………..…………………….………………………………………………………………….
……………………..………………………………………………………………………………………..
……………………..………………………………………………………………………………………..
……………………..………………………………………………………………………………………..
……………………..………………………………………………………………………………………..
……………………..………………………………………………………………………………………..
……………………..………………………………………………………………………………………..
.
……………………..…………………………………………………………………………………….….
……………………..………………………………………………………………………………………..

I/We hereby apply for planning permission to carry out the development described in this application and on the attached plans, drawings, sections, and documents.

Signed……………………………………… On behalf of ………………………………… Date ……………………..

NOTE: This application is for planning permission only and does not convey any consent which may be required under building regulations, or the legislation relating to statutory undertakers equipment, rights of way, listed buildings, advertisements, water and pollution control, mines and quarries safety legislation, etc.